17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.

Slides:



Advertisements
Similar presentations
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut IceCube Workshops Oxford September 23rd, 2005.
Advertisements

Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
Track quality - impact on hardware of different strategies Paola FTK meeting Performances on WH and Bs   2.Now we use all the layers.
CIVIL RIGHTS DATA COLLECTION Workshop April 9, 2015 The Civil Rights Data Collection (CRDC) is a mandatory data collection of the U.S. Department of Education’s.
SVT L.Ristori1 SVT Workshop July 22, 2003 Summary (1) Minimal upgrade for run IIb silicon –Detailed bit level format for hits from HF’s to Mergers needs.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
SVT workshop October 27, 1998 XTF HB AM Stefano Belforte - INFN Pisa1 COMMON RULES ON OPERATION MODES RUN MODE: the board does what is needed to make SVT.
Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 1 Data Board l 2 production boards in testing on the 14th floor l Both boards are fully functional at.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
November 5, 1998Stefano Belforte - INFN Pisa1 SUMMARY FROM THE SVT WORKSHOP CDF Collaboration Meeting Stefano Belforte for the SVT group.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
TEST-1 6. Testing & Refactoring. TEST-2 How we create classes? We think about what a class must do We focus on its implementation We write fields We write.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
The Software Development Process
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Online Reconstruction 1M.Ellis - CM th October 2008.
SVT workshop October 28, 1998 Online software Stefano Belforte - INFN Pisa1 Online Software Issues Which tasks will be needed for SVT  Operation  Monitor.
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Can we tag on SVT at L2? Bill Ashmanskas, CDF TDSWG meeting, SVT has been producing fitted tracks since April Resolution has improved, fake.
General requirements for BES III offline & EF selection software Weidong Li.
SVT workshop October 27, 1998Stefano Belforte - INFN Pisa1 SVT Vertical Slice Test Goals Schedule Hardware to be tested Software  pre-existing  developed.
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut Zeuthen Collaboration Meeting.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
Level 1-2 Trigger Data Base development Current status and overview Myron Campbell, Alexei Varganov, Stephen Miller University of Michigan August 17, 2000.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
November 15, 2005M Jones1 Track Lists in Level 2 Outputs from SLAM provide lists of tracks faster than the current path to SVT and Level 2 via XTRP Sparsify.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
FTK high level simulation & the physics case The FTK simulation problem G. Volpi Laboratori Nazionali Frascati, CERN Associate FP07 MC Fellow.
FNAL Software School Day 4 Matt Herndon, University of Wisconsin – Madison.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
Advanced Higher Computing Science The Project. Introduction Worth 60% of the total marks for the course Must include: An appropriate interface using input.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
11/20/01Giovanni Punzi Items for restart of run Unify.gcon and.ifit (gcon V3.0 (fcon?)) –Got more comments/did some format changes –Code written to produce.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Advanced Higher Computing Science
Federico Lasagni Manghi - University of Bologna
CMS High Level Trigger Configuration Management
CLAS12 Commissioning with Cosmincs
DAQ for ATLAS SCT macro-assembly
Barrel RPC Conditions Database
Tracker Software Status
L1 simulation review Aug 2005 Jamie Boyd
The Road Warrior: first use of the Pulsar for SVT
Presentation transcript:

17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212 Track Fitters2212 Spy Controls488 XTFA11*1 XTFB11*2 XTFC006 Have all hardware needed for Commissioning run System complete by ~Nov 1st

17-Aug-00 L.RistoriCDF Trigger Workshop2 SVT: realistic assessment of functionality September 1 –Test data will be flowing from at least three FIBs, through one complete slice of SVT (starting with three HF), to L2 interface board, then SVTD bank, as part of daily DAQ integration test. –Data will have correct format, bunch ID will match, but neither raw data nor configuration data will necessarily be realistic. November 1 –Tracks found and fit using data from XTRP and from barrel 4, read out into SVTD and checked against trigger simulation. –Beam position feedback mechanism exercised, though answer not necessarily meaningful.

17-Aug-00 L.RistoriCDF Trigger Workshop3 SVT: status of algorithm software Tools exist for: –Generation of patterns for AM and constants for TF from given detector geometry –Generation of patterns for AM and constants for TF from data Not final yet Still need to tie a few loose ends –Documentation –Direct access to data in offline format –Interface to data base –Etc.

17-Aug-00 L.RistoriCDF Trigger Workshop4 SVT: status of Run Control software Most pieces exist but need to be better integrated. Configuration messages from R_C have been used to download boards used in vertical slice test. Currently nothing is in the hardware database. "Dumb" (i.e. big, redundant) file formats exist for memory contents; need to work on "smart" (compact) formats. Tentative plan is to use names of text files as database entries, to keep maximum simplicity and flexibility until we get some experience. Then implement real database tables once we've seen some data.

17-Aug-00 L.RistoriCDF Trigger Workshop5 SVT: status of TRIGSIM module A simulation module is in place and gives reasonable results. We expect the underlying C code to be used both for TRIGSIM and for online diagnostics in crate CPUs. More work is needed on common formats for configuration data to be used for simulation and R_C initialization. Lot of work still needed to turn it into a trigger validation tool.

17-Aug-00 L.RistoriCDF Trigger Workshop6 SVT: top 2 goals for the Commissioning Run 1.Tracks found and fit using data from XTRP and from barrel 4; read out into SVTD and checked against trigger simulation. 2.Beam position feedback mechanism exercised, though answer not necessarily meaningful.