Commissioning of the ECAL A-side Irina Machikhiliyan, 12.03.2009 Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
MPPC update including plastic connector T2K experiment collaboration meeting 2007/4/18 (Wed) S.Gomi T.Nakaya M.Yokoyama ( Kyoto University ) T.Nakadaira.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
ECAL status and plans  Current status and problems  Recent activities:  C-W noise studies summary;  Lab measurements of LED Monitoring system performance;
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Pre-calibration of PM gain by photo-statistics
Monitoring system commissioning
2009: restart the system: few observations. Hw maintenance week:
The Standard Analysis chain
E. Garutti - Main Meeting
Presentation transcript:

Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED trigger rate 56 Hz, C-side is also included (taken ) #45396 PM HV nominal, LED LV nominal, ~34K of events, LED trigger rate 2 Hz, 5 TAE events, A-side only (almost 5 hours stability run, taken ) On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev

Irina Machikhiliyan, Test program: -Check of the functionality of PMs / LEDs: several cables were not plugged, fixed; few PM/LED power distribution cables are repaired; -Connectivity test (swapped cables): some swapped control / signal cabling in the Inner section, both PM and FEB sides, fixed; -Pulser test to check connectors quality: 9 connectors on signal cables on PM side, repaired or replaced; -Update / check of connectivity in Database; -~5 hours stability measurements; -Adjustment of integrators: were adjusted 11 of March, but 12 March it was found that pedestal values for two of them drifted. The experience from both C and A-sides shows that current system is not very stable and its adjustment is painful and time-consuming. The general feeling of the group is that it will be worth to modify the circuitry to achieve better performance. Pavel kindly agreed to take care of it. For a moment we have a prototype ready – to be checked on detector. Remaining problems / tasks:  Cells O 58/28(21/08/18) and O 35/46 (19/12/03) – problem on FEB side;  Couple of cells showed instability: to be watched further to understand the reason;  One RJ-45 cable with connector of poor quality (fire signal distribution for LED A310.4), to be repaired (not urgent, LED is now operational) For a moment:  LED intensities are not optimally adjusted. It does not make sense to do it now: they will be tuned after the calibration of PM gains will be done;  PIN system functionality is not yet checked. To be done (data are collected, to be analyzed); Commissioning of the ECAL A-side

Irina Machikhiliyan, r.m.s. of pedestal distribution  “Wide” pedestals: Most of the cells (12) belong to FEB 15 (crate 19)  “Narrow” pedestals: all from FEB 13 (crate 15) ECAL A-side, performance-I (pedestal rms)

Irina Machikhiliyan, ECAL A-side, performance-II (LEDs) Response on LED, nominal settings(1d) (!) 13 cells: amplitude is below 150 counts (!) (among them ~ 6 cells with damaged optical fibers) Response on LED, nominal settings (2d) All three optical bundles, which were replaced – work well!

Irina Machikhiliyan, ECAL A-side, performance-III (stability) Relative signal deviation, first hour excluded (stabilization) 99% of cells are stable within 1% Relative signal deviation, all 4.7 hours of data taking 83% of cells are stable within 1% 95% of cells are stable within 2% several cells with small / absent signal are excluded, few of them were finally repaired

Irina Machikhiliyan, ECAL C-side: ? time-alignment problem ? It seems that some C-side LEDs are even beyond the TAE sequence and therefore they are missing Upd: 23 March: According to Anatoly, there was a problem with LEDTSB recipes after power cut. Should be solved by now. LED response, Prev2LED response, Prev1LED response, T0 LED response, Next1LED response, Next2