Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
2 Why fortify? 30-year-old pavement was cracking and crumbling because of a chemical reaction happening underneath the road, triggered by a substance.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Illinois state line to Madison Dane and Rock County
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Current Construction Projects Major Projects Pinellas County.
1 I-75 Reconstruction Welcome! Those wishing to make an official comment concerning any of the projects presented this evening.
Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Texas Transportation Commission Presentation Scott McLaughlin, CRRMA Chair October 25, 2012.
Brian Kary Minnesota Department of Transportation.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
91 Express Lanes Kirk Avila Treasurer/General Manager.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
The Mobility Authority Story: Building for our Future.
Regional Transportation Management Center Shared Operations Center – Mn/DOT Traffic Operations – Mn/DOT Maintenance Dispatch – State Patrol Dispatch 400.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Visit Our Website at: Click to edit Master title style.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
The I-465 West Leg Reconstruction Project
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
The Oakton Condominium Association September 12, 2017
Florida Transportation Commission FY 2009
STATE SUEE AND ONE WAY CORRIDORS
Presentation transcript:

Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12

 Rebuilding existing general purpose lanes  Improving/expanding frontage roads  Adding TEXpress lanes Project Overview

Improved mobility along the most congested corridors in Texas Road capacity nearly doubled  Reconstructed main lanes (free)  Expanded frontage roads  Four new managed toll lanes (two in each direction) Project Benefits Managed lane network to extend from North Dallas to downtown Fort Worth

2,100 workers along the corridor 160 companies 190+ DBE contract awards $1.299 billion spent on construction $1.5 million spent per day (avg.) Spurring new economic development throughout corridor Economic Impact New Outback Steakhouse in Hurst

Ordinary maintenance, cleaning and mowing Assistance to motorists in need Snow and ice removal Incident response Operations & Maintenance

PROGRESS Project is approximately 90% completed Roadway will open in late 2014 – six months ahead of schedule Opened new WB Grapevine Hwy. 26 on-ramp Re-opened EB Iron Horse on-ramp Re-opened WB Iron Horse off-ramp Re-opened EB off-ramp to Industrial Blvd. Final pavement placed along eastbound and westbound frontage roads Central Dr. to Murphy Dr./Westpark Way Segments 1 & 2 Airport Freeway & Loop 820 Beach Street Riverside Drive bridge

UPCOMING ACTIVITY Placing final layers of asphalt along main lanes and frontage roads NOTE: Traffic shifted to TEXpress lanes between Grapevine Hwy. 26 and Riverside Dr. in June Opening final configuration of Brown Trail Opening final configuration of Forest Ridge Dr. Opening new eastbound Brown Trail on-ramp Segments 1 & 2 Airport Freeway & Loop 820 Brown Trail SH 121/183 Split

FINAL CONFIGURATION This map can be found at Segments 1 & 2 Airport Freeway & Loop 820

I-35W Today

PROGRESS Official groundbreaking: May 1 Right-of-way acquisition underway Pre-construction work started Geotechnical surveys being completed Start heavy construction in 3Q 2014; complete in 2018 Existing main lanes, frontage roads, interchanges, bridges, ramps and overpasses will be reconstructed New TEXpress Lanes added in both directions Segment 3B construction underway Segment 3A I-35W – Downtown Fort Worth to I-820 interchange (6.5 miles)

Project Website: Information Hotline:1-888-NTE-2015 Follow us on Like us on Facebook:NorthTarrantExpress April is National Distracted Driving Awareness Month; please do not text and drive! Questions?