Project Update: A Possible New RF FOIL for the VELO UPGRADE Ray Mountain, Sheldon Stone Syracuse University.

Slides:



Advertisements
Similar presentations
EDR-1 December 16/17, 2002 Hans de Vries - 1 Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure 
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Vrije Universiteit amsterdam CERN, November 27, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand Subatomic.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
April 15, 2002 NIKHEF-1 Hans de Vries Status RF foil Projects in progress: Rectangular bellows Wakefieldsuppressors EMI measurements RF/vacuum foil  Production.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
(An open-ended discussion with random slides attached…) OUTLINE: Layouts Common Issues / Distinguishing Issues U-Shape L-Shape (Si and Si+Diamond) How.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
John Amann – ILC Mechanical Engineering 11/13/06
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
EDR - Mech. 2; December 16/17, 2002 Hans de Vries - 1 Status of Vertex at NIKHEF VELO Mechanics  RF/vacuum foil  Rectangular bellow  RF measurements.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
Mon. 20 October 2003 SO/EUS Proto-consortium Meeting Mechanical Design Dr Douglas Griffin 1 Solar Orbiter Extreme Ultaviolet Spectrometer Conceptual Mechanical.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
56 MHz SRF Cavity and Helium vessel Design
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
VELO Decisions Thomas Ruf LHCb week February 2001 Interference with LHC machine   LEMIC, January 2001: Presentation of the VELO Vacuum Chamber design.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Status of the RF-box for the VELO Upgrade Frans Mul, Mike de Jong, Johan Kos, Herman Boer Rookhuizen, Eddy Jans, Tjeerd Ketel Slides are for 95% from Tjeerd.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
SPS High Energy LSS5 Thermal contact & cooling aspects
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Anti project. F. Raffaelli. INFN CERN, April 05 th, Thermal Analysis of the Anti transportation. -Calculation of the manhole loads due to the valve.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Halo Collimation of Protons and Heavy Ions in SIS-100.
Developing Radiation Hard Silicon for the Vertex Locator
Wideband kickers Mechanical design and Fabrication
Micro-channel Cooling
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
Follow up of LHCb RF box studies
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Simulated vertex precision
Antti Onnela CERN – EP – Detector Technologies group
N.Biancacci, E.Métral, B.Salvant
CEPC Vacuum System Dong Haiyi 2017/11/5.
Beam Pipe Meeting Introduction
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Discussion on the TDI impedance specifications
Phase II Collimators : design status
CEPC Vacuum Systems Design Consideration
The LHCb VErtex LOcator
Michail Anastasopoulos Lead Detector – Design Engineer
Presentation transcript:

Project Update: A Possible New RF FOIL for the VELO UPGRADE Ray Mountain, Sheldon Stone Syracuse University

R. Mountain, Syracuse University VELO Update, 5 Nov\ RF FOIL (1) -- R&D PLAN Phase I Objective: Produce a quarter-length RF Foil prototype, incorporating all difficult design features needed. –Collaboration with CMA, Inc. (compositemirrors.com) –Develop a new high performance material, likely a multi-function nanocomposite material. A candidate formulation has been identified (X 0 ≈ ½ AlMg3) –Develop processing procedures for the materials and structure shape –Optimize material and process parameters by series of coupon samples –Fabricate the ¼-length prototype, incorporating the foil surface, sides, and flange in one integrated piece (no sealing) –Test and evaluate performance characteristics, including metrology, thickness uniformity, vacuum permeability, etc. –Build “accelerator simulator” as RF shielding test chamber (at SU) Evaluation Phase: Evaluate viability of prototype material and structure. Perform radiation damage testing, involve CERN LHC experts for determination of its operation in primary vacuum, etc. Phase II Objective: Design and fabricate real RF Foil for LHCb upgrade. Plan to begin Phase I in December, but awaiting funding decision (expected soon)...

