Report of Muon Veto Task Force L. Littenberg 9 June 06.

Slides:



Advertisements
Similar presentations
Plastic Scintillator Option for DB a simulation study by Maxim Gonchar, Yury Gornushkin and Dmitry Naumov JINR, Dubna, Russia Collaboration Meeting January.
Advertisements

Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
Activity for the Gerda-specific part Description of the Gerda setup including shielding (water tank, Cu tank, liquid Nitrogen), crystals array and kapton.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Prototype of the Daya Bay Neutrino Detector Wang Zhimin IHEP, Daya Bay.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
Another Conceptional Design of Veto Daya Bay Phone Meeting Changgen Yang 2006/03/01.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
A detector design for the Daya Bay reactor neutrino experiment Yifang Wang Institute of High Energy Physics, Beijing Jan. 18, 2004.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
LHCb VErtex LOcator & Displaced Vertex Trigger
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Muon/Special Detector Studies Update St. Malo Muon ID - Single muons, single pion rejection. TESLA TDR (M. Piccolo) 2. Muon ID events:  ID efficiency,
Measuring  a in the New experiment D. Hertzog / June 2004 n Plan that rates could be 7 x higher n Plan that new WFDs will have deep memory n Plan that.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
1 Work report ( ) Haoqi Lu IHEP Neutrino group
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
IFR Detector R&D status
Results with the RPC system of OPERA and perspectives
Roberto Calabrese Ferrara University and INFN
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Felix Sefkow DESY LDC at Vienna November 17, 2005
New idea for the target detector: SuperFGD
The Beam Test at Fermilab:
GLAST LAT tracker signal simulation and trigger timing study
Prototype activities update
Vertex Detector Mechanical R&D Design Questions and Issues
CLAS12 Forward Detector Element PCAL
Planar Edgeless Silicon Detectors for the TOTEM Experiment
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
Scintillator HCAL: LOI issues
Presentation transcript:

Report of Muon Veto Task Force L. Littenberg 9 June 06

Muon veto task force Set up at Feb 06 collaboration meeting Kwong Lau, LL, Changgen Yang Communication via & SKYPE Previous report in 7/8March Conf Call

List of Requirements Cost Efficiency Other interactions with the water Cerenkov Physical configuration Calibration scheme Access to central detectors Robustness Mean time between failures Environmental interactions Maintenance Stability of response Uniformity of response Threshold for muons Rate from ambient radiation at threshold Noise rate at threshold Accidental veto fraction Time resolution Pulse shape

Requirements - 1 Cost –Scint. option is $3.8M in db_cost_3.xls, what’s the limit? Efficiency –At least three different statements in the proposal V3.2. –We’ll take goal of 99.5% for H 2 O + tracker If H 2 O 95% efficient, tracker must be 90% efficient, etc. Other interactions with H 2 O veto –Could add veto when  -tracker and H 2 O both have activity below normal thresholds. Would make determining efficiency harder –Could try to handle stopped  by vetoing on 1  -counter + H 2 O

Requirements - 2 Physical configuration –Feedback situation Calibration scheme –Can exert constraints on veto system Access to central detectors –Need to go in to maintain or move –Top (or side) needs to be open-able If can’t move as 1 piece, some elements must be movable Robustness –Can’t be too fragile to deploy, move to open, take pressure Mean Time Between Failures –Part of robustness, also related to maintenance –Sample calc for tracker: Want >95% efficiency, have 600 elements, can’t fix for 3 years Can stand average of 30 dead elements ~ 20/year Translates into MTBF of 30 years for single element If never want <95%, MTBF must be 60 years for single element If can get in once/year, MTBF goes to 10 (20) years

Requirements - 3 Environmental interactions –Leakage (H 2 O in, LS out) (for scintillators) - probably OK –PMTs in water (for scintillators) - same problem for WC –Sensitivity to temperature, humidity (for RPCs) –Could RPCs be encapsulated & placed in water? Maintenance –Continuous, such as gas supply for RPCs –Sporadic, such as fixing or replacing elements Stability of response –Must be monitored at least –Quantities not in trigger infrequently corrected –Timing an issue unless we have transient recorders Uniformity of response –For long scintillators need to hear from both ends for timing, possibly position (for single layer) –Must be monitored to keep track of efficiency

