Quality and Productivity Lab ENGR 1181. Q&P in the Real World Many industries use assembly lines to speed up production, reduce costs, and improve safety.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Inventory Management, Just-in-Time, and Simplified Costing Methods
Inventory Management, Just-in-Time, and Simplified Costing Methods
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Management: Analysis and Decision Making
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-In-Time and Lean Systems
MSE507 Lean Manufacturing
Summary: Review of Lean Principles
Solar Energy Labs – Part 1 ENGR Today's Learning Objectives  After today's class, students will be able to: Describe and build both a calibration.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
JIT and Lean Operations
CONTINUOUS IMPROVEMENT PROGRAM
Overview of Lean Six Sigma
Lean for Process Manufacturing QAD Midwest User Group Meeting Stephen Dombroski – September 2011.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Operations Management
JIT and Lean Operations
Solar Energy Labs – Part 1 ENGR Solar Meters in the Real World A real world application of using solar light to generate power is describe in this.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-in B8 SUPPLY CHAIN MANAGEMENT.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Solar Energy Labs – Part 2 ENGR Solar Cells in the Real World Solar panels are becoming commonplace. We’re most familiar with fields or rooftops.
Wind Turbine Lab (Part A)
Circuits Lab ENGR 1181 Lab 3.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
Circuits Lab ENGR 1181 Lab #3. Circuits in the Real World Many engineering fields and products require the use of circuits. Some are more complicated.
Lean Basics Dewey Warden.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 8.1 SUPPLY CHAIN FUNDAMENTALS.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Philosophy and Key Concepts
Lean Production (MUDA)
Beam Bending Lab ENGR 1181 Lab # 6.
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
Engineering Design Process GK12 Module 6 th Grade Science Traci Abney.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Baseline Data Measure Kaizen Facilitation. Objectives Define data types and purpose Explain concepts of efficiency and effectiveness Provide tips on establishing.
Circuits Lab Introduction
College of Engineering ENGR 1181 Engineering Education Innovation Center Quality and Productivity Lab.
Eng 1181 College of Engineering Engineering Education Innovation Center Marble Delivery System Introduction Lab 1.
Estimating Project Benefits ISE Sr. Design
“Without the Cost of Waste …”
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Circuits Lab ENGR 1181 Lab 3. Circuits in the Real World All engineering fields employ electronic circuits – electric cars, biomedical devices, computers,
7 Types of Waste –C –Correction –O –Overproduction –M –Movement of Material & Information –W –Waiting –I –Inventory –P –Processing Lean Principle: Lean.
Solar Energy Lab 1 ENGR Today's Learning Objectives  After today's class, students will be able to: Describe and build both a calibration and solar.
College of Engineering Solar Energy Meter Lab 4 Engineering Education Innovation Center ENGR 1181.
ENGR 1181 College of Engineering Engineering Education Innovation Center Solar Cell Lab 5 Intro.
College of Engineering Problem Solving Lab Final Build & Testing Lab – Problem Solving C Engineering Education Innovation Center ENGR 1181.
First-Year Engineering Program Solar Cell Lab Investigation of Solar Cells How Solar Cells work Understand different characteristics and their impact on.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
Beam Bending Lab Introduction
Marble Delivery System Lab ENGR 1181 Lab #1. Build a tower, build a team  Effective teamwork is the basis for team success
College of Engineering Wind Turbine – Part A Engineering Education Innovation Center ENGR 1181.
College of Engineering Problem Solving Lab Lab – Problem Solving Lab A Engineering Education Innovation Center ENGR 1181.
Supply Chain Customer Order Decoupling Point
Mel Wendell – Mountain Pointe High School
Chapter 27 Cost Management for Just-in-Time Environments
Supply Chain Management Principles
Pull Manufacturing and Just In Time
Manufacturing and Service Operations
Wind Turbine Lab (Part B)
Continuous Improvement”
MODERN TRENDS IN PRODUCTION ENGINEERING
Problem Solving Lab – Part C
Operations Management
F3 - THE TECHNIQUES AND TOOLS OF QUALITY MANAGEMENT
Presentation transcript:

Quality and Productivity Lab ENGR 1181

Q&P in the Real World Many industries use assembly lines to speed up production, reduce costs, and improve safety. The automotive and food industries are well known users of assembly lines. What assembly line industries can we think of?

