Ideas for LC mechanics (we will work on sensors as well – particular CMOS)

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
Mechanical precision and stability Georg Viehhauser University of Oxford With material taken from S. Marti, A. Morley, C. Kleinwort, C. Gargiulo and probably.
Electrical tapes for the ATLAS phase II barrel strip tracker upgrade
Mechanical Work Plan Discussion Bill Cooper Fermilab.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Electrical tapes for the ATLAS phase II barrel strip tracker upgrade Roy Wastie, Tony Weidberg Oxford University.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tilt angles reloaded, and status of some other things.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Stave production.
Considerations on integration, mechanics and cooling R. Santoro, D. Perini ITS Upgrade plenary meeting, 29-May 2011.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
New R&D Directions Carl Haber ATLAS Tracker Upgrade Mechanical Meeting 11-Sept-2013.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
OUTLINE: 1.Current Design 2.Hybrids, Staves 3.Radiation Length 4.Cooling, etc.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Perspectives for ILC Si-Tracker mechanics work at Oxford aka It’s looking grim unless … PS: This is an individuals view 19/06/2014 2nd Oxford Strategy.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Technology and R&D Summary and next steps Burkhard Schmidt.
Solid Mechanics Course No. ME213. Thin Cylinders (Examples) ME213 Solid Mechanics2 Example 1.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
October 2014Silicon Pixel Tracker – Chris Damerell 1 Tracking sensor, one of 12,000, 8x8 cm 2, 2.56 Mpixels each Matching endcaps (only one layer shown)
Detector building Notes of our discussion
Next steps toward the beam test
Hybrid Pixel R&D and Interconnect Technologies
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
Antti Onnela CERN – EP – Detector Technologies group
WG4 – Progress report R. Santoro and A. Tauro.
Presentation transcript:

Ideas for LC mechanics (we will work on sensors as well – particular CMOS)

2 Current Oxford activities on composite structures Oxford is contributing to the R&D for the ATLAS strip tracker upgrade We are involved in the development of the local supports: barrel strip staves –UHM CF/honeycomb structures with carbon foam (Allcomp) cooling channels with embedded thin-wall Ti tubes –Kapton/Cu flex circuits co- cured with CF skins And the design of the global CF support structure for the barrel strip system Cu/Kapton tape co-cured with K13C2U

3 Our vision for future large trackers Future sensor technologies (thinned down MAPS) promise material down to a few ‰ of a radiation length –Structures and services need to match this We do have a strong preference for liquid (evaporative) cooling –Gas cooling is not a robust technology (difficult to predict) –Gas cooling has limited capacity (might be ok for linear collider, but not much more) –For comparison: ATLAS phase II >2.5% X 0, LC TDR ~1% X 0 –Support/service sandwich layer: Structural: UHM fibre (e.g. K13C2U, 4 layers of 45gsm) Cooling: Microchannel Kapton cooling Electrical services: Al/Kapton multilayer cables All the above are co-cured (this saves glue) –Sensors: Thinned down to 50µm (MAPS) –This would be a layer less than 1mm thick 3 Of course, we have ignored a few things, but we think 0.5% is a conceivable aspiration… Kapton microchannels UHM CF 0° 90° 0° 90° UHM CF Al/Kapton tape Sensor → Challenge: Is 0.5% X 0 /tracking layer with evaporative cooling possible for a large ((2-3m) 3 ) tracker?

4 Kapton microchannel cooling Developed for ALICE by CERN: Tested to 10bar a with water and C 6 F 14 monophase cooling Requires scaling to large tracker size, can we achieve higher pressures At Oxford we have started to look into similar photo-etched and machined structures… 4 G. Fiorenza et al., 5th IEEE International Workshop on Advances in Sensors and Interfaces (IWASI), 2013, p , /IWASI

First attempts Prototypes of 40×100mm 2 Machined (milled with a tool at 45°) Photo-etched as ALICE –One prototype has achieved 10bar a (two channels delaminated at 5bar a, but ultimate failure at 10bar a ) Next step is to co-cure a sample with CF 5

6 How can we achieve stiffness? The key is design for large moment of inertia (together with high modulus) –Ladders are poor –Large cylinders are better But: hoop stiffness is now the challenge Also: integration of large cylinders has many disadvantages –Large, valuable objects – difficult to move/transport –Technologies get challenged late in the integration Can one make smaller units which are clever structurally? –Yes, exploit the mouldability of CF (and Kapton-based service elements)! –Examples exist for vertex/pixel systems, need to scale by 10 in size And, with 50μm sensors, the structures do not need to be flat… 6 BNL, doi: /j.nima STAR, doi: /j.nima ALICE, doi: /j.nima

How could this look like? 7 This geometry is for ATLAS upgrade dimensions, but you get the picture Inner: 3:2 Outer: 4:3