Classification: Internal Status: Draft Design of offshore structures in a field development perspective ”From nothing to nothing with solid profit” $$

Slides:



Advertisements
Similar presentations
Mariner – a project in the making 20 December
Advertisements

Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
FPSO Research Forum Forum Discussion OTRC, College Station USA April 2003.
Relex Reliability Software “the intuitive solution
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Principles for risk and uncertainty analysis and management, in a production assurance setting Roger Flage PhD student on the RAMONA project (research.
Chapter 8: Strategy and Analysis Using NPV
Chapter 11 Cash Flow Estimation & Risk Analysis. 2 Topics Estimating cash flows: Relevant cash flows Working capital treatment Risk analysis: Sensitivity.
ISO Wellhead Integrity
Model approach to future offshore exploration Peter Rosenkranz Utrecht 15 January 2009.
Project Estimation Describe project scope, alternatives, feasibility.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
Tripartite Meeting Beijing, 1 November 2005 IMO GBS Classification Society’s View about the Scope, Verification Process and Acceptance Criteria Roberto.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #19.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Chapter 5 Initiating and Planning Systems Development Projects
‘2nd YEAR OF ENGINEERING SURVEY PROGRAM OF SKK MIGAS-KKKS’
OilSim Exploration OLF OILSIM Overview Purpose: Enhance your overall understanding of petroleum exploration Multidisciplinary challenge You are.
Role and Components of Project Evaluation
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Geothermal energy GEOTHERMAL ENERGY Fausto Batini Enel – International Rome – Italy Rome, th July.
Crack management Clemens van der Nat Bluewater Energy Services BV.
Last update: © Lahmeyer International GmbH Portfolio Effect of Diversified Renewable Energy Sources Gaining benefits from the Portfolio Effect.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Factor of Safety (Safety Factor) In the calculations, Material strengths, Manufacturing process Is used to provide a design margin over the theoretical.
Kesting Ventures® Corp. 1 KVC Knowledge Planning Market Value System Modules and Programs.
Freak Waves: A Suggested Definition and Possible Consequences for Marine Structures 1. What is the target safety level of offshore structures? 2. Are rogue.
Chapter 5 : Initiating and Planning Systems Development Projects.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Jens Petur Bærentsen Simprentis Marcos Monteferrante OILSIM EXPLORATION Svalex 2007 Longyearbyen, Svalbard, Norway August 2007.
OilSim Faroes 2007 Facilitator Course Tórshavn, 2. Oktober, 2007.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
1 Software Process Models-ii Presented By; Mehwish Shafiq.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
Lecture#16 Estimation of the system’s dependability The Bonch-Bruevich Saint-Petersburg State University of Telecommunications Series of lectures “Telecommunication.
Classification: Internal Status: Draft Predicting characteristic loads for jackets and jack-ups Shallow water location – quasi-static approach Problem.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Planning schemes Statutory documents under s.20(2) of LUPAA –outline policies and objectives –regulate or prohibit use or development of land –reserve.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
Taking EDM to the Enterprise Plant Engineering Life Cycle conference (PELC) – The Hague Practical experiences with implementing an efficient.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
1 SMALL BUSINESS MANAGEMENT Chapter Three Evaluation of a Business Opportunity.
PROJECT BACKGROUND Location coordinate :
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Assessment of offshore wind turbines support structures within a reliability based framework 1 Dr Athanasios Kolios Research Fellow, Risk and Reliability.
Oil and Gas Training Lusaka April 2016.
Introduction to Well Completions
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Natalie Stirling-Sanders Procurement Sustainability Manager September 8 th, 2015 – SPE Lunch Mexico Local Content.
Rob Connatser NSS Instrument Work Packages and XLPM.
Project Estimation Describe project scope, alternatives, feasibility.
Sourcing Event Tool Kit Matrix Pricing & Tiered Pricing User Guide
7 Capital Budgeting Decisions–Part I
Corallian Energy: licence interests
NAME 217: Theoretical Ship Design
Subject Name: SOFTWARE ENGINEERING Subject Code:10IS51
What is the target safety level of offshore structures?
Presentation transcript:

Classification: Internal Status: Draft Design of offshore structures in a field development perspective ”From nothing to nothing with solid profit” $$ Before While After

2 Activity chain in a field development and operation Screening of opportunities. Strategy selection Preparation of bid for blocks Planning of exploration and operation Feasibility studies Concepts screening Project ececution (Field deveopment) Production and maintenance operations Abandon- ment If acceptable NPV, deliverable is: Plan for Development and operation Planning of drilling, performing drilling Preparatory work for licence rounds Detail engineering Construction, fabrication and installation. Comissioning and start-up Production and transportation of oil and gas. Stopping production Platform removal

3 Activity chain in a field development and operation Cost and income versus time Screening of opportunities. Strategy selection Preparation of bid for blocks Planning of exploration and operation Feasibility studies Concepts screening Project ececution (Field deveopment) Production and maintenance operations Abandon- ment Income Cost 2 – 3 years 5 – 80 years CAPEX OPEX

4 NET PRESENT VALUE (NPV) Both cost and income are calculated representing present value: * Cost: Area under red curve, C PV (present value for total cost) * Income: Area under green curve, I PV (present value for total income) Net Present Value (NPV): NPV = I PV – C PV Requirement: NPV > 0 for an acceptable discount rate

5 Where will our major contributions be? Screening of opportunities. Strategy selection Preparation of bid for blocks Planning of exploration and operation Feasibility studies Concepts screening Project ececution (Field deveopment) Production and maintenance operations Abandon- ment Design of offshore structures takes place here In addition, experience in structural design and knowledge in marine engineering are needed in these phases Experienced engineers Hiring and controlling drilling rigs Modification and repair Engineering in removal phase

6 Concept(s) selection An important part of the plan for Development and Operation Overall field solution is important parameter. A self standing field or a part of a cluster of fields. Type of field – gas field or oil field. Need of oil storage? Daily oil and/or gas production. Quality of oil and/or gas. Water depth aso

7 Course: Design of offshore structures We will assume that a concept is chosen which fulfill field specific properties and specified functional requirements, i.e.: we know forexample that for a given a field a semi-submersible is to be used. The basic dimentions of structure are roughly known forexample through the required deck area and required capasity of deck weight. Our work is to know how to establish the environmental loads, permanent loads and functional loads and ensure that the structure can withstand these loads with margins required by rules and regulations. In view of this, the content of the course in 2008 is: SH: * A brief introduction to governing rules and regulations. * Briefly review some primary standards and useful recommended practise documents (N-003 and DNV RP C- 205). * Methods for prediction of adequate characteristic loads for design work (focus on environmental loads). JA: * Limit state control regarding structural response. DNV: * Introduction to Sesam – a very much used program for load predictions and strctural response calculation.

8 Load side and capacity side Relative uncertainty Load, Capacity Probability density Load Capacity Typical situation for overload control External Fatigue Load, Fatigue Capacity Probability density External fatigue load Capacity and response Typical situation for fatigue assessments