FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.

Slides:



Advertisements
Similar presentations
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Advertisements

THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
M. Diaz-AguadoFIELDS iPDR – Thermal Solar Probe Plus FIELDS Instrument PDR Thermal Subsystem Millan F. Diaz-Aguado SSL Berkeley
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Flux Gate Magnetometer and Boom Thermal Christopher Smith Thermal Engineer
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS INSTRUMENT SUITE
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Gayle K. Martin November 14, 2016
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
SPP FIELDS V1234 Thermal PSR
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS FM4/FM5 INSTRUMENT SUITE
LAT Requirements Verification in TVAC
0.0 Instrument Suite Name Presenter’s name
University of California, Berkeley
Precision Oven Thermal Design
Integration and Test Organization Chart
Presentation transcript:

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University of California - Berkeley

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-2UCB, September 21, 2005 Open Issues Two RFAs from the F1 Instrument Suite PER are still open. –Responses submitted: 05/20/05 –FM1 PER RFA 02: Thermal Verification Test Summary –FM1 PER RFA 03: Provide Instrument Level Thermal Balance Test Plan One RFA from Mission CDR is open. –Response Submitted: 01/10/05 –MCDR RFA 05: Adhesive Temperature Limits One PFR opened on 09/16/05 –PFR 095: Thermal Radiator Tape Adhesive Failure –Status: Under Investigation –Needs to be resolved before Instrument Integration but not before “delivery”

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-3UCB, September 21, 2005 FM1 PER RFA #2 DATE SUBMITTED: 05/20/05 TITLE: Thermal Verification Test Summary RFA CODE: IN#1.PER.RFA 02 REQUESTED BY: L. Fantano SPECIFIC REQUEST: Provide summary table(s) (spreadsheet?) that summarizes pertinent information associated with the THEMIS thermal verification test program. Include at minimum the following fields: Temp Sensitive Component ID, Cold operational Predict/Case, Hot Op Predict/Case, Op Cold Test Temp, Op Hot Test Temp, # of cycles, plateau duration, Cold non-operational Predict/Case, Hot non -op Predict/Case, Non-Op Cold Test Temp, Non-Op Hot Test Temp, # of cycles, plateau duration, test date, test facility, and test procedure/report reference. Also identify temperature sensitive components that have not been tested to limits plus appropriate margin and indicate future test plans for these items. SUPPORTING RATIONALE (ISSUE/PROBLEM): Project needs to book keep a consolidated accounting of the thermal verification test program that is maintained by the thermal engineer to assure that all thermal verification test requirements are satisfied. RESPONSE BY: Chris Smith All of the summary information requested is contained in the "Thermal As-Run" worksheet of the Engineering test matrix, which is included below. Double click icon to view table Themis ETM_TestRecord_5.xls

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-4UCB, September 21, 2005 FM1 PER RFA #3 DATE SUBMITTED: 05/20/05 TITLE: Provide Instrument Level Thermal Balance Test Plan RFA CODE: IN#1.PER.RFA 03 REQUESTED BY: L. Fantano SPECIFIC REQUEST: Provide instrument level thermal balance test plan. The test plan needs to describe the thermal balance test strategy, test configuration, and test procedure for each test article. The results of in-chamber thermal analyses needs to be documented that provides thermal vacuum test temperature predictions. SUPPORTING RATIONALE (ISSUE/PROBLEM): Inadequate discussion was provided regarding instrument level thermal vacuum test plans. RESPONSE BY: Chris Smith