R. Mountain, Syracuse University VELO Update, 5 Nov\ (extras)

R. Mountain, Syracuse University VELO Update, 5 Nov\ RF FOIL & RF BOX cross section ~1mm INSIDE VIEW OF RF-BOX MOUNTED IN VACUUM VESSEL Separates modules from beam vacuum Foil is 300 um AlMg3, coated with insulator and getter Foil shape set by overlapping sensors and beam clearance and beam effects Large area: 200 x 1000 mm 2 Maximum allowed pressure differential: 5 mbar (=> 10 kg = 22 lb) Shields against beam-induced EMI Wakefield suppressors to adapt beam pipe geometry Was a huge engineering effort (NIKHEF) CURRENT DESIGN FOIL

R. Mountain, Syracuse University VELO Update, 5 Nov\ RF FOIL REQUIREMENTS Physics: –Must not allow excessive multiple scattering should have the smallest radiation length possible (e.g., low Z) in acceptance should minimize total material before first measured point [MFL,PC] –Must allow detectors to overlap, for reasons of tracking (i.e., no acceptance gaps) and alignment will have complicated corrugated shape –Must get as close as possible transversely to IP must allow approach to be < ~7.mm (original design goal was 5.mm, accelerator limit in 2001) –Must stand high radiation environment without degradation in mechanical or electrical properties must withstand ~500 Mrad dose [MA,PC] Mechanical: –Separate primary vacuum <1e-9 mbar (accelerator) from secondary vacuum ~1e-4 mbar (detector), and maintain this ultra-high vacuum level must have no pinholes or virtual leaks outgassing must be minimal –Must mechanically hold differential vacuum of ~5.mbar (transient) to ~1e-4 mbar (steady) without rupturing or even deflecting so as to touch sensors (1 mm clearance) must be strong (to this level of load) must be stiff must have low fatigue, for repeated pumpings must hold mechanical stability and accuracy (tolerances) Electrical: –Must shield against RF EMI pick-up effects from accelerator (noise in detectors) must provide enough RF skin depth thickness (T<10 -3 ) must be made at least partly of good conductor must reduce any surface/skin effects (?) [MFL] –Must not electrically short sensors if contact is made must have inner insulating surface or coating Thermal: –Must handle heating effects (electronics, beam wakefield) and cooling effects (modules, bb radiation) and not thermally deform so as to damage sensors must have sufficiently low CTE from about +40ºC down to -30ºC (? plus beam heating) wakefield power dissipation can be large (~kW) –Perhaps like it to help with cooling the electronics [pref not req’d] low emissivity surface (or coating), or actual cooling of foil (active/passive) [SB] would need then to bleed off heat away from sensors Beam (Electrodynamic): –Must suppress wakefield impact on beams need smooth geometry to reduce effects [MFL] need continuous electrical contact from one end to the other [MFL] should have a small beam aperture [PC] –Must be “dynamic”-vacuum-compatible (i.e., effects due to presence of beam, which means ion-induced desorption, synchrotron radiation, electron multipacting) [MFL] so need NEG coating on UHV side, which as low (ion-, photon-, electron-) desorption coefficient

R. Mountain, Syracuse University VELO Update, 5 Nov\ Composite Mirror Applications Inc. Initial conversations very promising –They are interested in this project CMA has experience producing: –Many space-based mirrors and structures for NASA –Spherical mirrors for LHCb RICH-1 –Prototype mirrors for BTEV RICH Manufacture technique –Compression molding replication Make forms (positive + negative) Lay up sheets of CF “cloth” and “uni” with resin Apply elevated pressure and temperature to forms, resin flows, squeezes layup to required thickness –Can replicate features down to 3 mm (or maybe smaller), as long as they are on the forming mandrel –Can make many types of structures, can make exact duplicates of structures as well –Have good control of thickness variations –Have solved adhesion problem in vacuum (delamination, so-called) 18 years experience in high strength Aluminum adhesion to polymers Used in many space (vacuum) applications Good corporate partner for R&D

R. Mountain, Syracuse University VELO Update, 5 Nov\ FIRST ORDER DESIGN (1) Keep same design as current foil –same geometric form of foil and box –as a basis for discussions, for now Replace AlMg3 by CFRP composite –plus Al deposition and NEG on accelerator side –plus insulator deposition on VELO side (n.b. CF is conductive) Produce foil + box + flange as a single integrated unit –Avoids welding foil to box, and other sealing problems –No seams, better for vacuum tightness Investigate the critical issues using this first-order design … FOIL BOX FLANGE “straw man”