Acceleration of Protons in FFAG with Non-Scaling Lattice and Linear Field Profile Alessandro G. Ruggiero Semi-Annual International 2006 FFAG Workshop November.

Slides:



Advertisements
Similar presentations
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Advertisements

EMMA Upgrade: Slow Acceleration with Low-Frequency Cavity J. Scott Berg Brookhaven National Laboratory 12 March 2010.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
PAMELA Contact Author: CONFORM is an RCUK-funded Basic Technology Programme PAMELA: Concepts Particle Accelerator for MEdicaL Applications K.Peach(JAI,
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Knoxville, TN, Jan , 2014 Lecture.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
FFAG Concepts and Studies David Neuffer Fermilab.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Y. Mori Kyoto/KEK FFAG C. OH FFAG: Fixed Field Alternating Gradient Strong focusing(AG focusing, phase focusing) Like synchrotron, but fixed field Moving.
Particle dynamics in electron FFAG Shinji Machida KEK FFAG04, October 13-16, 2004.
FFAG for next Light Source Alessandro G. Ruggiero Light Source Workshop January 24-26, 2007.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
ADSRs and FFAGs Roger Barlow. 7 Jan 2008Workshop on ADSRs and FFAGsSlide 2 The ADSR Accelerator Driven Subcritical Reactor Accelerator Protons ~1 GeV.
Novel Constant-Frequency Acceleration Technique for Nonscaling Muon FFAGs Shane Koscielniak, TRIUMF, October 2004 Classical scaling FFAGs (MURA) have geometrically.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
UK FFAG Plans Introduction to FFAGs Scaling vs non-scaling Non-scaling FFAGs Non-scaling POP Why the interest? UK plans.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
1 Muon Acceleration and FFAG Shinji Machida CCLRC/RAL/ASTeC NuFact06 Summer School August 20-21, 2006.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Muon Acceleration and FFAG Shinji Machida KEK NuFact05 Summer Institute June 12-20, 2005.
1 Muon Acceleration and FFAG II Shinji Machida CCLRC/RAL/ASTeC NuFact06 Summer School August 20-21, 2006.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
Synchronization Andrew Hutton Slava Derbenev Yuhong Zhang.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Muon acceleration - amplitude effects in non-scaling FFAG - Shinji Machida CCLRC/RAL/ASTeC 26 April, ffag/machida_ ppt.
Part I Optics. FFAG is “Fixed Field Alternating Gradient”. Ordinary synchrotron needs ramping magnets to keep the orbit radius constant. FFAG has Alternating.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
FFAG Accelerators for Radio-Isotopes Production Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
1 Tracking study of muon acceleration with FFAGs S. Machida RAL/ASTeC 6 December, ffag/machida_ ppt.
Professor Philip Burrows John Adams Institute for Accelerator Science Oxford University ACAS School for Accelerator Physics January 2014 Longitudinal Dynamics.
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Longitudinal Dynamics of Charged Particle
J-PARC main ring lattice An overview
Alternative/complementary Possibilities
Isochronous, FFAG Rings with Insertions for Rapid Muon or Electron Acceleration G H Rees, RAL.
PSB rf manipulations PSB cavities
FFAG Accelerator Proton Driver for Neutrino Factory
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Kicker and RF systems for Damping Rings
RF Parameters for New 2.2 km MEIC Design
Beam Synchronization in MEIC: The Problem, Scale and Prospect
Presentation transcript:

Acceleration of Protons in FFAG with Non-Scaling Lattice and Linear Field Profile Alessandro G. Ruggiero Semi-Annual International 2006 FFAG Workshop November , 2006 KURRI - Osaka - Japan