This an example of the assembly line for the Southwest Airlines Florida One. Southwest Airlines Florida One

Today's Learning Objectives  After today’s class, students will be able to: Discuss the importance of engineering in manufacturing processes. State that Industrial Systems Engineering (ISE) encompasses the design, analysis and evaluation of the whole manufacturing process. Describe how an engineer can help enhance productivity, speed, quality, cost and sustainability in the manufacturing process. Identify the core, fundamental principles of Lean (eliminating waste) and Sigma (reducing variation in the product). Explain the fundamental difference between PUSH and PULL systems on the assembly line.

Sequential Workflow Pull SystemPush System Create product or service as they are demandedMakes forecasts/assumptions about demand Used on lower volume/specialized productsMedium to high volumes of standard products Requires more communication and coordination to changeover between products Made for stock because demand is assumed to be predictable and stable Reduces inventory and excess production/wasteLarge spikes in inventory and work-in-process

Sequential Workflow (cont’d) Push vs. Pull  Fast Food vs. Sit-Down restaurants

Agenda Overview10 min 1 st Production Run (PUSH)10 min 2 nd Production Run (PULL)10 min Discussion/Improvement Cycle15 min 3 rd Production Run (PULL)10 min Discussion15 min Clean-Up and Item Checkout10 min Total80 min

Production Line Overview A Customer Orders a set of Mr. Potato Heads Customer Receives and Checks Order 3 Variations of Mr. Potato Heads Assembled

Op 1-9FTCustomer  Sequentially,  Process must flow from Operators to Final Tester (FT) to the Customer  Team Roles: 1 Operations Manager 9 Operators 1 Final Tester 2 Customers 1-2 Transporters 2 ISE’s The Process

Q&P Room Setup CA Front of Room Back of Room BrutusGray Buckeye Scarlet B C D CB A E F I H G O4 O5O6 O1 O2O3 O7 O8O9 FT CACB O1 O2O3 O4 O5O6 O7 O8O9 FT ISE ISEISE Trans Trans ISE OpMan CA OpMan CB J K L M O P N R Q O1 O2O3 O4 O5O6 O7 O8O9 FT CACB O1 O2O3 O4 O5O6 O7 O8O9 FT ISE ISE ISE ISE Trans Trans OpMan OpMan

Additional Notes Transporters are the only people who can move parts between tables. Operators cannot leave their assigned workstations. If you do not get an order in on time, still give it to the customer as quickly as you can.

Production Run Order  First run  Push The first order occurs at time 1 minute Teams will receive an order every 1 minute after first. Orders delivered more than 75 seconds after the order is placed will be considered late.  Second Run  Pull Teams will implement the pull order system.  Improvement Cycle Teams will have minutes to improve their system.  Third Run  Pull Teams will implement their revised system.

Production Issues  WIP (Work In Process) Any partially finished product Labor & material have been used, but item is not complete and cannot be sold for profit  Wrong Order A finished and verified product, but incorrect per customer order Costs extra to return and correct customer issue, but product can be sold elsewhere  Defective Product Went through entire assembly process but found to be not within specifications Must be re-worked or scrapped, causing wasted time and money

Important Takeaways  The push and pull systems each yield different results. There are pros and cons to each and best fit different situations.  By eliminating or minimizing different forms of waste, productivity and net profitability can be increased.  ISEs have the ability to design, analyze, and oversee the operation of a system for sustained efficiency.

TopicDocument Type Marble Delivery SystemNone Quality and ProductivityExecutive Summary CircuitsExecutive Summary Solar Meter-- Solar CellMemo (Combined) Beam BendingMemo Wind Turbine (7A)-- Wind Turbine (7B)Report (Combined) Problem Solving Project (8A) Project Notebook (Combined) Problem Solving Project (8B) Problem Solving Project (8C)

Preview of Next Lab  Lab 3- Circuits Lab Understand how voltage, current and resistance are measured Apply Ohm’s Law, Power Law, Kirchhoff’s Current Law and Kirchhoff's Voltage Law Observe polarity of certain electrical components Review the reading, take Carmen quiz, and complete the pre-class assignment!