FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.

Slides:



Advertisements
Similar presentations
Aqua MODIS Cold FPA Performance and Operation MODIS Characterization Support Team (MCST) April 25, 2012.
Advertisements

Characterization of ATMS Bias Using GPSRO Observations Lin Lin 1,2, Fuzhong Weng 2 and Xiaolei Zou 3 1 Earth Resources Technology, Inc.
ILS and alignment revisited David Griffith, Voltaire Velazco University of Wollongong with very significant inputs from John Robinson (Lauder) Frank Hase.
VIIRS Reflective Solar On-orbit Calibration and Performance Jack Xiong and Jim Butler Code 618.0, NASA/GSFC, Greenbelt, MD CLARREO SDT Meeting, NASA.
Yu. I. BARANOV and W. J. LAFFERTY Optical Technology Division Optical Technology Division National Institute of Standards and Technology, Gaithersburg,
Equipe Simulation Visualising Your Imagination Achieving FAA / JAA Level D with current, low cost digital projection technology Contact:
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
ABRF meeting 09 Light Microscopy Research Group. Why are there no standards? Imaging was largely an ultrastructure tool Digital imaging only common in.
Remote sensing in meteorology
RHESSI/GOES Observations of the Non-flaring Sun from 2002 to J. McTiernan SSL/UCB.
CIRSGSFC April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – CIRS Instrument Group presented.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
IFTSUV: an Imaging Fourier Transform Spectrometer in the UV Anne Millard, 3 rd year PhD student, directed by P. Lemaire and J.-C. Vial.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
0. To first order, the instrument is working very well ! 1.Evolution of the IR detector with time 2.Stability of the L channel 3.Saturation 4.Linearity.
SIAMOIS, kickoff meeting, Paris, may, SIAMOIS: optical test bench BOSS (Banc Optique SiamoiS) Pernelle Bernardi Observatoire de Paris-Meudon,
SCILOV10 FP Meeting SCIAMACHY irradiance validation SCILOV10 FP, Frascati, 26/27 February, 2014 M. Weber and S.Noël Institute of Environmental Physics.
Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
MAESTRO Sun Scan Analysis Florian Nichitiu May 14, 2004.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
COST 723 Training School - Cargese October 2005 OBS 3 Radiative transfer for thermal radiation. Instruments Bruno Carli.
Surace Cal Summit III Jason Surace April 19, 2007 Spitzer-IRAC/Akari-IRC Cross-Calibration With figures by Ohyama, Wada, and Tanabe.
Observational Astrophysics I
ISPRS Gulfport Calibration Workshop December 3, 2003
ACE Comparisons Kaley Walker, Ashley Jones, Chris Boone, Chris Sioris, Felicia Kolonjari, Sean McLeod, Peter Bernath and Tom McElroy MOHAVE-2009 #2 Workshop.
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
NASA ESTO ATIP Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations 12/12/01 NASA Goddard - Laser Remote Sensing Branch 1 James B. Abshire,
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Hyperspectral remote sensing
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Validation Defination Establishing documentary evidence which provides a high degree of assurance that specification process will consistently produce.
Analysis of Nonlinearity Correction for CrIS SDR April 25, 2012 Chunming Wang NGAS Comparisons Between V32 and V33 Engineering Packets.
Agenda (1)  Review of Status –SCISAT I ProgramVictor Wehrle  Current Knowledge and Further Needs –FTS/Imager InstrumentChris Boone –MAESTROInstrumentTom.
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Recent Solar Irradiance Data From SBUV/2 and OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) SOLID WP-2 Workshop.
BELGISCH INSTITUUT VOOR RUIMTE-AERONOMIE INSTITUT D’AERONOMIE SPATIALE DE BELGIQUE BELGIAN INSTITUTE OF SPACE AERONOMY BELGISCH INSTITUUT VOOR RUIMTE-AERONOMIE.
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
Measurements Measurements and errors : - Here, the goal is to have some understanding of the operation and behavior of electrical test instruments. Also,
Scisat Test Readiness Review MAESTRO Evaluation and Verification Tests University of Toronto 29 January 2003.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
Life in the AtacamaCarnegie Mellon Insolation of the Atacama Desert Michael Wagner James Teza July 28, 2003.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
GERB in-flight calibration Monitoring Instrument Gain.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
FAST SCAN SUBMILLIMETER SPECTROSCOPIC TECHNIQUE (FASSST). IVAN R. MEDVEDEV, BRENDA P. WINNEWISSER, MANFRED WINNEWISSER, FRANK C. DE LUCIA, DOUGLAS T. PETKIE,
An Experimental Approach to the Prediction of Complete Millimeter and Submillimeter Spectra at Astrophysical Temperatures Ivan Medvedev and Frank C. De.
1 Setting Laser Power and PMT Gain Begin with laser power at 20% Set PMT gain to 6.00.
1 SBUV/2 Calibration Lessons Over 30 Years: Liang-Kang Huang, Matthew DeLand, Steve Taylor Science Systems and Applications, Inc. (SSAI) / NASA.
DECam Spectrophotometric Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
STO Test Flight Strawman
GERB Ground Calibration Overview and Status J. Rufus
Pre-launch Characteristics and Calibration
Single Object & Time Series Spectroscopy with JWST NIRCam
SOFIE Overview Mark Hervig Larry Gordley.
VIRTIS Operations at Lutetia
Calibration and Performance MODIS Characterization Support Team (MCST)
Instrument Characterization: Status
Meteorological Service of Canada
“Brief” update on ACE water vapour
S-NPP Visible Infrared Imaging Radiometer Suite (VIIRS) Lunar Calibration using GSICS Implementation of the ROLO model (GIRO) for Reflective Solar Bands.
Launch and On-orbit Checkout
Preliminary SCIAMACHY Lunar observations as intercalibration source
Presentation transcript:

FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003

What Needs to be Done Performance testing of: –Passive cooler / detectors –Suntracker / co-registration –Imagers –Spectrometer (ILS, FOV etc.)

Passive Cooler Evaluate performance of passive cooler using He cooled target Monitor detector and target temperatures –While cooling from room temperature –During instrument temperature transitions Priority 1

Detector Temperature Measure while cooling detector – every 5 K from 110 → 70? K High resolution spectra + N 2 O gas cell –Examine ILS vs. T and estimate NESR –Retrieve temperature and pressure Low resolution spectra –Bandpass characteristics Priority 1

Detector Non-linearity Measure while cooling detector – every 5 K from 110 → 70? K Low resolution interferograms –At 1750, 2250, 2750 K ( K from previous) –Ratio of centre burst to first side lobe to calculate –5800 K point measured on orbit Priority 1

Operational Cycling Measure at 90 K and lowest achieved T Simulate normal operational power dissipation –Cycle between SCIENCE and SLEEP mode as for nominal occultation –Monitor detector temperature for any changes in cooling rate Priority 3

Detector Monitoring InSb Instability (Priority 1) –Monitor channel for recurrence of problem Contamination Monitoring (Priority 1) –Measure low resolution spectra every 12 hours using 2273 K HBB –Need criteria for when decontamination should be initiated

Suntracker Sunscan – exercise mode using typical scan for MAESTRO calibration (Priority 1) Stability – measure in closed loop with sunrise simulator (~50 s occultation) (Priority 2) Pointing – characterize pointing over ±1.5 ° range using “leapfrog” technique (Priority 2) + 80 mrad A. Setup suntracker mirror to point here. B. Move collimator mirror to move image here

Co-registration MAESTRO to VIS (Priority 2) –On bench with 532 nm laser source and in TVac with Xe lamp and pinhole FTS to NIR (Priority 2) –Combined QI / HBB source and pinhole NIR to VIS Registration (Priority 3) –relative orientation and pixel offset between arrays

Imager Characterization Flat Field Bench –Solar simulator to provides uniform illumination (Priority 2) Flat Field TVac –Illuminate stepwise using QI source (Priority 2) Non-linearity TVac –Stepwise illumination and vary attenuation (Priority 2)

Imager Charaterization Gain – characterize imager settings (Priority 2) Dark Current – measure versus instrument temperature; perform prior to each test with imagers (Priority 2) Cropping – test modes with sunrise simulator and attenuated source (Priority 3)

Gas Cell Measurements Combined – Measure NO 2 and O 3 with both FTS and MAESTRO (Priority 2) –compare retrieved temperature and pressure values Additional – N 2 O measurements with FTS at instrument temperature plateaux (Priority 2) –Examine ILS vs. T and estimate NESR –Retrieve temperature and pressure

Gas Cell Measurements Occultation – Use suntracker to follow simulated occultation and measure FTS (and MAESTRO) spectra (Priority 3) –Have to step through occultation to allow for time for sufficient coadds –Suntracker pointing in closed-loop at fixed source –Somewhat unwieldy test that cannot provide “test as we fly” conditions

FTS Tests IR FOV – Move shutter stepwise across FOV and measure ZPD (Priority 2/3) Non-uniform FOV Illumination – Use split attenuator to observe ILS effects (Priority 3) Modulation Efficiency – To be done by Bomem (Priority 2)

Limit in Testing HBB cavity lifetime ~30-40 minutes at 3273 K and we only have 4 cavities Almost all tests done at max. temperature –Priority 1 ~ 57 minutes –Priority 2 ~ 65 minutes –Priority 3 ~ 268 minutes Majority of # 3 is Occultation – 223 minutes –without it we should have enough HBB lifetime to complete testing program

Issues Detector Decontamination –Need criteria for when this should be initiated Occultation test –Significant drain on HBB lifetime –Recommend deleting from test schedule