Scintillator Tiles and Test Beam Plans Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.

Slides:



Advertisements
Similar presentations
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Advertisements

1 Construction of the hadronic calorimeter prototype for ILC (CALICE collaboration) or experience with Geiger mode operating multipixel photodiodes (SiPM)
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Calibration issues for the CALICE 1m 3 AHCAL LCWS11 - International Workshop on Future Linear Colliders Granada, Spain 2011/9/28 Jaroslav Zalesak Institute.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Time development of showers in a Tungsten-HCAL Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.
Status of scintillator KLM study P. Pakhlov (ITEP)
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
First Results from T3B Calice AHCAL Meeting – Desy, January 2011 Christian Soldner Max-Planck-Institute for Physics.
SiPM: Development and Applications
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
28 June 2007G. Pauletta: ALCPG Tests of IRST SiPMs G. Pauletta Univ. & I.N.F.N. Udine Outline 1.IRST SiPMs : baseline characteristics 2.first application.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Analysis of LumiCal data from the 2010 testbeam
Scintillation Detectors in High Energy Physics
Test Beam Request for the Semi-Digital Hadronic Calorimeter
AHCAL Beam Interface (BIF)
Calice collaboration meeting– March 5th 2012 – Shinshu, Japan
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
ScECAL+AHCAL+TCMT Combined Beam FNAL
X. Zhu1, 3, Z. Deng1, 3, A. Lan2, X. Sun2, Y. Liu1, 3, Y. Shao2
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Development of hybrid photomultiplier for Hyper-Kamiokande
Scintillator HCal Prototype
August 19th 2013 Alexandre Camsonne
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

Scintillator Tiles and Test Beam Plans Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics

Outline Aims of T3B (Tungsten Timing Test Beam) Scintillator Tile Development The Test Beam Setup(s) First Muon Data from CERN Installation Summary Aims of T3B (Tungsten Timing Test Beam) Scintillator Tile Development The Test Beam Setup(s) First Muon Data from CERN Installation Summary Casablanca, Christian Soldner 1

AIMS OF T3B Casablanca, Christian Soldner 2

Recap: Aims of the T3B Experiment Information about the time structure of hadronic showers in Tungsten is crucial for the development of a CLIC HCAL – The observed Time Structure depends on the active medium (sensitivity to neutrons)  Need scintillators to evaluate an analog HCAL – Directly coupled scintillator tiles, read out with fast digitizers can be used for detailed measurements of the time structure of the shower Casablanca, Christian Soldner 3 – Construct one timing layer = one strip of tiles – Run together with the CALICE AHCAL at CERN PS in November – Match T3B Events to CALICE Events to obtain the shower start Obtain first information on the timing of the lateral and longitudinal shower profile

SCINTILLATOR TILE DEVELOPMENT Casablanca, Christian Soldner 4

The Core: Scintillator Tile Design Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles CALICE - Mephi Pulsar - Embed WLS T3B - MPPC - Direct coupling

The Core: Scintillator Tile Design Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles CALICE - Mephi Pulsar - Embed WLS T3B - MPPC - Direct coupling Result from the Test Bench: -Irradiation with Sr90 ( -Decay) -Lateral Scan over Tile MPPC-25

The Core: Scintillator Tile Design 7 Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles Direct Coupling Avoid cost and time consuming procedure of WLS embedding and SiPM alignment  Couple photomultiplier directly to the scintillator tile  Possible through development of blue sensitive SiPMs  Needs: Modification of tile geometry to obtain uniform response to penetrating particles CALICE - Mephi Pulsar - Embed WLS T3B - MPPC - Direct coupling WLS Measurement: Reduced signal amplitude. Sensitivity of MPPC not matched to fiber emission. See NIMA51488 for Details MPPC-25

The Core: Scintillator Tile Design 8 Direct Coupling WLS adds additional delay to the photon signal (excitation process) Improve the timing of the intrinsic signal through direct coupling Direct Coupling WLS adds additional delay to the photon signal (excitation process) Improve the timing of the intrinsic signal through direct coupling CALICE - Mephi Pulsar - Embed WLS T3B - MPPC-50C - Direct coupling Result from the Test Bench: - Irradiation with Sr90 ( -Decay) - Record and average the signal of 500 penetrating electrons -Signal faster and faster peaking (!)  Important to determine the ToFH accurately

THE TEST BEAM SETUP(S) Casablanca, Christian Soldner 9

The Test Beam Setup of T3B Casablanca, Christian Soldner 10 One layer = row of 14 scintillator tiles Tile size: 3 x 3 x 0.5 cm 3 SiPM: Hamamatsu MPPC-50C Readout: 4 x PicoScope 6403 Fast Digitizer (1.25GSa/s on 4CH) Deep memory (1GSa) Fast data capturing (up to 1MHz)

T3B Test Installation at CERN Casablanca, Christian Soldner 11 Power distribution: HV for SiPMs (~73V), LV for preamps ( More sophisticated installation foreseen) Special setup: Muon Telescope, not used in November Power supplies: SiPM HV, Preamp LV in addition: DVM, not mandatory for November PicoScopes: The heart of the DAQ DAQ Computer, Screen not mandatory in November

Trigger Synchronisation T3B Timing Layer is positioned behind 30 Tungsten and AHCAL Layers Crucial: Correlate events in T3B with events in the W Stack  Determine the position of the timing layer relative to the shower start Match events by ensuring T3B records all CALICE triggers (spill by spill) (CALICE trigger rate: ~1-2kHz  maximum T3B trigger rate: ~1MHz) Identify CALICE timeout or calibration (fake) triggers: T3B Data:Record beam trigger signal on one T3B input channel to directly CALICE Data: Time stamp information of each CALICE event in final LCIO Enclosing Spill signal:  ~780ms  PS2203 triggers T3B readout and data transfer Triggers from CALICE backplane:  ~70ns  Used as external trigger for T3B data capturing

