Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.

Slides:



Advertisements
Similar presentations
Risk Management and the Contractor’s Property Management System
Advertisements

1 Acceptable Levels of Safety Severity Classification Likelihood Classification Risk Classification Scheme Safety Objective Classification Scheme Regulations.
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
1 Safety Assessment July SAFETY ASSESSMENT A Safety Assessment is essentially a process for finding answers to three fundamental questions: What.
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Session No. 2 Introduction to Safety Management. The First Ultra-Safe Industrial System Ultra-safe system (mid 1990s onwards) Business management approach.
Risk Management Introduction Risk Management Fundamentals
Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
TMS-RA04-A-01-02Page 1 of 20 The Risk Assessment Process.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
International Civil Aviation Organization European and North Atlantic Office CHALLENGES AND BENEFITS IN SAFETY MANAGEMENT Baku, Azerbaijan, 5-7 April 2006.
Developing of Dammitta Port and the Role of Integrated Simulator Complex Capt. Aly A.Elsayed Marine Simulators Systems Arab Academy For Science, Technology.
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
© 2000 International Risk Control America, Inc. Risk Management Presentation — 1 International Risk Control America IRCA
Risk Assessment and Management Katie Matthews GEOG 350 November 8, 2007.
Unit 6 – Risk Management and safety management system
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
The Australian/New Zealand Standard on Risk Management
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Assessment. 1. Health and Safety at Work Law states which of the following: 1.You have a right to a safe workplace 2.Your employer must keep you safe.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 DEFINITIONS.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
Safety and Loss Control
OH&S Management System
PHILOSOPHY OF ACCIDENT PREVENTION
Hazard Identification
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
Tom Cecich, CSP, CIH NC Chapter ASSE March 12, 2015.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
George Firican ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Health and Safety Dynamic Risk Assessment Aim To inform the students of the need for and the importance of a risk assessment.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
Welcome.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Liability Issues for TRIO Programs Managing Your Project’s Risk.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Rules for Supporting Part 803 and Part 806 Decision Making Page 1 Establishing Rules for: Medical Device Reports (803) & Correction and Removal Reports.
Risk Estimation Two distinct categories of Risies Voluntary Risks e.g. driving or riding in an automobile, and working in an industrial facility. Involuntary.
The Risk Management Process
David Wyatt CEng MRAeS Head of Airworthiness (DOA) CAA / Industry Part145 Airworthiness Seminar 28 th October 2015 Safety Management System (SMS): POA/DOA.
TUI GROUP | RSC | Martin Ring | November 2015 Compliance vs Performance based risk management Martin Ring Head of Risk, Safety and Compliance.
Ensuring the Safety of Future Developments
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS SAFETY PERFORMANCE.
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
Principles of risk assessment Risk assessment training course Module 1 Principles of risk assessment.
Chapter 13 Risk Management. Chapter Objectives 1.Define risk and risk management 2.Outline key risk issues and types of risk 3.Identify concrete methods.
IIPP An Overview of the Injury and Illness Prevention Program.
RISK & ITS MANAGEMENT. Risk A crisis situation involves : - a threat to resource & people, - a loss of control, - visible and / or invisible effects on.
LECTURE 7 AVIATION SAFETY & SECURITY
Trade Union Training on the Validation of the training manual entitled “Union Training on Occupational Safety and Health” Risk Assessment.
Safety Management Systems Session Two Safety Risk Management APTA Webinar April 28, 2016.
International Civil Aviation Organization European and North Atlantic Office ICAO FPL2012 WORKSHOP 29 June – 1 July 2010 Kiev, Ukraine Risk assessment.
Train When it Rains: Risk Assessment. What is Risk Assessment? Risk assessment is the process of recognizing possible harm from exposures which could.
Campus Wide Safety Committee Initial Meeting 11/9/16
An Overview on Risk Management
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY
DEFINITIONS.
OH&S Management System
Quality Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
HSE Case: Risk Based Approach.
Aerodrome Certification Workshop
Presentation transcript:

Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY

2 Almaty, 5 – 9 September 2005 SUMMARY  WHY THE SCIENCE OF SAFETY MANAGEMENT?  TERMINOLOGY  COSTS (ACCIDENTS, INCIDENTS, SAFETY)  RISK CLASSIFICATION & ANALYSIS  RISK MANAGEMENT  QUESTIONS

3 Almaty, 5 – 9 September 2005 WHY USE THE SCIENCE OF SAFETY MANAGEMENT?  People often overreact to perceived risk: Train crash in the UK – 5 die  Within one month, more death on car accidents then in trains for 30 years! In risk management one must not transfer risk from one area to another!

4 Almaty, 5 – 9 September 2005 TERMINOLOGY  HAZARD  RISK  MITIGATION  RISK MANAGEMENT

5 Almaty, 5 – 9 September 2005 TERMINOLOGY - HAZARD  Hazard - a scenario which, if it occurs, can have negative consequences to personnel, material (or the environment)  Hazard - an event that has the potential to result in damage or injury.

6 Almaty, 5 – 9 September 2005 TERMINOLOGY - RISK  Risk: a hazard, chance of or of bad consequences, loss or injury, exposure to mischance … (source: the Oxford dictionary)  Risk is two-dimensional:  Likelihood of an occurrence (probability)  Severity of consequences “The degree of risk is based on the likelihood that damage or harm will result from the hazard and the severity of the consequences.” RISK = probability consequences

7 Almaty, 5 – 9 September 2005 TERMINOLOGY - MITIGATION Mitigation is the action taken to lessen the severity, violence or effect of a change.

8 Almaty, 5 – 9 September 2005 TERMINOLOGY – RISK MANAGEMENT Risk management: the identification, analysis and elimination (and/or mitigation to an acceptable level) of those hazards, as well as the subsequent risks that threaten the viability of an organisation Risk management serves to focus safety efforts on those hazards posing the greatest risks.

9 Almaty, 5 – 9 September 2005 BALANCING RISK Risks can be balanced using cost-benefit methodology Risk Unacceptable region Acceptable region Tolerable region (ALARP as low as reasonably practicable) Negligible Risk Risk cannot be justified except in extraordinary circumstances Tolerable only if risk reduction is impracticable or if its cost is grossly disproportionate to the improvement gained Tolerable if cost of risk reduction would exceed the improvement gained necessary to maintain assurance that risk remains at this level risk “limit” risk “target” Costs

10 Almaty, 5 – 9 September 2005 COST OF ACCIDENTS  Direct costs (related to physical damage)  Indirect costs:  Loss of business;  Loss of use of equipment  Loss of staff productivity;  Investigation and clean-up;  Insurance deductibles;  Legal actions and damage claims;  Industry and social costs

11 Almaty, 5 – 9 September 2005 COST OF INCIDENTS  Flight delays and cancellations;  Alternate passenger transportation, accommodation, complains;  Crew change and positioning;  Loss of revenue and reputation;  Aircraft recovery, repair etc. and  Incident investigation.

12 Almaty, 5 – 9 September 2005 COST OF ACCIDENT PREVENTION  Difficult to quantify;  SMS implementation cost-benefit analysis – complicated but should be done;  Requires senior management involvement. If you think safety is expensive, try an accident!

13 Almaty, 5 – 9 September 2005 COST OF SAFETY Total Costs Risk Reduction Losses Protection Costs

14 Almaty, 5 – 9 September 2005 TERMINOLOGY – RISK MANAGEMENT Risk management: the identification, analysis and elimination (and/or mitigation to an acceptable level) of those hazards, as well as the subsequent risks that threaten the viability of an organisation Risk management serves to focus safety efforts on those hazards posing the greatest risks.

