Solar Powered Village Electrification Based on Mobile Network Infrastructure - experiences from a pilot project in Bangladesh Hanne Cecilie Geirbo Department.

Slides:



Advertisements
Similar presentations
Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
Advertisements

A case study of off-grid solar PV in South Africa Louise Tait and Gisela Prasad LCEDN conference 4 – 5 April 2012.
Prepared For: Copyright © 2013 Decision Analyst American Home Comfort Study  Are these products perceived as an acceptable way to better.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Innovative approach for rural broadband delivery Haiti Rural Broadband Initiative Bruce Baikie Senior Director Broadband Initiatives Inveneo.
Lessons from early pioneers in the mobile-enabled energy sector.
Mini Grids in Asia Sameer Kalra Sept 30 th, 2010.
Bundubox ITU IOT IOT APPLICATION CHALLENGE. Proposal ▫Main idea ▫Local Communication Issues, Involved Solution ▫Bundubox: Local off the grid ip communication.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
28-29 January 2015 NEP Workshop Off Grid Electrification Service
Energy David Blowers 28 May 2015 Is it time to leave the grid: The rise of distributed generation and the consequences for consumers and the electricity.
Rapid deployment of Community Power as a strategy to cheaper BTS power Declan Murphy, Founder Owenroe Lemass, Renewables Engineer Clive Gilmore, Technical.
PRIVATE SECTOR LED OFF-GRID ENERGY ACCESS The A-B-C Business Model and How Third Parties Can Support the Development of Energy Access Solutions Feb 20,
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Tutorial: IEEE CSI Business Development Workshop Green Village Electricity Project; A Suitable Model for Reliable Renewable Deployment in Nigeria Ifeanyi.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
ADDRESSING CHALLENGES FOR GREEN ENERGY AND CARBON MARKET DEVELOPMENT Presented to The High Level Workshop on Public Private Partnerships Implementation.
UNDP & the Business SectorBureau for Resources and Strategic Partnerships Business, sustainable development and the MDGs: A changing landscape.
© GSM Association 2010 GSMA Development Fund Community Power from Mobile November 2010.
REVISED JUDGING CRITERION – AN INTRODUCTION. What is the revised judging criterion? Which Enactus team most effectively used entrepreneurial action to.
Sectoral Analysis : Mobile Application Industry Submitted By : Sagar Deshmukh Birla Institute of Management Technology (BIMTECH )
Distributed Power Opportunities in the Developing World Presentation to the Distributed Wind Energy Association F. Andrew Dowdy February 13, 2013.
1 Provision of sustainable energy. 2 The market of energy as we know it The energy market contains a predefined business suppliers users access and settlement.
Energy Challenges in Kenya “Electrifying Kenya” Annabel Yadoo MPhil MA Centre for Sustainable Development, Cambridge University Cambridge Energy Forum.
 Rapid response telecommunications centers  Civilian calling program  Long-Term Emergency and Emergency Prevention.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
R 255 G 211 B 8 R 255 G 175 B 0 R 127 G 16 B 162 R 163 G 166 B 173 R 104 G 113 B 122 R 234 G 234 B 234 R 175 G 0 B 51 R 0 G 0 B 0 R 255 G 255 B 255 Supporting.
M i c r o E n e r g y I n t e r n a t I o n a l MicroEnergy International INAISE Conference st June 2012.
+ Lifeline for Help: GSM Callbox Approach to Extend Reach Presented by Rose Shuman, Founder, Open Mind – Question Box Seventh International Consultation.
Tutorial: IEEE CSI Business Development Workshop Sirona Haiti Rural Electricity Franchises Commercialization & Manufacturing Paul Lacourciere COO, Sirona.
Business solutions to enable energy access for all Washington, February 21, 2012.
Euroheat & Power 1 Boosting Innovation from Research to Market District Cooling in Europe Potential and Benefits Tomas Bruce President Euroheat.
MOVING TO GREEN TECHONOLOGIES VODAFONE GHANA EXPERIENCE by Mamle Asare Sustainability Manager Vodafone Ghana.
1 Palestinian Integrated Rural Environmental Protection Plan By Hossam Zaqoot June 2005 European Commission LIFE Third Countries Palestinian National Authority.
Global City Teams Challenge September 29-30, 2014 Report Out: Project X.
April, Investor presentation.
Dr Evans Rweikiza Executive Director Tanzania Private Sector Foundation April 2010.
Issues Raised and solutions proposed 1 “A private sector energy company (ESCO) would never make this investment because they would not see a profitable.
How resilience for tomorrow starts today Peter Simpson Managing Director, Anglian Water Chair, Water UK.
ICT FOR AGRICULTURE K.I.L. Agriculture Group. Agricultural Challenges  Lack of planting and harvesting knowledge  Not able to protect from disease 
Sunpower & Consultants Private Limited “Sunpower & Consultants Private Limited” has ventured into solar power systems in It is engaged in consultancy,
11/29/00 – 12/01/00 NSF Workshop on Sustainable Energy Technologies Solar-Electric Power: Road to a Clean, Secure Energy Future James Gee 1 and Roland.
Developing the EEAC Network Into a Sustainable Energy Network August 2004.
Nakaseke CMC 1 Presented by: Balaba Peter Nakaseke Community Multimedia Centre and Library.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
Proposition forRemote Technical Support Presented by SYNOVUMS LLP.
Nizam Energy.  Established in 2012, as a subsidiary of a 150 Year old family business with interest in textile and hospitality.  Business is involved.
Support for the SDDX Program: Training for Renewable Energy Service Companies Beijing JKD Renewable Energy Development Center 8 th June, 2005.
Monkey Point Case Study June 2009.
1.2 Billion People Live without Electricity in This Planet
Off-grid Electrification Department of Rural Development
1 KNOWLEDGE SHARING ON SOME COMMUNITY BASED RENEWABLE ENERGY PROJECTS IN THAILAND CHARTDANAI.
16th Renewable Energy Summit
Rwanda: Energy Access Diagnostic Results Based on Multi-Tier Framework
Community Power from Mobile (CPM) - Using Mobile to Extend the Grid
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Transformer Oil Market trends research and projections for 2018 – 2024.
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
Mobile Solar Electricity by Albert Franklin Rodriguez, MSc
DRIVERS FOR BUILDING NEW SYSTEMS: Speed and Versatility
EV charging – a grid perspective
ENCLAVE POWER COMPANY LIMITED
10 September 2018, Chiang Mai, Thailand
Mobile Solar Electricity by Albert Franklin Rodriguez, MSc
Developing Reliable and Cost-Effective Grids
NYS Department of Public Service
Stand alone vs. interconnected
ACCESS TO SUSTAINABLE ENERGY PROJECT
Isaac Sokopo Group Electrification Planning Manager
PNG Power SAFE, RELIABLE & FINANCIALLY VIABLE
Presentation transcript:

