CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.

Slides:



Advertisements
Similar presentations
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Advertisements

LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
A rectangular dog pen is constructed using a barn wall as one side and 60m of fencing for the other three sides. Find the dimensions of the pen that.

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 GLD Surface Assembly Y. Sugimoto KEK
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
ICARUS Cold Vessels Thermal insulation Project progress report.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Single Phase Test at CERN Cryostat/Cryogenics Update
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
TPC Design Concept: From MicroBooNE to LAr20
Compressor status AWAKE Technical Board meeting 19 August 2015.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Cryostat Design Review Update Steve Kettell DUNE Collaboration Meeting – Technical Board January 14, 2016.
1 WA105 General Meeting CERN, 21/9/2015 Technical Board, introduction Dario Autiero, IPNL Lyon.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Installation of the T600 at Fermilab Fermilab, February 15,
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.
Teleconf ACS – FREIA 28th March 2017
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Plans for this week MWPC: wire stretching today
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
LBNF CAD models, Drawings and Component list
Neutrino v2.1 structural assessment
Various Views From CAD Layout Emphasis on the relative locations of
Status of the Mechanics at Ciemat.
INSTALLATION SEQUENCE
First tests on the roll-formed field cage.
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
EHN1 Neutrino Installation Plans
Test box for ProtoDUNE SP – Integration Test
Cryostat design and heat loads
Challenges for FCC-ee MDI mechanical design
Hall C SHMS & Configuration Status
Bunker Wall Design Wall
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

CRYOSTATS DESIGN

WA105 – Cryostat Cut-out

WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and they have started the engineering study on their side for ENH1-WA105. They will also check the heat loss at 1000mm of insulation (5W/m 2 as at b. 182)

Franco Sergiampietri Integration of all the feedthroughs at the roof structure. Closely working with Franco Sergiampietri. 12 x Anode deck supports 12 x Signal FT 16 x Field Cage supports 4 x Slow Control FT 1 x High Voltage FT 1 x Manhole Total: 46 roof penetrations

We are expecting to deliver the structure in ENH1 at the first half of next year and to do the final pre-assembly in the second half. The plan is to pre-assemble as much as possible and store complete walls in the existing building. Investigating a possibility to start the mechanical work even before the building extension is ready. Currently working on the installation procedure in ENH1. ENH1 - Layout

The detector installation additional structure for b. 182 to be delivered in the next 10 days. 1x1x3 in b. 182

Vacuum Box leak detection 1x1x3 in b. 182

Integrating the top cap to the structure SBND

Optimized the main beam – now HL1100M Optimized the installation: Splitting some beams on smaller pieces Roof long beam in two Corner beam maximum height of 3000mm LBNF

Thank you!