Tracker Summary Alan Bross MICE CM October 10, 2007.

Slides:



Advertisements
Similar presentations
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Preparation for Station Acceptance Test
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Tracker Station QA Acceptance Test Rig Status
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Tracker Summary Alan Bross MICE CM October 10, 2007

Tracker Stations  12 of 15 complete (includes LED scan) u Last three only require machine carbon-fiber support frame  station bundling connectorising gluing polishing =========================================================  5 done done done done  6 done done done done  7 done done done done  8 done done done done  9 done done done done  10 done done done done  11 done done done done  12 done done done done  13 done done done done  14 done done done done  15 done done done done  16 done done done done  17 done done done done  18 done done - -  19 done done - -

Station Light Yield QC  We are still working on LY QC procedure and data analysis. Will QC all stations for Tracker 1 before assembling  Source moves parallel to plane of station  Choice of Sr90 or Co57  Limited to straight lines (arbitrary angle & offset) for QA purposes  Absolute position reproducible to  2 μm Sourc e V W X V W X Active Area Motion Axis 1 Motion Axis 0 Sourc e Cross-section: Tracker Station

Tracker 1 Assembly

Cryo and Readout  Production cryostats 1 and 2 are complete u They have been fully characterized u However, the AFE backplanes still need to be installed u And final AFE electrical/power test (see slide)  Cryostat #3 is nearing completion. Should be ready for first cooldown in about 2 weeks u Cassettes have been released from D0  Cryostat #4 still needs cassettes.  We have tentative agreement in place with D0 for the additional 2 cassettes needed for Cryostat #4 u George Ginther asked for a document detailing how the cassettes will be operated, environmental conditions, fault analysis and safety precautions, personnel training, etc. s The first draft is complete and has been reviewed by George. Some issues were identified (crane operation in MICE Hall for example) and are being addressed. The document is being updated

Tracker Racks  The Wiener power supplies for the AFE boards have arrived and Bill Luebke and and John Fogelsong have developed a plan for power distribution. The cable runs and lengths for the power and LVDS cables have now been set u Assembly of the final rack(s) has begun u LVDS Cables have been ordered (10m length) u Components for power cabling (cables, fuse assemblies, connectors) have been ordered.  The plan is to fully test the racks (one for two cryostats) at Fermilab to make sure that AFE operation is correct. u Power conversion will then have to occur when the equipment arrives in the UK u This is the critical path and will determine when the system can be shipped to RAL

AFEIIt Power Distribution

Weiner Power Supply (+5.5, +5,  12, +3.3)V Trunk Line Fuse Panel Cryo 2 Drop Cryo 1 Drop

Schedule for Tracker Services Rack  Goal: u Test Cryo 1 and 2 electrically as full system at Fermilab s All AFEIIts, LVSBs, Low-voltage power and distribution cables u Crate and ship to RAL u Have at RAL by November 5, 2007 (1 week uncertainty at the moment).

Tracker Readout Electronics Preparation for Cosmic Ray Test  Finish firmware by Oct. 5 (Still working on VLSB)  Run cryostat/AFE-IIt/VLSB tracker readout tests at FNAL from Oct. 8 – 19. (Set to start)  Ship tracker readout system by Oct. 29 (was Oct. 22)  Unpack tracker readout system at RAL by Nov. 5 (may slip to Nov. 12)

AFE-IIt Boards  8 boards for 2 cryostats fully tested and characterized.  4 boards assigned to 3 rd cryostat, not yet tested and characterized  11 spare boards available, 4 of which will be assigned to 4 th cryostat.  23 AFE-IIt boards available for MICE

VLSB Boards  Parts and boards are at FNAL.  Technicians have started stuffing boards.  First 1 or 2 boards may be done in ~ 1 week.  FNAL will test basic functionality of data registers.

Electronics Summary  Preliminary firmware package being set up for data readout tests at FNAL u Some work still remaining  Cryostat characterization and VLSB board assembly ongoing  End in sight for full firmware for MICE (~ 600 triggers/ms)

R8 Cosmic Ray Test  We are on track to start full system test (Tracker, CKOV, TOF, KL, DAQ, L1 Trigger) in second half of November Top plate Patch Panel M24 screwed rod ~484mm ~2630mm