10-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 10 PIPE.

Slides:



Advertisements
Similar presentations
5-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 5 THERMOSTATS.
Advertisements

3-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 3 PRINCIPLES.
7-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Croucher, Introductory Mathematics and Statistics, 5e Chapter 7 Annuities.
13-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 13 LIQUIFIED.
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
4.1.8 Student Book © 2004 Propane Education & Research CouncilPage Selecting Piping and Tubing After completing the gas customer profile and examining.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
Superior vena cava The superior vena cava carries deoxygenated blood to the heart. The blood comes from the upper body.
AIR FLOW IN DUCTS Shaharin Anwar Sulaiman
7-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 7 IGNITION.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
System Effects Presented by: Joe Brooks, AMCA International, Inc. AMCA International Technical Seminar 2009.
2 ND EDITION ROD JONES Copyright © Pearson Australia (a division of Pearson Australia Group Pty Ltd) 2010 PowerPoint presentation to accompany.
Determination of Vacuum Pump Operational Efficiency By: D K Singhal Chandpur Enterprises Ltd. 1.
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Introductory Mathematics & Statistics
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
2-1 Chapter 2 PRESSURE AND THE MEASUREMENT OF PRESSURE Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack,
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.7 Student Book © 2004 Propane Education & Research CouncilPage Selecting Regulators for Vapor Distribution Systems Regulators are mechanical.
Dealer Certification Section 2: Building the Network Physical Planning & Documentation Power Sources & Distribution Voltage Drop Calculations Copyright.
1-1 Chapter 1 GAS TYPES MARKETED IN AUSTRALIA Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn.
Evaporators For Air Conditioning
Oil Pressure Problems What to look for.
1 HVACR316 - Piping Related Codes Trade Math 1 Related Codes Trade Math 1.
Hydraulics For The Long Term
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
Assignment No. 1 [Grup 8] Figure below shows a portion of a hydraulic circuit. The pressure point B must be 200 psig when the volume flow rate is 60 gal/min.
8-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 8 CONTROL.
9-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 9 FLUING.
Excess Flow Valves – Implementation Challenges Bill Norton PIPES Act of 2006 PIPES Act of 2006 EFVs EFVs Anthony Cadorin City Of Mesa Sizing Procedures.
Domestic Natural Gas Installations Marc Billington.
Water piping design.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Gasfuse™ South Africa Business Overview GasFuse™ South Africa Ltd is the appointed Key Master Distributor of GasFuse™ for and on behalf of Premier Fosters.
NCSX Helium Bakeout System M. Kalish 3/25/02
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
10 Frequently Asked Questions about Center Pivots Gulf Coast Irrigation Conference Sinton, November 18, 2008 Guy Fipps Professor and Extension Agricultural.
Air Conditioning International Mechanical Code
12-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 12 METERS.
6-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 6 SAFETY.
HVACR116 – Trade Skills Longest length method.
1 HVACR316 - Piping Related Codes Trade Math I Related Codes Trade Math I.
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Copyright  2003 McGraw-Hill Australia Pty Ltd PPTs t/a Budgeting, second edition, by Banks & Giliberti Slides prepared by Mya Aronfeld 5-1 Chapter 5 Budgeted.
14-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 14 SAFETY.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Hydraulics is defined as the study of fluid behavior, at rest and in motion Properly designed piping with sound hydraulics can: - Greatly reduce maintenance.
6-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Croucher, Introductory Mathematics and Statistics, 5e Chapter 6 Compound.
Chapter 4 REGULATORS 4-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
At the Ballarat City Gate Construction and Commissioning of a Shell and Tube Heat Exchanger Speaker: Godwin Wong.
Handling, Moisture Management, and Storage of Biological Products.
Boiler Safety Valve Regulations
Gas fitting line Sizing.
Design, Evaluation and Application of a Fuel Cell Vehicle
Plumbing system fundamental and design course
Presented by.
Engineering Project Cable Management.
Tracer Applications.
Boiler Safety Valve Regulations
Determination of Vacuum Pump Operational Efficiency
Presentation transcript:

10-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 10 PIPE INSTALLATIONS

10-2 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Pipe installations Must be carried out by an authorised installer. Basic standards for the design and location of pipes and materials to be used are governed by an Australian Standard (AS 5601). AS 5601 covers installation of appliances for use with natural gas, LPG, SNG or TLP. Administrative, gas supply and metering requirements are determined by the local authority. The installer must obtain all relevant information before commencing work.

Purging of gas services Purging is the replacement within a vessel of one medium with another. For gas fitting this is either replacing air (or inert gas) with gas on new lines, or replacing the gas with air or inert gas on existing lines Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Testing of gas services It is important for every joint on a gas service to be tested for soundness prior to charging with gas and/or lighting an appliance. New pipework is tested using air or inert gas to a minimum pressure and time limit—refer to AS The minimum test time is determined by the volume of the piping. Existing installations are tested for soundness prior to lighting an appliance Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Pipe-sizing installations Consideration must be given to the factors that affect the flow of gas through pipes. 1. Length of pipe. 2. Number of fittings used. 3. Specific gravity of the gas. 4. Material type of the pipe or tube. 5. Nominal size of pipe Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Determining pipe size Information required a) The type of gas. b) The gas rate in megajoules of each appliance to be used on the installation (consideration of future needs). c) Pipe configuration, lengths of each section, number and type of fittings. d) The static pressure of the installation. e) Meter outlet pressure and/or allowable pressure loss of installation. f) Diversity factors Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Adding appliances to existing installations Check the meter, regulator and inlet service are capable of meeting the additional load. Pipe-size existing installations to determine adequate capacity for carrying the additional load Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Pipe-sizing Gas type Material Index length Appliance loads Pressure drop 10-8 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Note: Letters marked at branches and appliances.

Pipe-sizing two-stage installations Two-stage installations use the same principles as single-stage installations, except that each stage is sized using tables applicable to the pressure rating of each section. As the pressure setting of the first-stage regulator is relatively high a much higher pressure drop is used, which results in smaller pipe sizes than lower pressure regulators Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Two-stage piping index length The index length for the first-stage section is from the regulator to the most disadvantaged (furthest) second- stage regulator. The index length for the second stage is from the second-stage regulator to the furthest appliance it serves Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e

Pipe installation—Summary Installation of piping to comply with AS Pipe size factors –Gas type –Gas load for installation –Piping configuration –Pressure loss for installation –Material –Diversity factors Testing and purging is part of the installation of piping Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e