SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.

Slides:



Advertisements
Similar presentations
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Advertisements

MGNREGS-AP Convergence with other schemes
Potential of convergence with NREGS and Inland fishery in rainfed area By: Neelkanth RRA Network.
SUCEES STORY OF BANGRIPOSI BLOCK FOR THE YEAR
Chief Executive Officer Jharkhand Watershed Mission
Hampden Estate Established 1753 Trelawny, Jamaica.
NIALI PANCHAYAT SAMITI, CUTTACK WELCOMES YOU ALL 26/04/2010.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
NIALI PANCHAYAT SAMITI, CUTTACK WELCOMES YOU ALL BDO,CONFERENCE 12/11/2010.
Pranahita – Chevella Project PHASE - II
T.F.C AWARD. PHYSICAL AND FINANCIAL ACHIEVEMENT UNDER T.F.C. FOR THE YEAR Sl. No ComponentO.B as on Funds received Total fund availabl.
Protection of flood and soil erosion by Vetiver Plantation : An experiment at three G.P.s of Arambagh Block in Hooghly District. Arambagh faces severe.
Prof. P.B.S. Bhadoria Dr. P.K. Bhowmick Dr. A. Mishra Rural Development Centre Indian Institute of Technology, Kharagpur Kharagpur (W.B.) – Impact.
PRESENTATION ON THE CONVERGANCE OF NBA WITH MGNREGA IN DAVANAGERE DISTRICT OF KARNATAKA DAVANAGERE 12 TH SEPTEMBER, 2013.
Monetary Assessment on Multiple Functions of Irrigation Water for Paddy Fields in the Asian Monsoon Region March 18, 2009 Kazumi YAMAOKA, PhD International.
Experimental Example #1. MNB water tank outline chart *Usage Pump (electric pumps, pump engine) 1.5 kw ~ 5kw *MNB devices: pieces The number of.
TADIPUDI LIFT IRRIGATION SCHEME
Presentation on development works of Boipariguda Block Brief Note On BOIPARIGUDA BLOCK.
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
Frogs lay their eggs in ponds. the eggs grow. Slowly, they turn into tadpoles. The tadpoles grow and change. they become frogs. the frogs hop. they can.
Implementation process of Mahatma Gandhi NREGS. At GP level Schemes deals with MGNREGS, TFC, KL Grant, GP Fund. MGNREGS Maintaining of Case Record in.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
DISTRICT RURAL DEVELOPMENT AGENCY, KENDRAPARA Success Story Presented By:- PANCHAYAT SAMITI Mahakalapara Dist-Kendrapara.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
Current Electricity - Symbols Draw the symbol for each electrical device.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PRI & BNV Retreat Hyderabad Presentation by D.K.Jain Jt. Secretary MGNREGA Divison, MoRD 22 nd Sept; 2012.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
Planning process Participation of community in the process
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
Purulia Drought Proposal Mandra Lions Club. Rainfall distribution in India.
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
FOR WORKSHOP OF ENGINEERS
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
1 Regional Training Institute, Ranchi Structured Training Courseware on State Receipt Audit Audit of Water Rate Receipts.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
Development Block Paonta Sahib Implementation of IWMP- SIRMOUR-II(EPA)
Panchayati Raj Department Welcome to the Presentation on MGNREGS-Orissa Panchayati Raj Department Government of Orissa.
Successful implementation of M.G.N.R.E.G.S at Rajkanika Block, Dist-Kendrapara.
AQUACULTURE FACILITIES [objectives]
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
1 Pradhan Mantri Gram Sadak Yojana Rural Roads Programme Delivery of Rural Services and Infrastructure Critical to the Millennium Development Goals 18.
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
NARASINGHPUR PANCHAYAT SAMITI, CUTTACK WELCOMES YOU ALL 26/04/2010.
Group-IV.  Planning process  MGNREGS status  Impact  Learning's  Way forward for IPPE-2.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GURANTEE SCHEME
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Terhune Orchards- ●Family run business ●Fruit and vegetable farm ●Open to the public ●Care for our land, our community and our future.
Institutionalizing People’s Participation in Water Resources Planning & Manageme nt- गाँव बढ़े तो देश बढ़े Taking Rural India >> Forward.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
INTERNATIONAL YEAR OF WATER CO OPERATION 2013
ENGINES FOR GROWTH NATURAL RESOURCES HUMAN RESOURCES Technology
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Thing / Person:____________________ Dates:_________________
NEW INDIA 2022 INDIA 75 Department of Rural Development.


Presentation transcript:

SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR

SUCCESS STORIES OF NREGS N/P-Imp. Of Padmapokhari at Bataharichandanpur. EC-3.00 lakhs Year Executing Agency-GP Date of Commencement Date of Completion Water Reservoir Area-0.5 Acr. Ayacut Area – 2Ha Mandays Generated: 6500 The People are using water for cultivation by lifting device and the visitors coming to the Tarini Pitha are taking bath in this tank.Approximately 200 people are benefitted.

Imp. Of Padmapokhari at Bataharichandanpur

NREGS-2 N/P-Excavation of Khuntapokhari at village Khunta EC-5.00 lakhs Year Executing Agency-GP Date of Commencement Date of Completion Mandays created-2256 Reservoir Area-1.00Ac Ayacut Area-2.50 Ha

Excavation of Khuntapokhari

NREGS-3 N/P-Imp. Of road from Patabari to Purumunda GP office. EC-5.00 lakhs Year Executing Agency-GP Date of Commencement Date of Completion Mandays created-2870 Length of road-1.50 Km No. of People benefitted-5000 It facilitates better communication from GP office to other villages.

Imp. Of road from Patabari to Purumunda GP Office

NREGS-4 N/P-Imp. Of Mahulgadia Majhisahi Tank. EC-5.00 lakhs Year Executing Agency-PS Date of Commencement Date of Completion Mandays created-3420 Water Reservoir Area-1.50 Ac Ayacut Area-3.00 Ha

Imp. Of Mahulgadia Majhisahi Tank

NREGS-5 N/P-Farm Pond of Bharat Dehury of Badabarabeda GP-Purumunda EC-0.50 Year Executing Agency-Soil Conservation Deptt. Date of Commencement Date of Completion Mandays created-560 Water Area of reservouir-0.4 Ac Ayacut Area-0.50 Ha The beneficiary will be benefited in the farm pond with cultivation of fish during rainy season and also cultivation of land by lifting device.

Farm Pond of Bharat Dehury