Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ion Accelerator Complex for MEIC January 28, 2010.
O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Status of Construction and Commissioning of the GSI HITRAP Decelerator Outline:
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
ESS DTL beam commissioning
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Beam diagnostics in the beamlines
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
HIE-ISOLDE Project Status Report
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
The HIE-ISOLDE Faraday Cup
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ESS Front End diagnostic
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
Halo Collimation of Protons and Heavy Ions in SIS-100.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
NICA injection complex status
LCLS_II High Rep Rate Operation and Femtosecond Timing
Experience with beam instrumentation at Linac4
Status of HESR 18th March Gießen Dieter Prasuhn.
Feng Zhou LCLS-II AP meeting 02/23/2017
A. Martynov on behalf of accelerator division.
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Performance of BI systems at HIE-ISOLDE
Installations up to Start of Commissioning
Progress in the Multi-Ion Injector Linac Design
RF operation of REX-ISOLDE
DC Injector and Space Charge Simulation Status
How to run ions in the future?
Beam instrumentation for HIE-ISOLDE
LINAC4 commissioning plans etc.
Pulsed Ion Linac for EIC
SNS Commissioning Mike Plum
(Beam) Commissioning Plan
Ideas for REX/HIE-ISOLDE Upgrade
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
HE-JLEIC: Do We Have a Baseline?
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)

Content:  Status of REX RF Systems  Commissioning with beam Completed so far Next steps  Summary Jose Alberto Rodriguez, BE-OP-PSB (x167538) 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21

RF Systems: Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u Beam to HIE-ISOLDE 2.85 MeV/u Magnets: Triplets6 Doublets1 Steerers1H, 1V Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV Steerer Power converters: 200 A, 50 V20 (1 spare) bipolar 3.5 A2 Diagnostics: REXHIE-ISOLDE FC MCP Collimator apertures Beam attenuators FC Si detector Scanning Slits Collimator apertures Diagnostics Status of REX Sectors10 Turbopumps~20 Cryopumps3 Gauges~25 Vacuum (incl. low energy): 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 RF Structure Final Energy [MeV/u] 4-rod RFQ0.3 Buncher0.3 IHS1.2 7gap gap gap gap2.85

RF Systems: Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u Beam to HIE-ISOLDE 2.85 MeV/u Magnets: Triplets6 Doublets1 Steerers1H, 1V Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV Steerer Power converters: 200 A, 50 V20 (1 spare) bipolar 3.5 A2 Diagnostics: REXHIE-ISOLDE FC MCP Collimator apertures Beam attenuators FC Si detector Scanning Slits Collimator apertures Diagnostics Status of REX Hardware refurbishment and commissioning for these systems completed and ready for beam commissioning since wk. 25 (HIE-ISOLDE diagnostics box since wk. 27). Sectors10 Turbopumps~20 Cryopumps3 Gauges~25 Vacuum (incl. low energy): 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 RF Structure Final Energy [MeV/u] 4-rod RFQ0.3 Buncher0.3 IHS1.2 7gap gap gap gap2.85

RF Systems: Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u RF Structure Final Energy [MeV/u] 4-rod RFQ0.3 Buncher0.3 IHS1.2 7gap gap gap gap2.85 Beam to HIE-ISOLDE 2.85 MeV/u Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV SteererDiagnostics Status of REX 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 4-rod RFQ: Functional since wk. 25 (10 Hz, 1ms, power levels up to A/Q = 4.0) Ready for commissioning with beam and physics program  New steeper motor for one of the tuners will be installed this week  Broken cooling fan will be repaired during the winter shutdown  Duty cycle and peak power requirements will be significantly higher next year (this applies to all the RF systems) Buncher: Functional since wk. 25 Ready for commissioning with beam and physics program  Phase shifter in the LLRF replaced on wk. 32 IHS structure: Powered on wk. 29, ramped up in wk. 30, functional since wk. 35 Ready for commissioning with beam and physics program  Problem with LLRF’s control PLC solved on wk. 31  Amplifier disassembled, RF tube replaced on wk. 34

RF Systems: Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam from EBIS 5 keV/u RF Structure Final Energy [MeV/u] 4-rod RFQ0.3 Buncher0.3 IHS1.2 7gap gap gap gap2.85 Beam to HIE-ISOLDE 2.85 MeV/u Triplet IHSRFQ Buncher 7gap 17gap 27gap 39gap Triplet Doublet HV SteererDiagnostics Status of REX 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 7 gap structures: Functional since wk. 32 Ready for commissioning with beam and physics program  Problem with tuner of 7gap3 solved on wk. 32  Problem with reachable range of phases of 7gap1 solved on wk. 36  Possible problem stability of 7gap1 observed (gone, but may reappear) 9 gap structure: Temporary amplifier functional since wk. 25 Ready for commissioning with beam  Final amplifier delayed. Will not available this year (implications in the maximum A/Q (<3.6) and the time structure) Peak power and duty cycle increased on wk. 36 (52 kW, 0.2%: 10 Hz, 200 us)  New RF line will be install on wk. 39 to minimize RF losses  Problem with remote phase acquisition solved on wk. 36

Commissioning with beam Stage 1: REX diagnostics box: Commissioning with beam started on wk. 25 (June 16 th ) Beam with an A/Q=4.0 was accelerated to 0.3 MeV/u (RFQ output energy) We reached the first diagnostic box and re-commissioned the FC, MCP and collimator wheel on wk. 25 Beam transmission through RFQ for different power levels on wk. 26 Beam in FC after RFQ for different collimator aperture sizes (15, 5, 3 and 1 mm) MCP image of the beam after the RFQ Diagnostic box: FC, MCP, Collimator Wheel, Beam attenuators Jose Alberto Rodriguez, BE-OP-PSB (x167538) wk. 25 // 0.3 MeV/u IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Beam transmission thru the RFQ vs RF power for A/Q=4.0 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 Already reported in previous meeting

