Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
Work Breakdown Structures
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 ARCH 435 PROJECT MANAGEMENT Lecture 3: Project Time Planning (Arrow Diagramming Technique) Activity on Arrow (AOA)
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Scheduling Computations for Precedence Networks. Prof. Awad Hanna Tabular Format (Precedence Diagram)  Can be carried out on the tabular form without.
Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Network Scheduling : Precedence Diagram Method
Project Planning Preview Characteristics of a Project RFP (Request For Proposal) Project Planning Tools Gannt (Bar) Charts Assoc.Prof.Dr.B.G.Çetiner Network.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Network Problem CPM & PERT
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
1. Production Activities Those that can be taken directly from plans and specifications 2. Procurement Activities procurement of material and equipment.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Project Scheduling IENG 321 IENG 321.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
 Chapter 6: Activity Planning – Part 3 NET481: Project Management Afnan Albahli.
 Chapter 6: Activity Planning – Part 2 NET481: Project Management Afnan Albahli.
Prof. Awad Hanna ij Activity Event (a) Basic Activity Basic Logic Patterns for Arrow Diagrams.
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.

PROJECT MANAGEMENT.
UNIT II Scheduling Procedures & Techniques FLOAT
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT and CPM.
Time Planning and Control Activity on Node Network (AON)
Project Planning and Scheduling
Project Scheduling Chapter 14.
Time Planning and Control Activity on Node Network (AON)
Project Planning and Budgeting
Developing a Project Plan
Scheduling Computation for Arrow Diagram
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Weather and Contingency Allowance
Tabular Format (Precedence Diagram)
ENM448-Project Planning and Management
ENGINEERING MANAGEMENT (GE 404)
THE HIERARCHY OF SCHEDULES
Time Planning and Control Activity on Node Network (AON)
Activity Networks
LECTURE 2.
Activity Networks
Chapter 6 Activity Planning.
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Chapter 6 Activity Planning.
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Presentation transcript:

Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice in construction industry to use calendar day. –Use one and only one time unit for any schedule Estimating Activity Duration 1.From Company’s Record 2.From Standard Estimating Guide 3.Interviewing Field Personnel

Weather and Contingency Allowance Two approaches for assignment of weather allowance: 1.Add the Weather Allowance at the end of the project as a separate activity 2.Add Weather Allowance to those affected by the weather. –Can add weather allowance at the end of each construction segment (site preparation, foundation …etc. –Other contingency items  Procurement Allowance  Strikes Time Zone –The close of the work period immediately preceding the start of the project.

Precedence Diagram Advantages of Using Precedence Diagram 1.No dummy activity are required. 2.A single number can be assigned to identify each activity. 3.Analytical solution is simpler. Numbering System Same concepts used in Arrow diagram –Even or odd or in fives or tens –Smaller numbers to the left –Each Activity has its unique number.

Redundant Linkages 20 A 30 B 40 C 20 A 30 B 40 C (a) Incorrect Representation (b) Correct Representation

Closing the network to give single beginning and ending nodes A A (a) Incorrect Representation (b) Correct Representation F B E C E B FC Finish Dummy Start Dummy

Retaining Wall Precedence Diagram Wall 1 Wall 2 Footing 1 Footing 2 10 Footing 1 30 Wall 1 40 Wall 2 20 Footing 2

Precedence Diagram - Sequence Stepped and Numbered 10 A 25 E 15 B 20 C 30 F 5 Start 35 Finish 1234

Advantage of Using Precedence Diagram 1.No dummy activities are required. 2.A single number can be assigned for identify each activity. 3.Analytical solution is simpler.

Constructing the Diagram 1.Constructing the Diagram –Activities with no dependencies arranged at the left –Create a dummy start called “Contract Award” –Ball-of-string provides a mean to determine sequence steps for each activity. 2.Arrange Activities in a Sequential Order –Start by activity “Contract Award” –Possible sequence step are these activities located at the arrow head.

Create Activity List List all the possible activities beginning with an active verb. (strip, repair...) Consider all procurement activities –Obtain vinyl floor covering –Obtain cabinet –Painter availability. “Labor Procurement” Consider the relationship among the activities What does each activity depend upon? The planner must ask the field personnel how they plan for the job, and why things should be done the way proposed.

Constructing the Precedence Diagram 1.Create Activity list and eliminate redundancies. 2.Construct Rough Diagram “Ball of string” –Activities with no dependency arranged at the left –Create dummy start if you have more than one start “Contract Award” –Ball-of-string provides a mean to determine sequence steps for each activity. 3.Arrange Activities in a sequential order –Start by first activity “Contract Award” –Possible sequence steps are those activities located at the arrowhead

Additional Rules/Practices 1.Event numbering is usually entered after completing the diagram. 2.Common practice to assign i, j in such a way that the number at the tail is small than that at the head. 3.Choose some numbering pattern such as –Even number –Odd number –Numbers in fives or tens

Tabular Format (Precedence Diagram) Can be carried out on the tabular form without preference to the diagram. Advantage: The time required to construct the diagram is eliminated. Determination of early start and finish date Start by time zero and add duration to get EF for A, B, C, D For E choose the maximum EFD of 8 or C

Determining Lag LAG 5-10 = ESD 10 - EFD 5 = = 0 LAG = ESD 25 - EFD 15 = = 5 LAG = ESD 25 - EFD 20 = = 6

Determining The Free-Float Free Float is the minimum of the lag of the link that follow an activity. Look at the “Pre. Column” to find the same number value of EF for terminal activity “not following act.” FF 35 = LFD 35 - EFD 35 = = 0

Determining the Total Float “Backward” Take TF of the terminal activity = 0 or FF 35 = LFD 35 - EFD 35 = = 0 TF I = Min (LAG IJ + TF J ) TF 30 = Min (LAG TF 35 ) = Min (7 + 0) = 7 No other link TF 20 = Min LAG TF 25 = Min = 6 LAG TF {}{}

INDF If the free float is zero - no INDF INDF J = FF J - Max  I (TF I - LAG IJ ) INDF 20 = FF 20 - Max (TF 5 - LAG 5-20 ) = 1 - (0 - 0) = 1 INDF 30 = FF 30 - Max TF 15 - LAG TF 20 - LAG = = {} {}