17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.

Slides:



Advertisements
Similar presentations
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Overview of the LHC Year End Technical Stop
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ELENA installation progress F. Butin / ELENA collaboration.
Collimation Activities during EYETS
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
EYETS LHC 2016/2017 Works EN/EL/CF
SHORT LHC-TS Coordination meeting #1
LHC Experimental Vacuum Systems Status October ‘07
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
Mathieu, Gabriel, Max, Spyros, Guillaume
Status of the BI Work Package in the LIU-PSB frame
WPs concerned by L4 connection:
Cryogenic Risk Assessment in LHC
K. Foraz on behalf of OSS members
Technical Stop #4 29th August - 2nd September 2011
LHC installation status
US-LARP Task: IR Commissioning
US-LARP Task: IR Commissioning
Technical Stop #4 29th August - 2nd September 2011
Presentation transcript:

17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule

Draft sum of durations Warm-up4wks From RP OK to enter HLS removal & IT reference6 days (hidden time if OK from RP during warm-up) From RP OK to disconnect IT disconnections4wks QRL modifications ???? Transport - Jacks (removal & new)4wks Alignement1wk Interconnections15wks Leak test2 wks 30 wks

Draft and summarized schedule Warm-up SU Disconn.Transport SU Disconn.LT SU Disconn.Transport SU Disconn.LT Disconn.Transport SU Disconn.LT Disconn.Transport SU Disconn.LT SU 1 machine for disconnection and 1 set of transport equipment SU Disconn.Transport SU Disconn.LT SU Disconn.Transport SU Disconn.LT Disconn.Transport SU Disconn.LT Disconn.Transport SU Disconn.LT SU 2 machines for disconnection and 2 sets of transport equipment Not including QRL modifications

List of activities 1. Main ring 1.1 Removal 1.2 Installation 1.3 Tests 2. UJ 2.1 Removal 2.2 Installation 2.3 Tests

List of activities – 1. Main ring Removal Services HLS & WLS removal3dH. Mainaud-Durand IT survey references3dH. Mainaud-Durand BLM, BPM, PMIL removal1d WCC removal2wJ.-C. Guillaume Cryo instrumentation removal ? ? Electrical general services modification ??J. Pierlot Machine removal TAS displacement ?ATLAS & CMS IT disconnections4wJ.-P. Tock QRL modifications ? ? D1 disconnections ? ? ? Transport and jacks~2wS. Bartolome Vacuum chambers & supports removal ? V. Baglin

List of activities – 1. Main ring Installation Services Transport and Jacks2wS. Bartolome Alignment1w H. Mainaud-Durand HLS & WLS installation2wH. Mainaud-Durand BLM, BPM, PMIL installation ? Machine Interconnections15wJ.-P. Tock Leak tests2wP. Cruikshank Cryo intrumentation ? ? TAS replacement and VAC chamber ? ? VAC between IT and TAN ?V. Baglin

List of activities – 1. Main ring Tests Cool-down ELQA QPS Powering tests

List of activities – 1. UJ Removal Sheilding3dS. Pelletier Access system (per system)1dE. Sanchez (from point 1 to point 2, and from point 5 to point 2) Wire fencing Racks reorganization : what is to be done ? Installation DFBX installation1dC. Bertone DFBX connections with IT WCC ? Or other type of cables DQR and DQS installation Tests Short circuit tests ?