Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.

Slides:



Advertisements
Similar presentations
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
EU Developments Transmission Workgroup 6th October 2011.
Pilot Project – Energy Trade Data Reporting Scheme Background information Waler Boltz, Chairman CEER Gas Working Group 19th Madrid Forum March 2011.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
Erik Sleutjes (Ofgem) GRI NW Government Meeting The Hague, 6 May 2010 Pilot framework guideline on gas balancing – ERGEG initial steps.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
23 September 2004GTE Annual Conference1 Review of the Madrid Forum VIII July 2004 Geert E.H. Joosten GTE President GTE Annual Conference September.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
European Developments Transmission Workgroup 3 rd May 2012.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Congestion Management
10 year investment plan ERGEG approach and contribution
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
GRI-S : Infrastructures The Union list of projects of common interest
Background and Process
NWE Day-Ahead Price Coupling
ERGEG GRI South South East – , Maribor
EU Postal Regulation CERP Plenary 2018
GTE Transparency Platform
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
Presentation transcript:

Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts

219th Madrid Forum, March 2011 Agenda Background Enquiry of the TSOs Set-up Results Response of the Commission Way forward

319th Madrid Forum, March 2011 Background Gas transit is crucial Depleting indigenous sources calls for additional and diversified imports; Fragmented and monopolistic markets need to be interconnected; Bidirectional flows increase security of supply. 18th Madrid Forum invited ERGEG to provide an overview per Member State of the transit contracts which are still in force; a proposal as to how these contracts will be brought in line with the provisions.

419th Madrid Forum, March 2011 Enquiry – Set-up Letter sent to 32 ENTSOG members As not to exclude any type of contract Intentionally open definition Two general questions Two reminders, one with copy to NRA Response of 29 TSOs

519th Madrid Forum, March 2011 Enquiry – Results / Legal Analysis Directive 2003/55/EC allowed a limited number of contracts to persist under the terms of Directive 91/296 As from 1 July 2006 (Regulation 1775/2005) access based on non-discriminatory, transparent and cost reflective tariffs is fully applicable to the so-called (historical) transit contracts Regulation 715/2009 From 3 March 2011 tariffs shall be set separately for every entry and exit point; By 3 September 2011, network charges shall not be calculated on the basis of contract paths.

619th Madrid Forum, March 2011 Enquiry – Results / TSO responses Collected data is not complete and potentially ambiguous Only few TSOs acknowledge holding transit contracts Even less assume possible conflicts with European law No legal obligation to provide this information to ERGEG Not all NRAs have access to this kind of data

719th Madrid Forum, March 2011 Enquiry – Results / Suggestions Commission takes every opportunity to Address this issue; Pursue existing or open new infringement procedures; Cooperate with NRAs both in preliminary and litigation procedures. Commission further analyses this issue under the auspices of ACER.

819th Madrid Forum, March 2011 Response of the Commission Shared view that elimination of transit contracts not compliant with EU law is needed for achieving internal market; Follow-up needed on this issue; Additional assessment by ERGEG is necessary pinpointing for which countries/TSOs it continues to have doubts.

919th Madrid Forum, March 2011 Way forward Assistance of respective NRAs is needed for sound evidence Double scope Does the same regulated tariff / methodology apply for all transmission activities without exception for border-to-border transmission? Does the same capacity allocation methodology apply at cross- border interconnection points irrespective of the origin or destination of the gas? Is this organised in a fully decoupled entry- exit model?

1019th Madrid Forum, March 2011 Thank you for your attention!