Stage 2: First HIE-ISOLDE diagnostics box: First diagnostics box of HIE-ISOLDE installed at the end of wk. 27 First beam in FC and to the Si detector with 0.3 MeV/u energy on wk. 28 Systematic characterization by E. D. Cantero and S. Sadovich on wk. 33 and after More details in the next presentation by S. Sadovich Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) wk. 28 // 0.3 MeV/u IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Screen shot of BI expert application Beam in Faraday Cup 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 Beam signal in Si detector after pre- amplifier in “oscilloscope” mode Diagnostic box: FC, Si detector, Scanning slit, Collimator slit Quad scan using scanning slits (I = 15 pA)

Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) IHSRFQ Buncher 7gap 17gap 27gap 39gap Diagnostics Stage 3: Commissioning and phasing of RF Structures in REX: Cavities and their amplifiers were commissioned after they were turned on by the RF team Many of the problems listed in previous slides were discovered at this time Finally, operational settings (phases and amplitudes) for all RF cavities were determined 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 Energy spectrum around zero- crossing phase of the buncher Phasing of the first 7gap structure Energy of the beam for different phases and amplitudes out of the 9gap wk – 2.85 MeV/u

Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) CM1 XLN Stage 4: Commissioning the High Energy Beam Transfer (HEBT) line: First attempt to drift beam passed the cryomodule on wk. 33 Second attempt on wk. 38 (rupture disk incident and work related to the SRF tuners) Beam all the way to the last diagnostics box of XT01 at the end of wk th HIE-ISOLDE Physics Coordination Group Meeting /09/21 CM2 (2016) wk MeV/u XLN3.0300XLN4.0300XT XT XT XT XT XT FC name Measurement (1) BI expert app. I [epA] (2) calibration for XT Transmission XRFQ.FC pA10.6 pA (used external Keithley)1.00 XIHS.FC109.3 pAReading affected by buncher XLN (1) 9.3 pA (2) 0.88 XLN (1) e - suppressor problem XLN (1) 9.5 pA (2) 0.90 XT (1) 9.3 pA (2) 0.88 XT (1) 8.9 pA (2) 0.84 XT (1) 8.9 pA (2) 0.84 XT (1) e - suppressor problem XT (1) 8.1 pA (2) 0.76 XT (1) 8.1 pA (used external Keithley)0.76 End Tunnel SC Solenoid Quad H/V Steerers Overall transmission ~75% Transmission through REX ~88% No mayor problems found (two electron suppressors don’t work) Optics model seem to work pretty well, but systematic measurements of beam properties still need to be done

Commissioning with beam Jose Alberto Rodriguez, BE-OP-PSB (x167538) CM1 Next steps (high priority):  Deliver beam from the pilot source before the trap to the end of XT01  Finalize the commissioning of the new TRAP/EBIS/RF timing system and the high level control application  Phase SC cavities and measure the energy gain of the beam (benchmark their performance)  Test machine scalability in A/Q and in energy 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21 CM2 (2016) wk MeV/u Next steps (lower priority):  Systematic measurements of beam properties (e.g. emittance, Courant-Snyder parameters…)  Benchmarking optics model and implement modifications if necessary  Finalize and commission the field regulation of the power converters for the dipole magnets Next steps (medium priority):  Improve beam transmission  Individual calibration of each Faraday cup  Cross calibration of the two Si detectors and the dipole magnets and determine error bars in beam energy measurements  Check calibrations / phases after installation of new RF line for 9gap and steeper motor for tuner of RFQ  Systematic commissioning of all the devices in the beam diagnostics boxes  Systematic checks with beam of polarities of all optics magnetic elements  Finalize and commission the beam diagnostics high level control application

Summary Jose Alberto Rodriguez, BE-OP-PSB (x167538) Status of REX:  Hardware refurbishment and commissioning of power converters, magnets, diagnostics and vacuum systems completed before wk. 25  All RF systems operational at the same time since wk. 35 (some of them since wk. 25)  Due to delay in delivery of the final 9gap amplifier, we will need to use the temporary amplifier (constrains in maximum A/Q and time structure deliver to users) Commissioning with Beam:  Commissioning started in wk. 25 and progressed as hardware was ready  12 C 4+ beam produced in the charge breeder has been accelerated to 2.85 MeV/u (REX nominal final energy) and transported to the end of the XT01 experimental line  A lot of work still needs to be completed before the start of the physics program 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21

Additional Slides Jose Alberto Rodriguez, BE-OP-PSB (x167538) 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21

Constrains imposed by the temporary amplifier Jose Alberto Rodriguez, BE-OP-PSB (x167538) Limits on peak power translate into Limits on the repetition rate translate into Limits on the maximum A/Q of the beam Possible beam contamination Limits on the maximum A of the beam Stripper foils for light ions Longer breeding time Lower breeding efficiency Lower beam current Non-usable or lower quality experimental data for heavy ions Force to operate in non-optimal of the CSD Constrains on the time structure delivered to users Limits on duty cycle translate into Unable to stretch beam pulse Lower beam current Increase operational complexity (set-up time, risk, reduces beam quality…) Limits on half- life of the beam Fortunately, only a few of these affect the experiments planned for 2015 Having the amplifier for the 2016 experimental campaign is an absolute must! Increased pile-up Lower effective beam current Fewer and longer experiments (ie. reduced physics output) 8 th HIE-ISOLDE Physics Coordination Group Meeting /09/21