Solar Powered Village Electrification Based on Mobile Network Infrastructure - experiences from a pilot project in Bangladesh Hanne Cecilie Geirbo Department of informatics University of Oslo

Three points 1.Mobile network infrastructure can be leveraged for electricity provision. 2.Sustainability can only be achieved through a repair-centric design. 3.Infrastructures are cultivated, not implemented, and need to be planned accordingly.

The Community Power project Pilot project in Bangladesh University of Oslo and the mobile operator Grameenphone PV mini grid, 3.15 kW p, 1 km radius Mobile tower as hub Night: 136 households + 2 temples, 1 7W CFL bulb each – 150 BDT (1.8 USD) monthly fee (postpaid) Day: 1 Grameenphone Community Information Center – Computer with internet, mobile charging booth Operated by local businessman – 20% commission, free electricity for CIC Village: Paharpur, Habiganj district – Population: – Remote. lacking basic infrastructure

Leveraging mobile network infrastructure for rural electrification Mobile industry: network infrastructure in remote and inaccessible areas An increasing number is powered by solar energy. Mobile towers can be used as a mini power plants – Mini-grid – Energy hub Anchor customers for Energy Service Companies – Power Purchase Agreements Stepping stone for national grid expansion Reaching communities in challenging landscapes Corporate vs. public electricity infrastructure – Segmentation models

The Community Power project from start to end Dec – Oct Window of opportunity Planning Oct – May 2011 Novelty, favorable weather Honey moon June 2011 – Jan Monsoon. Outages, tampering. Friction Jan – Jan Planning adjustments, failing to execute the plans Adjustment Jan – Jan From domestic lights to school computers Restructuring

First monsoon: trouble started Less sun make system vulnerable to over- consumption Tampering and outages – People expected to get domestic mobile chargers – Took it upon themselves – Resulting in recurring outages

Repair routines failed Takes at least one day to travel to the village Erosion and clogged waterways add to travel time Frequent road blocks due to political unrest Swift repair crucial for trust and stability – Rebuilding trust takes time and effort Travel challenges made our planned adjustments very resource demanding

Movable houses, sinking poles Concrete poles sinking in the soft soil – Wires as clothes lines Houses made of bamboo and corrugated iron – Vulnerable to storm – But easy to move a wall – Not so easy anymore when the house is connected to the neighbor’s with a wire Customers moving from the village or graduating to Solar Home Systems – Problematic to disconnect individual houses without afflicting the neighbors

A repair-centric design Break-down will occur Consider repair and maintenance before choosing technical solution – How is other technology repaired in this setting? – What are the logistical challenges? – What are the local competences? Connections does not necessarily persist How to disconnect is as important as how to connect

Resource allocation not mirroring piloting process A myriad of nitty-gritty practical issues emerging gradually Most human resources allocated for planning and implementation The large work burden after implementation not anticipated

Infrastructures are cultivated, not implemented This needs to be reflected in resource allocation – Decision makers cannot engage with the nitty gritty – Rely on abstract representations of work to allocate resources – Appropriate resource allocation depends on representations that highlight cultivation rather than implementation “Implementation thinking” a reason why companies get cold feet?

Three points 1.Mobile network infrastructure can be leveraged for electricity provision. 2.Sustainability can only be achieved through a repair-centric design. 3.Infrastructures are cultivated, not implemented, and need to be planned accordingly.

Want to know more?

What’s in it for telecom? Competing for rural market shares No charging – no use – no revenue Additional products and services – Mobile banking – Telecenters Corporate Social Responsibility, brand building