Trigger Synchronisation T3B Timing Layer is positioned behind 30 Tungsten and AHCAL Layers Crucial: Correlate events in T3B with events in the W Stack  Determine the position of the timing layer relative to the shower start Match events by ensuring T3B records all CALICE triggers (spill by spill) (CALICE trigger rate: ~1-2kHz  maximum T3B trigger rate: ~1MHz) Identify CALICE timeout or calibration triggers: T3B Data:Record beam trigger signal on one T3B input channel to directly CALICE Data: Time stamp information of each CALICE event in final LCIO Enclosing Spill signal:  ~780ms  PS2203 triggers T3B readout and data transfer Triggers from CALICE backplane:  ~70ns  Used as external trigger for T3B data capturing Commissioning campaign at T7 September 6 – 10:  Successfully integrated CALICE trigger (taken from VME Backplane)  Proved synchronisation: Consistent number of events for T3B and CALICE (however no extended test possible)

T3B Calibration Casablanca, SiPM Gain Monitoring: Test Beam: Intermediate Noise Run Mode  Take ~250 Darkrate Events per Channel after each spill processing  ~3000 Events (≈ 6-12 Spills ≈ minutes) suffice for SiPM Gain extraction Gain Extraction with only 3000 Events possible

T3B Calibration 15 SiPM Gain Monitoring: Test Beam: Intermediate Noise Run Mode  Take ~250 Darkrate Events per Channel after each spill processing  ~3000 Events (≈ 6-12 Spills ≈ minutes) suffice for SiPM Gain extraction Gain Extraction with only 3000 Events possible Test Bench: Gain-Amplitude Correlation  Measure #p.e./MIP with Sr90 (note: e- ≠ MIP but correlation identical)  Steer through different Bias Voltages and Temperatures  Obtain:  Check consistency for different cells Perform a Signal Correction using SiPM Gain Data

FIRST DATA FROM CERN INSTALLATION Casablanca, Christian Soldner 16

First Results: Intrinsic T3B Timing 17 Test Arrangement A: 1 PicoScope - External Trigger Input of PS: CALICE Trigger - 1 Input Channel of PS: same CALICE Trigger  Histogram the timing of rising signal edge  RMS of edge timing distribution ≈ 400ps Intrinsic time jitter of T3B DAQ ≈ 400ps (Improvement through PicoScope trigger time offset possible) CALICE Trigger RMS 0.42 ns Test Arrangement B: 1 PicoScope - External Trigger Input of PS: CALICE Trigger - 1 Input Channel of PS: Beam Scintillator Trigger No additional jitter introduced by CALICE DAQ

First Results: The Muon Telescope 18 Main goal of test: Study timing and efficiency of scintillators Efficiency studies ongoing... Example Waveform of Muon Candidate Muon Candidates:  Perform pedestal substraction  select Muon signals by a threshold of 4p.e. above the baseline X 1 Channel Died (investigation ongoing) Spikes occurring occasionally on the rising edge of the signal  Manufacturer claims to solve this with next firmware update

First Results: The Muon Telescope Casablanca, Christian Soldner 19 Main goal of test: Study timing and efficiency of scintillators Efficiency studies ongoing... Define time window around triggered sample:  Histogram the waveform integral of tile 1,2,3  MPV typically at 26p.e. (as expected from bench tests) X 1 Channel Died (investigation ongoing)

First Results: MIP Signal Timing with Muon Telescope Casablanca, Christian Soldner 20 Test Arrangement C: 1 PicoScope  Standalone Run - Input Channel A,B,C of PS: Scintillator Tile 1 (front), 2 (middle), 3 (back) connected - Trigger condition: Signal coincidence between front and back  study middle  Edge Timing given by sample above threshold (more sophisticated methods possible) <> 0.07 RMS 1.16 Investigate relative MIP Edge timing: Time resolution:  T3B time resolution for MIPs: ~ 800 ps (simple threshold method, further improvement by respecting intrinsic resolution possible) Typical RMS Width:

First Results: Timing Strip Data Typical RMS width: ~1.6 ns 44_A59_D Test Arrangement D: Full Test Beam Setup - 4 PicoScopes - External Trigger Input of PS:CALICE Trigger using large 50x80cm Muon Beam Scintillators - 14 Input Channels of PS: 14 Scintillator tiles of the T3B Timing Layer  Edge Timing given by sample above threshold (more sophisticated methods possible) Now modified Time resolution:,where  Large trigger adds ~ 1.3 ns spread (not used in hadron Test Beam) (remember: All events are within 3 x 3 cm on the large trigger!)

Timing of Full T3B Setup Casablanca, Christian Soldner Osci: 1 PicoScope used in parallel for Muon Telescope  only 10 channels available Result: Stable behaviour on all channels: (1.6 ± 0.2)ns (further improvement in analysis possible)

SUMMARY Casablanca, Christian Soldner 23

Summary Casablanca, Christian Soldner 24 Valuable experience from T3B commissioning run Integration with CALICE Trigger proven, synchronisation works Hardware mostly working (one channel broken, might be a short due to packaging) Some oscillations observed on two of the four oscilloscopes, investigating Some Muons to look at to develop analysis tools, quantify system performance Open question: Spill structure for November test beam? T3B DAQ not optimized for two spills that follow quickly one after the other, need ~ 5s between spills at the moment Challenging: Constantly changing spill structure...

Special Thanks to: Frank Simon and Lars Weuste, whose commitment at CERN Commissioning and at Data Analysis The CALICE AHCAL Group, whose permanent support Make this experiment possible! Casablanca, Christian Soldner 25