Preparing for operations with the European Extremely Large Telescope Fernando Comerón.

Slides:



Advertisements
Similar presentations
TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Advertisements

Sarah Kendrew Leiden Instrumentation Group.  One of eight potential instruments for the European ELT, the largest planned optical/IR telescope for the.
Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
European Southern Observatory European Southern Observatory © ESO 2005 Page 1 AO Department Leiden, April 26th 2005 MUSE M ulti U nit S pectroscopic E.
Multi-Loop PID Controllers All Watlow® multi-loop time/temperature controllers offer auto-tuning which automatically sets PID control parameter for optimum.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
December 21-22, 2005Subaru Users Meeting, Mitaka Status of Remote Observation / Service Observation Junichi Noumaru Subaru Telescope National Astronomical.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Widening the Scope of Adaptive Optics Matthew Britton.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
PSWG March Adaptive Optics Systems Engineering on GMT Peter McGregor.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Next generation wide field AO (GLAO) and NIRMOS for Subaru Telescope.
Sedimentology & Stratigraphy:
T-REX OU4 HIRES The high resolution spectrograph for E-ELT E. Oliva, T-REX meeting, Sexten Pustertal (I)1.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
22 February 2006 Quo Vadis ? Wide Field Imaging A Wide Angle Very Low Threshold Air Cherenkov Imaging Telescope Razmick Mirzoyan MPI Munich, Germany.
DCS Overview MCS/DCS Technical Interchange Meeting August, 2000.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Telescopes & recent observational techniques ASTR 3010 Lecture 4 Chapters 3 & 6.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
European Extremely Large Telescope - Status April ESO.
Extremely Large Telescope and its AO systems
Astronomical Spectroscopy and the Virtual Observatory ESAC, March 2007 VO tools and cross-calibration Pedro García-Lario European Space Astronomy.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Future Plan of Subaru Adaptive Optics
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
ATLAS The LTAO module for the E-ELT Thierry Fusco ONERA / DOTA On behalf of the ATLAS consortium Advanced Tomography with Laser for AO systems.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
Conference “Feeding the Giants: ELTs in the era of Surveys” -- Ischia 31/08/2011 Large field of view and ELTs: an impossible marriage? Paolo Ciliegi (INAF.
K. G. Strassmeier, Polarimetry with ELTs, Utrecht, Nov./Dec Smart Focal Plane Spectropolarimetry with the E-ELT Klaus G. Strassmeier, Leibniz-Institute.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
Design time and Run time Chris, Andrea, Martina, Henry, Antonio, Ole, Philippe, Hartmut, Anne, Jeff, Felix, Sebastian, Kurt.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
THE INTEGRATED PHOTONIC SPECTROGRAPH MULTIPLE OFF-AXIS INPUTS AND TELESCOPE RESULTS Nick Cvetojevic 1,2, Nemanja Jovanovic 1,2, Joss Bland-Hawthorn 3,
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
Why is the VLT very efficient? Fernando Comerón On behalf of Francesca Primas and Martino Romaniello.
The SALT Development Committee Recommendations Regarding New Instruments (Matt Bershady) Rob Fesen Janusz Kaluzny Wolfram Kollatschney Darragh O’Donoghue.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
National PE Cycle of Analysis. Fitness Assessment + Gathering Data Why do we need to asses our fitness levels?? * Strengths + Weeknesses -> Develop Performance.
Big Bear Solar Observatory Some ground-based technology developments that will propel solar physics Phil Goode for Jeff Kuhn Big Bear Solar Observatory.
Page 1 Lecture 15 The applications of tomography: LTAO, MCAO, MOAO, GLAO Claire Max AY 289 March 3, 2016.
Observing brown dwarfs in the E-ELT era
Grid Optical Burst Switched Networks
Pyramid sensors for AO and co-phasing
Phil Goode for Jeff Kuhn Big Bear Solar Observatory
ESO Phase 1 & 2 Procedures Gaitee Hussain
Theme 2 AO for Extremely Large Telescopes
Observing with Modern Observatories
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

Preparing for operations with the European Extremely Large Telescope Fernando Comerón

The E-ELT A 42-m segmented mirror telescope for observations from the blue to the thermal infrared Fully steerable Location still to be decided Aiming for a complement of instruments covering a large parameter space 5-mirror anastigmatic configuration (astigmatism, coma and spherical aberration corrected over a large FoV) Versatile configuration: two Nasmyth foci, two gravity invariant foci, a coude focus The European Extremely Large Telescope being projected by ESO is Europe’s proposal for the next generation of giant optical telescopes expected to operate by the end of the next decade

