Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
André Augustinus 16 June 2003 DCS Workshop Safety.
256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DSS Advisory Board Christoph Schäfer Rack Safety System.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Building Your LPFM Station Presented by John George.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
The LHC PC Rack Project Fred Wickens On behalf of the LHC PC-Rack Study Group 10th LECC Workshop Boston Sep 2004.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
, RACK POWER SUPPLY AND CONTROL as proposed by ST-EL. J. Pedersen, ST-EL Presentation,J.C.O.B.,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
COOLING LHC RACKS PROCUREMENT
Robert Gomez-Reino Garrido
Question & Suggestions March 17th
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ATLAS USA15 - Rack 52U with 9U crates, remote PS
TileCal ROD Commissioning Counting Room Installation
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Antiproton decelerator
LHCb VErtex LOcator ENGINEERING DEPARTMENT
Needed for Team A on -End
Presentation transcript:

Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004

10 October cp Rack Coordination 2 Aims To construct complete racks to represent the two types of installation ATLAS/CMS ALICE/LHCb Including A representative set of subracks Electrical distribution Cooling Control

10 October cp Rack Coordination 3 Purpose To allow studies to be made on: Rack control Georges Burdet, Joao Varela et al Subrack installation Cable management Cooling Particularly of “non-standard” installations

10 October cp Rack Coordination 4 Status Two racks are in place in 4-S-060 The ATLAS prototype rack Acquired from EST-LEA Equipped with Prototype electrical distribution box from TS-EL CANALIS installation Cooling Prototype turbine chassis with monitor board Control Rack monitor with smoke detector A rack borrowed from LHCb To be equipped Discussions with Vincent & Lennart

10 October cp Rack Coordination 5 Other equipment We have available Two 9U VME crates One with air-cooled PS One with remote water-cooled PS Two 6U VME crates One with air-cooled PS One with remote water-cooled PS 8 heat exchangers LHC-style

10 October cp Rack Coordination 6 Need Production power distribution chassis CMS rack (90cm)? ALICE rack?

10 October cp Rack Coordination 7 Questions Practical How to connect to ST-EL control Physically & logically