Department of Infrastructure Castletown Tidal Flooding & Sea Defence August 2014.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Alex Nickson, policy and programmes manager, climate change adaptation and water Community Flood Planning in London.
. Shoebury Common Flood Risk Management Scheme What is this exhibition for? This exhibition explains the various options considered for improving protection.
Galveston Hurricane of 1900 September 8, Importance of Galveston Galveston was an important port city before the hurricane. Galveston was an important.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
City of Rye Community Reconstruction Program Committee Meeting #4 Tuesday, August 12, :00 PM, Rye YMCA.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
6TH ANNUAL CONFERENCE. The Use of Temporary Steel Barriers in Construction Zones By Don Pyde Product Manager Trinity Highway Products.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Presentation to Maxwell Place Homeowners Association 1.
Combatting Storm Surge Flooding in Lower Manhattan and its Effects on the NYC Subway Kayde Cox, Emily Jennings, Daniel Schwartz, and Sylvia Zaki, Queens.
Climate Change and Water Resources Presentation to the West Palm Beach Green Task Force May 6, 2010 Nancy J. Gassman, Ph.D.
Integrating Climate Change into the Emergency Management Context Nancy J. Gassman, Ph.D. Sustainability Manager City of Fort Lauderdale Governor’s Hurricane.
SESSION: RESILIENT INFRASTRUCTURE Stronger and More Resilient Infrastructure to Accommodate the Effects of Sea Level Rise Michael V. Tumulty, P.E., Vice.
Priory Sea Level Rise Lesson Two. Did you find the website? On your tables discuss what you found, if you accessed the website, about the effect of sea.
Sanitary Engineering Lecture 16
Flooding in Boscastle 16th August Map of Boscastle. Aerial Photo. MUST: Annotate images and diagrams to show the causes and effects of the Boscastle.
Flooding in Boscastle 16th August Map of Boscastle. Aerial Photo.
Living in the Floodplain Kate Barrier. Where were you in April 1975?
CPRA Board Meeting, Lake Charles LA January 22, 2013 Coastal Protection and Restoration Authority.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
The Invisible Flood Control Wall ™ Flood Control America presents.
Flooding John Backley,OCC and The Environment Agency.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Strategic Planning for Coastal Flooding and Erosion Nick Hardiman Senior Coastal Adviser Environment Agency Strategic Overview.
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
FLOODCOM EDUCATION WORKSHOP Water Cycle Defences Flood Detective.
Crisis in Shrewsbury Flooding impacts and risk management.
Local Response to Climate Change: Swinomish Case Study Swinomish Indian Tribal Community.
Hurricanes. Katrina approaching New Orleans August 2005.
Climate Change Risk Assessment Tool. Weather & Climate.
Coastal Management: defense against flooding and erosion Hard Engineering and Soft Engineering Measures.
Miami. Miami: Climate Miami’s client is similar to Houston in several ways. It has one of the highest levels of rainfall of any major U.S. city. It receives.
Los Angeles District Los Angeles District 86 th CERB 3-4 June 2009 Los Angeles District Activities and Data Utilization Arthur T. Shak, SPL Navigation.
Severn Estuary Forum Flood Risk and the Severn Barrage 19 th September 2009 Nick Lyness Wessex Flood &Coast Erosion Risk Manager.
San Francisco Bay Conservation and Development Commission The Adapting to Rising Tides Project.
Presented to the Board of County Commissioners August 19, 2008 Tropical Storm Fay Update.
Explorers Education Programme: Flooding & Coastal Communities.
The Sigmaplan – Flanders Updating the Flemish Sigmaplan : Large scale flexible and sustainable river management Waterwegen & Zeekanaal (W&Z) nv Waterways.
Assessing the Risk and Vulnerability of NH Coastal Communities to Sea Level Rise and Storm Surge FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE’S FUTURE.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
Coastal Flood Management Global Innovations Tuesday, 13 December 2005.
Thames Barrier How does it protect London?. Learning Outcomes By the end of the lesson you will be able to: Explain how the Thames Barrier protects London.
Boscastle. Causes Heavy localised rainfall – 89 mm of rainfall in a period of an hour. The ground was saturated by previous rainfall. The village of Boscastle.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
Innovation quality reliability Vikoma Vikoflex Boom System December 2015.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
What would you do? You are a planning officer responsible for choosing the best coastal defences to use for a number of different places. You need to look.
Making decisions about the Holderness coast
Boscastle - the most frightening flood of the decade?
2013/14 Coastal Storms and Emergency Response in Dorset
Marium, Alex, Billy, Ollie
Flooding in Boscastle 16th August 2004.
Preserving Our Coastline and Ourselves with Architectural Advances
Responses Drivers Residential properties Damage to buildings
Lesson Four: Flood Response Methods
Managing the Coastline
SPR – Middelkerke pilot area
SEA DEFENSES : hard engineering
Weekly lesson objectives
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

Department of Infrastructure Castletown Tidal Flooding & Sea Defence August 2014

2002 Tide model created Storm Surge Model Flood Maps 2002 prediction accuracy mm Meters 2014 prediction accuracy mm 2

January 2014 Flooding areas –Hope Street –Back Hope Street –Springfield Terrace –Victoria Road –Milner Terrace –Athol street –Brewery Walf Tidal Overtopping –Douglas Street –The Promenade J Robinson3

January 2014 Structural Damage Damage to sea wall at St Mary’s Car Park Damage to breakwater 4

Lessons Learnt/Improvements Shortage of sandbags Poor communication –Government –Businesses, Residents and LA’s Understanding of the flooding routes Drains, Lanes, Roads Area Protection works 5J Robinson

February 2014 Improved flood protection at end of Hope Street. Gullies and manholes covered to prevent backing up. Early deployment of sandbags and increased availability Improved communication with businesses, residents and local authorities Pre-planned road closures, advertised in advance J Robinson6

St Mary’s Car Park Castletown Commissioners reconstructed the sea wall and car park –250T of temporary rock armour to protect the area –Construction of new retaining wall –Improved land drainage –Increased car parking –Viewing area being created 7

Tactical Improvements Since January 20,000 filled sandbags Flood barriers Portable flood barriers Maintenance of non-return valves to harbour Pre-planned road closures 8

Portable Flood Barriers Demountable flood defence barrier Rapidly deployed Flexible, easy connection to walls Pods fill with rising flood waters 900 mm high units No bolting or construction work needed J Robinson9

Fixed Flood Barriers Permanently fixed wall channels Lightweight aluminium panels Durable rubber seals Units locked in place with compression screws J Robinson10

Policy and Strategy Development A high level cost benefit analysis complete Investigation of defence options and budget costs commissioned J Robinson11

Up Coming Tides Tide height –10-15 August 14 –13 th - Chart 4.15 m –8-12 September 14 –11 th Chart 4.21 m Castletown Harbour typically lower than above This only starts to be predictable 36 hours out 12

13