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory2/20 Acceleration of Protons in FFAG Accelerators with Non-Scaling Lattice and Linear Field Profile Few examples: (1) FFAG injector for AGS Upgrade AGS-FFAG (2) Low Energy Proton Driver (Neutron Source, Energy Production, Tritium Production, Nuclear Waste Transmutation, ….) MA-LE-PD (3) Neutrino Factory (and similar ….) AGS-FFAGMA-LE-PD Injection Energy400 MeV200 MeV  Extraction Energy1.5 GeV1.0 GeV  Circumference809 m202 m Repetition Rate2.5-5 Hz1 kHz

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory3/20 Acceleration by RF-Modulation A.G. Ruggiero “RF Acceleration with Harmonic-Number Jump”, BNL Internal Report, C-A/AP 237, May 2006 In the case of acceleration of Protons the particle velocity varies considerably. Conventional Method of acceleration considered so far is Frequency- Modulated RF system. FFAG accelerators have the good (excellent) property of constant bending and focusing field that does not impose any limit (in principle) to the acceleration rate. Unfortunately this is set by the rate of the RF Modulation. For lighter particles (electrons, muons, … ) this is not a problem because  = 1 at all times and the RF accelerating system can be taken with fixed frequency (typically superconducting)

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory4/20 Required RF Modulation AGS-FFAGMA-LE-PD Repetition Rate5 Hz1 kHz Acceleration Period7 ms0.5 ms RF frequency6 – 9 MHz (AGS)30 – 50 MHz Modulation Rate0.5 MHz/ms40 MHz/ms Fermilab Booster:30 – 50 MHz in 30 ms ->1 MHz/ms RF system is operating in heavy beam loading condition with large average/peak power

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory5/20 AGS-FFAG A.G. Ruggiero, “Feasibility Study of a 1.5-GeV Proton FFAG in the AGS Tunnel”, BNL Internal Report C-A/AP/157, June 2004 Acceleration in the AGS-FFAG Circumference m Harmonic Number, h24 Energy Gain 0.5 MeV / turn Transition Energy,  T i Peak RF Voltage1.2 MVolt Number of full Buckets22 out of 24 Total Number of Protons1.0 x Bunch Area, full0.4 eV-sec Protons / Bunch4.6 x Injection Period1.0 ms Acceleration Period7.0 ms Total Cycle Period8.0 ms RF Cavity System No. of RF Cavities30 No. of Gaps per Cavity1 Cavity Length1.0 m Internal Diameter10 cm Peak Voltage / Cavity40 kVolt Power Amplifier / Cavity250 kW Energy Range, MeV4001,500  Rev. Frequency, MHz Revolution Period, µ s RF Frequency, MHz Peak Current, Amp Peak Beam Power, MW

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory6/20 MA-LE-PD A.G. Ruggiero, “FFAG Accelerators for High-Intensity Proton Beams”, Proceedings ICFA-HB Bensheim, Germany -- October 18-22, 2004 Acceleration in the MA-LE-PD Circumference m Harmonic Number, h36 Energy Gain 1.2 MeV / turn Transition Energy,  T i Peak RF Voltage1.8 MVolt Number of full Buckets26 out of 36 Total Number of Protons0.94 x Bunch Area, full0.4 eV-sec Protons / Bunch3.6 x Injection Period0.5 ms Acceleration Period0.5 ms Total Cycle Period1.0 ms RF Cavity System for the MA-LE-PD No. of RF Cavities40 No. of Gaps per Cavity1 Cavity Length1.0 m Internal Diameter10 cm Peak Voltage / Cavity45 kVolt Power Amplifier / Cavity1.0 MW Energy Range, MeV2001,000  Rev. Frequency, MHz Revolution Period, µ s RF Frequency, MHz Peak Current, Amp Peak Beam Power, MW

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory7/20 Is there a way of RF acceleration that does not require Frequency Modulation of the RF cavity system? Turn after turn the path length is adjusted so that the beam crosses the accelerating RF system always on phase (cyclotron condition). This requires that the harmonic number changes (increases) also. The accelerating RF cavity system is at constant frequency (and voltage). RF One example is acceleration in a Cyclotron (a Microtron)