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-5UCB, September 21, 2005 FM1 PER RFA #3 Response Per phone conversations on 5/12, here is a sketch of the thermal balance plans for the instruments. AXB: The AXB will be placed in a sheet metal thermal control box with three zones to simulate the top deck, bottom deck, and spacecraft interior. The chamber will be used to provide the environmental fluxes for the portions of the AXB that project outside the spacecraft simulation box. The goal of this test is general model correlation by helping determine the isolation at the top and bottom deck interfaces, to determine the thermal conductivity of the carbon fiber tube, and to determine the effectiveness of the blanket. SPB: The SPB will be placed in a sheet metal thermal control box with four zones to simulate the top deck, bottom deck, side solar panel and spacecraft interior. The chamber will be used to provide the environmental fluxes for the portions of the SPB that project outside the spacecraft simulation box. The goal of this test is general model correlation by helping determine the isolation to the spacecraft deck, the effectiveness of the MLI insulation, and to determine the heat leak through the open SPB doors. IDPU/ESA/SCM Preamp: These will be placed in a sheet metal thermal control box with four zones to simulate the top deck, bottom deck, side solar panel and spacecraft interior. The chamber will be used to provide the environmental fluxes for the portions of the ESA that project outside the spacecraft simulation box. The goal of this test is general model correlation by helping determine the isolation to the spacecraft deck, radiative coupling to a simulated spacecraft interior and the total emissivity of the ESA to the chamber.

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-6UCB, September 21, 2005 FM1 PER RFA #3 Response FGM Sensor: The FGM sensor will be tested on its boom to determine the effectiveness of the instrument MLI and mounting isolation. A test heater will provide the flux through the MLI and interface. SCM Sensor: The SCM sensor will be tested on its boom to determine the effectiveness of the instrument MLI and mounting isolation. A test heater will provide the flux through the MLI and interface. FGM and SCM Boom Assemblies: The full SCM and FGM boom assemblies will be tested to determine their conductive and radiative coupling to the top deck when in the stowed position. The chamber base plate will simulate the flux from the top deck and the chamber will provide the space environment. SST: The SST will be placed on the chamber base plate that will simulate the spacecraft corner panel. The chamber walls will provide the space environment. The goal of this test is general model correlation by helping determine the isolation to the spacecraft corner panel, the effective emissivity of the SST, and the isolation between the internal AmpTek pre-amps and the external casing.

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-7UCB, September 21, 2005 Mission CDR RFA #5 DATE SUBMITTED: 01/10/05 TITLE: Adhesive Temperature Limits RFA CODE: MCDR.RFA 05 REQUESTED BY: L. Fantano SPECIFIC REQUEST: Identify all adhesives employed in the various instrument designs. Determine temperature requirements associated with each. Verify that adhesive temperature limits are not violated and that appropriate adhesives have been chosen by the instrument leads. SUPPORTING RATIONALE (ISSUE/PROBLEM): Adhesive temperature limits need to be satisfied. RESPONSE BY: Christopher Smith / Paul Turin

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-8UCB, September 21, 2005 Mission CDR RFA #5 Response Project Response: The adhesives used are listed in the table below. The table shows the manufacturers listed temps and the temps the adhesives will see in service. Many of the epoxies used will see temperatures lower than those shown in manufacturers data. However, this data simply lists the extremes they have been tested to by the manufacturer and do not indicate possible failure at other temperatures. All Structural epoxies have been qualified by UCB to function at the predicted temperatures +/- 15 Deg C margin.

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-9UCB, September 21, 2005 PFR 095 DATE OPENED: 09/16/05 TITLE: Thermal Radiator Tape Adhesive Failure UNITS AFFECTED : SST, ESA, FGB, SCB, AXB PROBES AFFECTED: F1, F2, F3, F4, F5 ORIGINATOR: Christopher Smith PROBLEM DESCRIPTION: The ITO coated silver Teflon tape samples with 3M 9703 adhesive failed to remain adhered to its substrate in its third thermal vacuum test. First a testing history is required to understand the development of this problem. Before deciding to use this tape and adhesive for THEMIS we tested a sample of similar tape that was being used for the STEREO project. The tape used on THEMIS differs from the STEREO sample by manufacture date, perforation pattern, and method of adhesive application. The STEREO tape sample was thermal cycled 5 times from –135 to +80 ºC and examined. All tape samples remained adhered to their substrate and the tape’s surface conductivity remained within specification. We then ordered the THEMIS specific tape from Dunmore Corp. The STEREO tape was also ordered from Dunmore but came without the adhesive. APL personnel applied the 9703 adhesive manually on site. For THEMIS we had Dunmore apply the adhesive in their factory.

