Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Team Uno 11/11/04 Bunker Curnes Product Assembly.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Click on this image to open the full PDF document.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Chapter Four Planes To insert your company logo on this slide
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Progress on the Coupling Coil & Focus Coil Interface Engineering
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Fasteners and Thread Repair
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Fasteners and Thread Repair 08 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Introduction Lathe is a machine, which removes the metal from a piece of work to the required shape &size The basic lathe that was designed to cut cylindrical.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Correspondence with HuntVac
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
2016/9/30 Yasuhiro Infra/CFS mini-ws
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
826YD 21/2”-10”.
SiD Muon Yoke Structure - Deformation Studies -
Automotive Engines Theory and Servicing
IHEP group Shashlyk activity towards TDR
FRESCA2 Update on the dipole design and new calculations
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
HCAL Modules -First Ideas
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Assembly instructions for M-K all bolt together hoppercone kit.
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
Additional Upstream Coil Shielding
Additional Upstream Coil Shielding
Segmented Woodturning Symposium October, 2018 James Rodgers
Four Jaw Collimator.
450DA 4”-10”.
Automotive Engines Theory and Servicing
Presentation transcript:

Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside the magnet with the help of a support structure holding the segment inside the magnet Secure the Segment at 4 locations along the 4m length with bolts running all the way through the 6” filler plate, the ring-Girder and to the helical coil mounted inside the Aluminum segment of the Barrel Place the next segment, secure it with the bolts and repeat the above procedure for all the 46 remaining segments A total of 192 bolts are required to hold the 48 individual segments of the Barrel calorimeter(48 bolts at one location to hold the segment)

Barrel Calorimeter Assembly Procedure Coil 1 Iron-Yoke1 Step1. Coil 1 inserts into the Iron yoke1 Step2. 6 inch Iron plate and the Ring girder is bolted to the yoke Step3. Similarly all the other 4 Iron-yokes, coils and Ring-Girders are positioned in place Ring-Girder Click for the next slide

Barrel Calorimeter Assembly Procedure Step1. Coil 1 inserts into the Iron yoke1 Step2. 6 inch Iron plate with the Ring girder is bolted to the yoke Step3. Similarly all the other 3 Iron-yokes, coils and Ring-Girders are positioned in place Coil 1 Iron-Yoke1 Ring-Girder 6 Inch Plate Rollers

Iron Yoke Coil 6 Inch Plate Ring Girder Barrel Calorimeter

48 Threaded Rods holding the 48 Barrel Calorimeter modules Heli-coil insert in the aluminum plate Cut To accommodate the vacuum port

-Design 2 This design involves assembling the barrel Calorimeter outside the magnet Individual modules of the barrel calorimeter are assembled inside the 2cm thk carbon-fiber cylinder supported by a structure The upper modules are bolted to the carbon-fiber cylinder The cylinder is rolled into the magnet on rollers fixed to the ring-girder 10 tones Hilman-rollers are located at three points on the circumference of the ring-girder This option of assembling the barrel calorimeter provides us ample amount of time to assemble the barrel in par with the hall construction Reduces the labor involved in fixing the 192 threaded rods into the barrel and extending it to the out-side of the filler plate 10 threaded rods are installed to hold the cylinder and the Barrel Calorimeter in place once it has been assembled in the magnet

HELI-COIL INSERT SUPPORT STRUCTURE HOLDING THE CARBON-FIBER CYC Carbon-Fiber Cyc SETUP FOR ASSEMBLING THE BCAL OUTSIDE THE MAGNET

3 Rollers Bolted to the Ring-girder R65cm R92.5