STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP5 Assembly and optimization of complete cell Iratxe de Meatza CEGASA STABLE kick-off meeting.

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
WP4 Organic crystal deposition Mojca Jazbinsek Rainbow Photonics AG SOFI meeting Karlsruhe
STABLE Description WP3 LEITAT– January,2013 Synthesis and optimization of electrolyte of Li-air cells David Amantia Christophe Aucher LEITAT STABLE WP3.
Silicon-Organic hybrid Fabrication platform for Integrated circuits Kick-off Meeting 01/08/2010 Partner Presentations - UKA.
Electrochemistry National Aeronautics and Space Administration Point of Contact: Tom Miller Phone:
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
WP 2: Gas Processing Unit 1 Strictly Confidential Workpackage 2: Gas Processing Unit KTI Review Meeting,
WP 3: Thermal System Strictly Confidential 1 Workpackage 3: Thermal System Project Meeting, May 11, 2006.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
1.4.1 Poverty Alleviation Project Management 1 POVERTY ALLEVIATION PROJECT MANAGEMENT UPA Package 1, Module 4.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
ECOOP Consensus Meeting, Erdemli, March 2005 ECOOP WP13: Demonstration & Evaluation of ECOOP Monitoring Forecasting and Information System  Goals:  Demonstration.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 1 st REVIEW Brussels, 12th April 2013 FP7-ICT
The MAES pilot study on Natural Capital Accounting (NCA)
Developing an IS/IT Strategy
Elygrid Project Diego Embid Foundation for the Development of New Hydrogen Technologies in Aragon (Spain)
Thin Film & Battery Materials Lab. National Research Lab. Kangwon Nat’l Univ. Heon-Young Lee a, Seung-Joo Lee b, Sung-Man Lee a a Department of Advanced.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Welcome to Cologne 3 rd WP 5 Meeting May 26 th 2015.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 POLITO’s proposal for measurement standard cell STABLE project 1 st skype call November 22.
SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, s Scope of CC 6.1.
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
Taking stock and next steps CCWG F2F, 23 March 2015.
JOINT PROJECT of Belarus, Kazakhstan and the Russian Federation Facilitating the implementation and ratification of the protocols of the Convention on.
Please insert a figure in the master transparency. KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association.
AIMS Workshop Heidelberg, 9-11 March EURESCOM P616 ENHANCED ATM IMPLEMENTATION ISSUES OVERALL RESULTS Augusto Casaca Portugal Telecom.
INGAS “24 Months Meeting ”, “Brussels, Belgium”, “27-28 October 2010” INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels - Belgium 27 -
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
WP18: High-Speed Data Recording Krzysztof Wrona, European XFEL 07 October 2011 CRISP.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - Months 1-6 Colm O’Dwyer University College Cork (UCC) STABLE kick-off meeting Torino.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
How to Write a Grant Proposal Elana Dorfman Resource Development Consultant Shatil Empowerment Center for Social Change Organizations Founded by the New.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 LUREDERRA’s proposal of commercial compounds to be used as anode, cathode and electrolyte STABLE.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Synthesis and optimization of electrolyte of Li-air cells David Amantia Christophe Aucher LEITAT.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 6 Life cycle assessment 1 st 6 months Mats Zackrisson STABLE kick-off meeting Torino - October.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
Taking stock and next steps CCWG F2F, 23 March 2015.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
Analogous Behavior Concepts: Circuit theory, Translational Mechanics Equations: voltage (V) = current (i) x resistance (R) Force (f) = Velocity (v) x Damper.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP1 Synthesis and optimization of anode materials for Li-air battery Leticia Ciganda LUREDERRA.
Dr.F. Arteche EMC DEPFET Project: A general overview.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek.
Sustainability and economic impact
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
COmbining Probable TRAjectories — COPTRA
CSP 25th November 2010 Technical agreement number 3: overview
Vehicle Electrics Institute
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
EuCARD2 WP11 Topical Meeting
Electric Vehicles and the Environment (EVE IWG)
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
JINGYU SI Mechanical Engineering Department
Status of the INL High-Temperature Electrolysis Research Program
Cell Deployment Process
Catalyst coated membrane for zero-gap alkaline water electrolyzer
Test procedure development
Albania 2021 Population and Housing Census - Plans
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Metadata analysis.
Jella Kandziora, JUELICH Oslo, January 29th, 2019
The Future of Energy Storage and Associated Areas of Researches
Presentation transcript:

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP5 Assembly and optimization of complete cell Iratxe de Meatza CEGASA STABLE kick-off meeting Torino - October 25 th - 26 th, 2012 Description on 1 st year work

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Summary Overview o First-stage goals o Workplan o Tentative timeline

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Overview Start date: M6 (April 2013) Materials development from WP1,2,3 Integration & testing in full cell

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Summary oOverview First-stage goals oWorkplan oTentative timeline

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 First-stage goals  Design and assembly of complete cell: Identification of first candidate components from WP1-WP3 to propose cell designs  Characterization & Testing: Identification of testing protocols and characterization techniques available for development of testing program

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Summary oOverview o First-stage goals Workplan oTentative timeline

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan – overall target Milestone MS11 - Assembling of complete cells (M32) Cell assembly and test at lab-scale:  Expected specific capacity should be >2000 mAh/g  Life cycle = cycles

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan - tasks T5.1: Assembling obtained materials into a complete cell (M6-M32) CEGASA (14PM) T5.2: Analysis of the performance impact of different assembly techniques with different electrolytes (M6-M32) CEG (8PM) UCC (5PM) Development of full cell from coin-type to pouch-type Li-air concept cell operated in ambient conditions Transfer data/samples from - Candidate materials (substrates, electrolyte, membrane) - Preparation procedures of the lithium and catalytic air electrodes) Note: slurry development needs > 100g active material

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Workplan T5.3: Characterization and evaluation of the performance of the cells assembled (M6-M32) ELAPHE (22 PM), UCC (10PM), CEG (8PM) Define electrochemical testing program and parameters (current rates, DoD,…)  comparability of results for different cell types M6 with compilation of existing and proposed testing programs: - Applicable International Standards - Internal know-how of partners – Modelling inputs M6 first samples for: - Electrochemical testing (charge/discharge…) - In-situ mechanical & optical tests - Electrical connections, internal resistance - Post mortem surface morphology & phase identification (previous cycling needed)

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Summary oOverview o First-stage goals o Workplan Tentative timeline

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Tentative timeline 1 st year Proposal M6  Set-up exchange of data/samples with WP1, WP2 & WP3 for first candidate materials  Start compilation of existing testing protocols/parameters (take into account WP4 simulation/modelling needs)  Prepare list of techniques and equipment/resources brought into STABLE for electrochemical testing and advanced characterization  help in definition on testing program before M12  Identify requirements to focus development of full Li-air cell (inputs from Elaphe on different vehicle applications vs. materials development)

STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 Thank you for your attention