15 Almaty, 5 – 9 September 2005 ORGANISATIONAL ACCIDENT STAGES DANGERHazards Losses Unsafe acts Local workplace factors Organisational factors Causes Investigation Latent condition pathway Defences Event System Stages in the development and investigation of an organisational accident

16 Almaty, 5 – 9 September 2005 RISK MANAGEMENT PROCESS Identify the hazards to equipment, property, personnel or the organisation Evaluate the seriousness of the consequences of the hazard occurring What are the chances of it happening? Is the consequent risk acceptable and within the organisation’s safety performance criteria? YES Accept the risk NO Take action to reduce the risk to acceptable level HAZARD IDENTIFICATION RISK ASSESSMENT Severity/Criticality RISK ASSESSMENT Probability of occurrence RISK ASSESSMENT Acceptability RISK MITIGATION

17 Almaty, 5 – 9 September 2005 HAZARD IDENTIFICATION  Design factors;  Procedures and operating practices;  Communications;  Personnel factors;  Organisational factors;  Work environment factors;  Regulatory oversight factors;  Defences.

18 Almaty, 5 – 9 September 2005 FUNCTIONAL HAZARD ASSESSMENT Functional Hazard Assessment (FHA):  determine how safe the system shall be! Reminder! … a system consists of:  People (humans, liveware: L);  Equipment (hardware: H);  Procedures (software: S) and  Environment (E).

19 Almaty, 5 – 9 September 2005 THE FHA PROCESS

20 Almaty, 5 – 9 September 2005 RISK ASSESSMENT Risk is the assessed potential for adverse consequences resulting from a hazard!  THREE CONSIDERATIONS INVOLVED:  Probability  Severity  Rate of exposure

21 Almaty, 5 – 9 September 2005 RISK CLASSIFICATIONS & ANALYSIS The assessment of severity of the consequences always involves:  some degree of subjective judgment;  the use of structured grouped discussions:  guided by a standard risk classification scheme, and  using participants with extensive experience in their respective fields.  and …. should ensure that the outcome will be an informed judgment.

22 Almaty, 5 – 9 September 2005 STANDARD RISK CLASSIFICATION Likelihood of event per operational hour per sector/unit Severity Category QualitativeQuantitative Cat 1Cat 2Cat 3Cat 4 Frequent P s > Low Serious Probable > P s > Low MediumHigh Occasional > P s > Low SeriousHigh Remote > P s > LowMediumHigh Improbable > P s > MediumSeriousHigh Extremely improbable P s > SeriousHigh

23 Almaty, 5 – 9 September 2005 RISK MITIGATION There is no such thing as absolute safety! Risk has to be managed to a level “as low as reasonably practicable” (ALARP)

24 Almaty, 5 – 9 September 2005 “AS LOW AS REASONABLY PRACTICABLE” Risk Unacceptable region Acceptable region Tolerable region (ALARP as low as reasonably practicable) Negligible Risk Risk cannot be justified except in extraordinary circumstances Tolerable only if risk reduction is impracticable or if its cost is grossly disproportionate to the improvement gained Tolerable if cost of risk reduction would exceed the improvement gained necessary to maintain assurance that risk remains at this level risk “limit” risk “target” Costs

25 Almaty, 5 – 9 September 2005 RISK MITIGATION STRATEGIES  Exposure avoidance (if risk exceeds benefits);  Loss reduction (reduce frequency of unsafe events);  Segregation of exposure (separation or duplication):  Isolate the effects of the risk;  Build in redundancy.

26 Almaty, 5 – 9 September 2005 RISK MANAGEMENT – STATE LEVEL  Policy;  Regulatory change;  Priority Setting;  Operational Management;  Operational Inspections.

27 Almaty, 5 – 9 September 2005 RISK MANAGEMENT – BENEFITS  Avoiding costly mistakes;  Ensuring all aspects of the risk are identified;  Ensuring the legitimate interests of affected stakeholders are considered;  Providing decision-makers with solid defence;  Making decisions easier to explain;  Providing significant savings (time and money).

28 Almaty, 5 – 9 September 2005 QUESTIONS, COMMENTS ?

Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS - END -