National Bridge Inventory Coding Guide Update Pontis Users’ Group Meeting September 5-6, 2007 Portland, Maine.

Slides:



Advertisements
Similar presentations
Budget and Reporting Processes and Formats Facilitating Improved Decision Making for Service Delivery David Krywanio.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
W E L C O M E.
AASHTO Internal Audit Conference 2012 – Phoenix Daniel Fodera, CMQ/OE Program Management Improvement Team Federal Highway Administration.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Moving transportation into the future Strategic Highway Research Program.
MDOT Load Rating Local Agency Workshop Training Bradley M. Wagner, PE Load Rating Program Manager.
Update - Subcommittee on Bridges and Structures Kelley Rehm, PE July 2011.
1 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Trends of Regulations and Nuclear.
65 th Annual NDACE Convention Bryon Fuchs, P.E. NDDOT-Local Government.
Rating of Local Bridges for SHVs Using Virtis Software Virtis/Opis User Group Meeting August 3-4, 2010 Moises C. Dimaculangan, P.E. Minnesota Department.
ODOT/FHWA Stewardship Oversight Committee Meeting Gary Bowling (ODOT) and Tim Rogers (FHWA) May 29, 2012 Bridge Program Performance Measure Overview.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
1 Division of Human Resources Performance Evaluation Online Application.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Thomas Saad, P.E. Senior Structural Engineer Federal Highway Administration Phone: (708)
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Employment and Training Administration DEPARTMENT OF LABOR ETA Reporting and Data Validation Updates Presenters: Wes Day Barbara Strother Greg Wilson ETA’s.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Snapshot of Member States’ Feedback after the Minneapolis Bridge Collapse - Summary of Information Collected via Recent Surveys Malcolm Kerley, Chair –
Office of Highway Safety Bridge Inspections Dan Walsh.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Design Standards For Local Agency Bridges Statewide Local Agency Project Delivery Conference May, 2006 Design Standards For Local Agency Bridges Statewide.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Driving Indiana’s Economic Growth. Management and Preservation of Indiana's Historic Bridges: A Programmatic Approach Thanks to Mead & Hunt & FHWA-IN.
Value Engineering at FHWA
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
1 Ministry of Transport, Public Works and Water Management.
Foundation Degree IT Project Milestone 3: Implementation, Testing and Evaluation.
1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.
May 15-16, 2012 Orange Beach, AL James F Boyer, P.E. Assistant State County Transportation Engineer - Maintenance.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Design FRAME problem solving with the engineering design process F R A M E TEXAS TECH UNIVERSITY T-STEM Center © 2009 Texas Tech University T-STEM Center.
How do I get through the first days on board? Photo: Pierre Meke, Cameroon, 2009.
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
Using the AASHTO Audit Guide for the Development of A/E Consultant Indirect Cost Rates Introduction Target Audience Course Structure Learning Outcomes.
Master Patient Index (MPI) Project Update Presentation to NADB Nick Elcock 14 th January 2009.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Forms Completion Technical Standards Branch Class B Bridge.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Database Management Systems.  Database management system (DBMS)  Store large collections of data  Organize the data  Becomes a data storage system.
Request for Proposal (RFP)
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Is FHWA’s Oversight responsibility foggy? Is Oversight relationship to strategic plan clear?
Motor Fuel Reporting Federal Highway Administration Ralph Erickson.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Microsoft Word 2007 Tracking Changes. Review Tab Select the Review tab from the ribbon to begin Track Changes.
A Marketing Approach to Bridge Longevity All about being specifically wrong … while being generally right Presented by: Heinrich O. Bonstedt Executive.
ECE791 Senior Design Experience Project Requirements and Timeline.
DOT Implementing the Surface Transportation Domain Daniel Morgan 26 October 2015.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 29, 2011.
Items Version 18 Upgrade Training. Items: Version 18 Upgrade Training 2 All of the information in this document is the property of Ex Libris Ltd. It may.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
2014 – 2015 EVALUATION PERIOD KCTCS ePerformance Training.
DEPARTMENT OF HEALTH CENTER FOR BIOLOGICS AND HUMAN SERVICESEVALUATION and RESEARCH AND HUMAN SERVICES EVALUATION and RESEARCH Update on the Somatic Cell.
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
Dynawebdevelopers.com HR Targets Application User guide HR Targets Application version 1.1 September 2006.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Supporting quality devices
<Student’s name>
Tribal Hazard Mitigation Planning
City of Milwaukee Department of Public Works
Uploading Data in the Staff Interchange
MAE 4291 UPDATE AND HOMEWORK ASSIGNMENT 4
Assessment and Weeding as Part of a Major Renovation Project
Transportation Performance Management Resources you can Use Susanna Reck FHWA Office of Transportation Performance Management June 2019 Outline: What.
Fiber Reinforced Polymer Systems
Presentation transcript:

National Bridge Inventory Coding Guide Update Pontis Users’ Group Meeting September 5-6, 2007 Portland, Maine

2 Current Status  Received over 2000 comments on the October 2006 version  FHWA team is: Reviewing comments and updating document concurrently Reviewing comments and updating document concurrently Preparing responses to all comments Preparing responses to all comments Scaling back proposed changes Scaling back proposed changes

3 Change Justification  Must be necessary to operate federal bridge programs (HBP, NBIP)  Must be necessary to ensure bridge safety  Must be necessary for FHWA’s stewardship and oversight responsibilities  Must be necessary to be responsive to Congress

4 Summary of Changes  Delete substructure material/design items  Delete charts and quantitative descriptions from deck, super, sub and culvert condition ratings  Format–similar item field size as ’95 Guide  Keep load rating date  Keep Scour Plan of Action item

5 Summary of Changes  Use rating factor for Structural Evaluation  Use 0-9 scale for appraisal items calculated by Edit/Update  Refer to BIRM to minimize commentary  Use mm/dd/yyyy format for Inspection dates  Use 1995 Guide criteria for under records

6 Summary of Changes  Keep Deck Geometry item separated Deck roadway width item Deck roadway width item Deck overclearance item Deck overclearance item  Keep Underclearance item separated Roadway Hz UndrClr item Roadway Hz UndrClr item Railroad Hz Undrclr item Railroad Hz Undrclr item Roadway Vt. UndrClr item Roadway Vt. UndrClr item Railroad Vt. UndrClr item Railroad Vt. UndrClr item

7 FHWA Plan of Action  Complete proposed Specifications  Complete responses to comments on the October 2006 version  Continue evaluation of changes  Present document to AASHTO T-18 September 2007  Develop an implementation strategy and timeline with T-18 (On hold)

8 Questions  Larry O’Donnell (708) (708)