Requirements - 4 Threshold for muons –Degree to which signal can be distinguished from noise, radioactivity E.g. scint 4cm thick so muon drops 8MeV, & response is 4p.e./MeV Then if radioactivity < 2.5 MeV, game is to distinguish 32 from 10 p.e. If all guassian, 17.5p.e. would give 98% efficiency & reject >98% bkgnd But response a function of position! Rate from ambient radiation at threshold –Depends on intrinsic radiation at site as well as technology of veto Noise rate at threshold –Function of the technology, temperature, etc. Accidental veto fraction –Calculable from rates & resolution –Bottom-line quantity on which requirement imposed What is goal? What is acceptable? 1%? 1.5%? Need separate goal for precision of determining this quantity. –Can be different for near and far halls!

Requirements - 5 Spatial resolution –16cm mentioned, but not somewhat soft –Depends on details of possible systematic checks E.g. want to force  ’s through Gd-doped region Time resolution –Driven by requirement that two muon counters (& 2 ends) in coincidence Coincidence between veto and signal can’t be tight (-400 to 100  sec) –10ns ansatz Pulse shape –I.e. double pulse resolution –Issue is confounding of muon coincidence by an early random –Transient recorders would solve –High threshold also would solve

With no agreed-on configuration… Still many active options for configuration –Classic water pool (see Changgen’s talk) –Aquarium (figure in P5 talk) –Shipping container option Pipe variation (M. Diwan) –Hybrid solid/water shield (see next slide) –etc. Can take a couple of paths -- –Explore (& cost) technology options 0th level costs of proposed options R&D on option Develop an existence-proof (strawman option) –Examine back-pressure veto design exerts on possible configurations (see Changgen’s talk)

Hybrid shield - Kwong Lau ~30m

Strawman Activities Define configuration - 15m  15m  9m far hall pool, 15m  9m  9m near halls, 6 sides, 2 layers (x & y), pmts for active water shield looking inward Define counters - 1  10  750cm (mainly) extruded polystryrene scintillator read out by 2 1mm wls fibers on each end. Fibers multiplexed 8:1 into M4 pmts, differently on the two ends for unique ID Determine cost - a continuing, iterative process (initial cut ~$4M) Design support system - Initial mechanical design under way (by BNL Magnet Division M.E. Kuo-Chen Wu) Test prototypes - several 7m MINOS prototypes from FNAL on order - will vary readout scheme Simulate counters to guide design (get feedback) Object - demonstrate a technically viable system at affordable cost

Cost for scintillator strip option Counters (6800) - $1.39M PMTs (425 M4) - $0.42M Electronics (1700 ch) - $0.43M Packaging & support str. - $1.35M Shipping & installation - $0.38M Total - $3.97M

Scintillator Strip Simulation N. Tagg (in charge of MINOS counter simulation) now joined 1st job - can we understand performance of extant counters?: MINOS OPERA

Cost of LS version 5cm 50cm Liquid $2.5/l) - $0.32M Liquid handling, filling, etc. - $0.35M Modules (inc. wls fibers, etc., 696) - $0.83M PMTs, bases, cables (EMI-9913B) - $0.98M Electronics - $0.35M Support, etc. - $1.15M Shipping & installation - $0.55M Total - $4.53M Notes: no multiplexing, BNL labor rates

RPC R&D in the US Houston, Illinois, UCLA Performance validation of full-size prototype –Signal integrity –Stability –Uniformity –Sensitivity to gas mixtures –Shielding issues

Activities in China Tests of 3-layer RPC setup –Evaluated 2 of 3 selection Simulation work on 10m-long water Cerenkov tank (see talk on this subject) Preliminary mechanical engineering design work on mechanism for moving the top detectors in water pool scheme Design work on water Cerenkov tank in water pool scheme.

Summary We’ve been refining the requirements Developing strawman plastic scintillator system for technical and cost assessment –Prototype studies –MC –Engineering Would like to do something similar with LS –Need more manpower US R&D on RPCs scheduled Work in China on RPCs & configurations Next goal: better integrate collaboration-wide effort Must get input for hall design & get ready for CD1!