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory8/20 What can we do But the isochronous condition cannot be satisfied in a FFAG with Non- Scaling Lattice and Linear Field Profile for a low-energy proton beam. So what can we do? Leave the path length turn-after-turn as it is (there is a change, but it is small) and vary properly the transit time between cavity crossing. This is made easier when one operates at energies below the ring transition energy (with a surprise … ).  T/T=  C/C –  /  =(1/  T 2 – 1/  2 )  p/p  T >>  Vary properly the transit time between cavity crossing so that the RF cavity is always crossed in phase. This leads to the concept of HNJ (or HNH)

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory9/20 Harmonic Number Jump or Hopping A.G. Ruggiero, “RF Acceleration with Harmonic Number Jump”, BNL Internal Report C-A/AP/237, May 2006 A.G. Ruggiero, “rf acceleration with harmonic number jump”, Phys. Review Special Topics – Accelerators and Beams 9, (2006) h h –  h

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory10/20 Acceleration of Synchronous Particles A ssume the beam as a sequence of point-like bunches (synchronous, reference). T he energy gain is adjusted for a change in the travel period T n in the following arc so that the reference particle is pushed forward or back exactly by  h harmonics. T n = h n T RF T n-1 = h n-1 T RF h n – h n-1 = –  h  E n =  n 2  n 3 E 0  h / h n (1 –  pn  n 2 ) T he ring is made of N RF cavities equally spaced. E n = total energy T n = h n T RF  E n = (Q eV n / A) sin (  RF t n ) = (Q eV n / A) sin (  n )

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory11/20 Acceleration of Non-Synchronous Particles A ny other particlet n = t n +  n  E n = (Q eV n / A) sin (  RF t n )  n = E n – E n  n = (Q eV n / A) [ sin (  n +  RF  n ) – sin (  n ) ] ~ (Q eV n / A) (cos  n )  RF  n   n =  n –  n – 1 = – (1 –  pn  n 2 ) T n  n /  n 2  n 3 E 0 S mall-Amplitude Oscillations  2  n /  n 2 +  n 2  n = 0with  n 2 = 2 π   h / tg  n

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory12/20 T he Hamiltonian H =(Q eV n / A  RF ) [ cos (  n +  RF  n ) +  RF  n sin (  n ) ] + – (1 –  pn  n 2 ) T n  n 2 / (2  n 2  n 3 E 0 ) cos (  n +  1,2n ) + cos (  n ) + (  1,2n – π + 2  n ) sin (  n ) = 0 RF Buckets with Harmonic-Number Jump nnnn  RF  n 

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory13/20 RF Buckets with Harmonic-Number Jump B ucket Area B n = (8 /  w RF )[ 2 Qe V n b n 2 g n 3 E 0 / A  h n (1 – a pn g n 2 ) ] 1/2 I(  1n,  2n ) I(  1n,  2n ) = ∫[cos (  n +  ) +  sin (  n ) + G(  n )] 1/2 / 4  2 d  G(  n )= cos(  n ) – (π – 2  n ) sin (  n ) B ucket Height  2 = 2 Qe V n  n 2  n 3 E 0 F(  n ) / A  (1 –  pn  n 2 ) h n F(  n ) = cos(  n ) – (π/2 –  n ) sin (  n )

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory14/20 Consequences of Harmonic-Number Jump T o avoid beam losses, the number of bunches ought to be less than the harmonic number at all time. On the other end, because of the change of the revolution period, the number of RF buckets will vary. There is a difference between the case of acceleration below and above transition energy. Below transition energy the beam extension at injection ought to be shorter than the revolution period. That is, the number of injected bunches cannot be larger than the RF harmonic number at extraction. The situation is different when the beam is injected above the transition energy. In this case the revolution period decreases and the harmonic number increases during acceleration. Below TransitionAbove Transition