An adaptive telescope The E-ELT is designed as an adaptive telescope, with a deformable M4 and a tip-tilt M5. Ground-layer AO (GLAO) correction provided by the telescope (3 Natural + 4 Laser Guide Stars) Multi-Conjugate AO (MCAO) or Laser Tomography AO (LTAO) provided by post-focal AO modules Multi-Object AO (MOAO) and Extreme AO (XAO) integrated in some of the proposed instruments

Instrumentation currently under study Eight instruments are currently undergoing Phase A study: EAGLE, multi-IFU NIR spectrograph with MOAO CODEX, high resolution, ultrastable visual spectrograph using GLAO or seeing-limited MICADO, NIR camera using MCAO EPICS, high-contrast imager and spectrograph with XAO HARMONI, single-field, wide-band spectrograph, using GLAO, posibly MCAO/LTAO METIS, mid-infrared imager and spectrograph, using GLAO, possibly LTAO OPTIMOS, wide-field visual multi-object spectrograph, using GLAO, possibly MCAO SIMPLE, high-resolution NIR spectrograph, using GLAO, possibly LTAO Even if only a few are built, this promises variety in wavelengths, techniques, AO modes…

Current status E-ELT project currently undergoing Phase B development Baseline reference design v2.0 prepared in March 2008, v3.0 expected by end of 2008 Phase B budget 57.2 MEur, plus 6.1 MEur in FP7-funded project “Preparing for construction of the E-ELT” Proposal for construction planned for mid 2010 Completion foreseen in 2017

Requirements from the community A multi-purpose facility…  Wide variety of science cases  Reflected in instrumentation studies  Serving a broad community  Offered under conditions similar to other current facilities  No expectation to be executing a single program exclusively for extended periods of time  “Easy” to use, based on known operations principles: “One more telescope” …operating at the limits  Extremely demanding cases in terms of telescope and instrument performance  Operations must ensure that requirements are properly captured, strategies can be implemented, and observation execution can proceed accordingly

Operational requirements on the telescope Several programmes may be executed on any given night Several instruments may be used on any given night, possibly using several AO modes Ability to react to short-time changes in the conditions Best served by extensive use of Service Mode, taking as a base the VLT model Basic requirements on telescope and instruments  Fully steerable  Quick preset time, matched by the dome  Short time needed to switch between instruments  Fast setup of telescope AO  Fast setup of post-focal AO Guaranteed by Basic Reference Design and Top Level Requirements

Dealing with many instruments E-ELT instruments are in principle interchangeable (lifted to Nasmyth platforms, brought to the adapter on carriages on rails) But not on short notice: instrument exchanges must be planned at least days in advance, no use for adapting to changing conditions However, up to ~7 instruments simultaneously mounted still offer lots of flexibility (will more be built?)

Operational requirements on instruments availability Operational efficiency requires a sufficient number of instruments in stand-by at any given time: 1) Guaranteeing suitable scientific exploitation of any atmosphere conditions Coverage of a wide range of parameters (and AO modes) and fast switch- over times 2)Guaranteeing the scientific exploitation of the best conditions. This implies permanent availability of instruments demanding the best conditions (e.g. XAO instrument) 3) No downtime regardless of conditions Virtually ensured by the availability of a large number of focal stations and multi-instrument adapters If instruments need to be exchanged, long-term operations planning will be needed to ensure that all instruments receive the share of time needed (parallel with current situation UT vs. VLTI), determining the planning for transportation of instruments to/from the Nasmyth platforms

Scheduling and AO modes The choice of the most suitable programs will be more complex (and will need more aids) than at the VLT “Given the current turbulence profile (and its evolution over the next hours!), what is the right AO mode to use?” Statistical expectations on the turbulence profile (not just seeing statistics) should become an input of the long- term scheduling

Observing modes Proper exploitation of AO modes requires flexibility in short-term scheduling: rationale for most (all?) available time to be scheduled in service mode. Rationale for programmes in which real-time decisions are needed must be established: Will some programmes require real-time decisions? Will Visitor Mode be justified? Flexibility is required, even in programmes requiring real-time decisions: Possibility to implement hybrid modes combining flexible scheduling with real-time reaction capabilities: for instance, several remotely located observers on-call Effectiveness of flexible remote observing strongly depends on weather forecasting capabilities on a timescale of hours

Tool requirements Scientific performance assessment will need realistic simulation tools with which the user must be able to predict the system output as a function of atmosphere parameters –and specify the relevant constraints Observation preparation tools will need to provide all relevant constraints under which a given observation can be carried out. Observation selection and scheduling tools will need to incorporate atmosphere turbulence assessment and forecast capabilities, relevant to each AO mode.

Ramping up Most E-ELT operations concepts and tools can be developed and tested at the VLT (e.g. “P100 project”) This includes incorporation of atmosphere forecasting tools Planning for E-ELT operations is not about “How would we operate the E-ELT if we had it today?”, but “How will be operate a major ground-based optical facility in ten years from now?”

ESO : 50 years operating leading observatories