TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel.

Slides:



Advertisements
Similar presentations
TRUSSES. ROD TRUSSES U - BOLT TRUSS WHAT IS WRONG WITH THIS PICTURE ?
Advertisements

Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
Types and Uses of Fasteners
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Manual Flo-tap Installation Instructions
RockOn! Canister Integration RockOn! 2009.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
F ASTENERS … THE SEMI - PERMANENT SOLUTION The purpose of this quiz is to see what you know, and what you have learned about using fasteners. You will.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Common Problems Freeboard Anchors and U-bars Sag System hardware.
Specification section 3.3
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
EBOT Workshop #1 Zan Hecht October 14 th, 2004 Basic Mechanical Design.
Tension Members Last Time
Luca Dassa – 01/05/ / 5 CRAB cavities meeting Bolts Titanium Grade 6 bolts Jeveka has found a supplier They say the cost is very high but on offer.
General idea of a couple of check rod system and adjustments
Vbine Energy Generator Assembly Pictures and Info Slide Show.
© 2012 Delmar, Cengage Learning Suspension System Service Chapter 64.
HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
LRFD- Steel Design Dr. Ali I. Tayeh second Semester Dr. Ali I. Tayeh second Semester.
LRFD-Steel Design Dr. Ali Tayeh Second Semester
Overview of TFTR D&D Hazards Jerry Levine Head, Environment, Safety & Health.
The 2 reinforcement plates are made from a piece of 2” dia stainless tube. Read on for how this is done. 14.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
1 Lower Brg Detail Inner cap Bearing Lock Washer 8 = Insulating Tube/ sleeve (slide 6_ * Outer Cap Steel Spacer (slide 4,5) Insulating Spacer (Slide 4,5)
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Motor Mounting MECH1200 Foot Mount: Simple and common Tabs or feet that are attached at the four corners of the motor and attaches to a bedplate. Sometimes.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
(a) (b) A325-N or A325-X or A490-N A490-X Shear plane
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Welcome to KALLER International Distributors Meeting June 14-16, 2011 Workshop 7 Flange Strippers Hose-less Baseplate Hose systems.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
7/24/011 TFTR D&D Status July 24, /24/012 Project Status The TFTR D&D Project will be completed on time and within budget.
”-10”.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
½”-10”.
Bilge Pump Service Project Model Service Kit
475, 475V, 475XL 4”-10”.
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Design of Tension Members
MACHINE PARTS (FOR DCE / DIT)
BASEPLATES SLIDE SHOW.
SUPPORT.
CONNECTION Prepared by : Shamilah
Mechanical hardware.
Mechanical hardware.
LF856 2½”-10”.
STEEL PLATES.
Where to Use Warning Lines
SNS PPU Cryomodule Space Frame
Presentation transcript:

TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

12 x Belleville Washers 1” Threaded Rod Tightening Nut Lock Nut Belleville Canister Bearing Plate 1” High Strength Steel Plate Use TF Coil Case Bolt Holes 1” High Strength Steel Plate Gussets ½” Steel Plate Threaded or Welded Fixture TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)

Redundancy 3 fixtures per TFTR Segment Robust Design Factor of Safety of 3, New Hardware Verifiable Wire rope tension can be checked at any time by measuring Belleville stack height Relatively Easy To Install and Disassemble Uses standard, well known wire rope hardware installation techniques Quick disassembly once on fixture Easy to Repair Any likely failure will occur before a segment is ever lifted TFTR D&D FMEA REVIEW Vacuum Vessel Temporary Support System (VVTSS)