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-10UCB, September 21, 2005 PFR 095 (cont) When the adhesive arrived it was attached to the same sample of aluminum and thermal cycled 6 times from –60 to +65 ºC. In this test all five tape samples failed to remain adhered to their substrate. After consultation with 3M we modified our application method. The tape was applied as it was in the first test and then warmed to 50 ºC. While still warm it was re- rolled and placed back in the oven for ºC. These samples were then thermal cycled 6 times from –65 to +75 ºC and all tape samples remained adhered to the substrate so the test was considered a success. However, after the tape sample sat on my desk for 21 days at room temperature, it was noticed that three of the tape edges, out of 24 edges on 6 tape samples, had pulled up. This tape is used on the AXB, FGB and SCB Hinge, ESA, and SST. Three flight AXB units have been delivered for spacecraft integration but they all used the STEREO tape which passed qualification. We have enough excess STEREO tape to complete the remaining AXBs and FGB/SCB hinges. Analyses Performed to Determine Cause: In Progress Corrective Action/ Resolution: In Progress

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-11UCB, September 21, 2005 EFI PreAmp Thermal Testing Setup

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-12UCB, September 21, 2005 Thermal Testing Outline Cycle Accumulation 2 cycles at instrument level - constrained by schedule 6 cycles at instrument suite level 4 cycles at spacecraft level 12 cycles total for every flight instrument 4 hour soaks at hot and cold targets Every TVAC test is preceded by a PER where thermal engineer signs off on procedure Status Over 100 component TV Tests have been completed Over 3300 hours of TV testing to date All Flight units tested to meet GEVS requirements As run procedures and reports are available in the EIDP

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-13UCB, September 21, 2005 ESA/IDPU Thermal Testing Status F1 retested following rework

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-14UCB, September 21, 2005 FGM Thermal Testing Status F4 FGS was not conductively mounted correctly in first qualification test. Retest was done in air at limits shown All FGM sensors have completed thermal vac testing No changes since F1 PER

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-15UCB, September 21, 2005 SCM Thermal Testing Status Thin crack in the potting for two antennas during first ETU test. Potting method reworked and retested All SCM Sensors have completed thermal vac testing No changes since F1 PER

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-16UCB, September 21, 2005 SCM/FGM Boom Thermal Testing Status F1 booms re-named F6 after anomalous vibration results F1 SCM and FGM will get a total of 4 cycles at the instrument suite level instead of the normal 8 due to the swap of F1 and F6 F1/F2 retested twice due to test setup errors All FGM and SCM booms have completed thermal vac testing

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-17UCB, September 21, 2005 SST Thermal Testing Status F3 renamed F4 and F4 renamed F3 F1, F2, and F3 need to be recalibrated following mezzanine board rework

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-18UCB, September 21, 2005 EFI PreAmp Thermal Testing Status ETU 1 Preamp had no problems but FR4 board was switched to Thermount 85 NT for ETU 2 and flight Six ETU 2 Qual Units went through 24 cycles, Two of those units added an additional 14 cycles for a total of 38 All EFI Pre Amps have completed thermal vac testing No changes since F1 PER

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-19UCB, September 21, 2005 EFI SPB Thermal Testing Status Qual ETU motor was a motor only stress test, no problems seen SPB design changed from flying with doors closed to flying with doors open. ETU was retested after the small modifications this required Calibration runs done with the sphere keyreels to determine release tension at hot and cold deployment conditions All SPB units have completed thermal vac testing No changes since F1 PER

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-20UCB, September 21, 2005 EFI AXB Thermal Testing Status Due to delivery schedules to Swales we were unable to include the AXBs in the suite testing. They accumulated the 6 suite cycles on their own All AXB units have completed thermal vac testing

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-21UCB, September 21, 2005 Suite TV Testing TV Plan F2 and F3 Suites Together 6 Suite Level TV Cycles, Survival, Cold Start and Bake-out (TQCM Monitor) Details contained in THM-SYS-PRC-004, THEMIS INSTRUMENT SUITE Thermal Vacuum Test Procedure, Rev. B (unchanged from F1)

FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-22UCB, September 21, 2005 Instrument Suite Thermal Testing Status Due to an error F1 Suite did not go to the cold survival temperature before turn on. All units have separately been turned on at their cold survival limit. F2-F5 will be tested to the –60 survival temperature