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory15/20 Energy Gain Programming E nergy gain at the n-th cavity  E n = eV n sin (  n ) = A  n 2  n 3 E 0  h / Q h n (1 –  pn  n 2 ) V n = n c g  n TTF(  0 /  n c ) TTF(x  1)= sin(πx/2) /(πx/2) g =  0 / 2  n = average axial field  E n (MeV/m) vs. no. of Cavity Crossings Example: First of three FFAG Rings of NuFact identical to AGS-FFAG  h = 1 Constant RF frequency of MHz with 2 diametrically opposite groups each of 8 equally-spaced, independently-phased, superconducting, single-gap cavities made of one single elliptically-shaped cell with gap g operating in half- wavelength mode. T a = 174 revolutions = 0.5 ms A. G. Ruggiero, “ FFAG Accelerator Proton Driver for Neutrino Factory ”, Nucl. Phys. B Proc. Suppl. 155, 315 (2006); BNL Report C-A/AP/219, 2005

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory16/20 Energy Gain Programming F our Programming Methods: 1. Constant RF Phase  n It requires the design of a RF Cavity with proper radial field profile 2. Constant average axial Field  n It requires a RF phase modulation 3. Modulation of the Harmonic Number Jump  h 4. Matching of the Acceleration period with the cavity Filling Time

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory17/20 Constant RF Phase Average Axial Field  n (MV/m) versus Radial Beam Position x (cm) with  n = 60 o The realization of such field profile across the radial aperture is problematic but not impossible. It could be made with ordinary pill-box cavities resonating in TM010 mode but displaced horizontally. A cavity that provides a longitudinal kick proportional to the radial displacement of the beam is the one operating in TM110 mode. Such cavity introduces also transverse deflecting modes that should be evaluated first and their impact to the beam compensated or at least reduced.

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory18/20 Constant Average Axial Field RF Phase  n (degrees) versus number n of Cavity Crossings T a = 174 revolutions  n = MVolt/m Phase changes less than 1 degree per crossing

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory19/20 Modulation of Harmonic Number Jump Average Axial Field  n (MV/m) vs. radial Beam Position x (cm) with  n = 60 o by varying the amount  h of the harmonic number jump during acceleration Below transition energy, the energy gain increases with the cube of the particle total energy, for constant harmonic number jump. If on the other side the latter is also programmed as  h ~  n -2  n -3, that is a large value at injection that then decreases to unit at top energy, it is possible to reduce the variation of the axial field along the radius of the orbit. When this method is applied to our example, we found that the required axial field is about unchanged, but the range of the change is considerably reduced to only a factor of two, instead of ten. This method is more useful above transition energy. The energy gain varies linearly with the total particle energy. It could be flattened by allowing the amount  h of the harmonic number jump also to decrease, but this time only linearly. T a = 63 revolutions

November 6-10, 2006A.G. Ruggiero -- Brookhaven National Laboratory20/20 Matching of Acceleration Period with the Cavity Filling Time It takes a finite amount of time to fill up with power the RF cavities T F =1.4 (Q 0 /  ) / (2 + P b / P w ) Typically T F is a fraction of a millisecond and it can be made, with a proper choice of parameters, to match in magnitude the time T a required for acceleration over the desired energy range. In our example the required energy gain is about an order of magnitude in the field variation over about half a millisecond. The beam could be injected just a little after RF power is poured in the cavities. As the beam is accelerated the cavities are filled with more power until they are topped at the end of the acceleration cycle. During the filling the axial field will increase correspondingly as required. This method sounds more feasible than it may be suggested here. Although the cavity time constant is both a tool and an impediment to tailoring the voltage profile versus time, all cavity-modulator systems are equipped with amplitude and phase loops, or full vector feedback, and so following a voltage program with high accuracy is eminently possible – even if it calls for changes which are faster than the cavity time constant, provided that they are modest and the required over-power is available.