Grid Reliability -- Needs of Nuclear Power Plants Joe McClelland, Director Division of Reliability Joint NRC/FERC Meeting April 24, 2006.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Confidential & Proprietary to Cooper Compliance Corporation Revised September 8, 2014 AUDiT-READY TM.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
COM Operating Personnel Communications Protocols
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
FPSC Safety, LLC ISO AUDIT.
WECC and NERC Protection Criteria and Standards
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Operational Communications and Coordination: Real World Experiences
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NEBOSH LEVEL 6 NATIONAL DIPLOMA MODULE A: MANAGEMENT OF HS LESSON 9 : CRIMINAL LAW Part One: HASAWA 1974.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Status Report for Critical Infrastructure Protection Advisory Group
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
April 8, 2011Page 1 April 8, 2011 The University of Texas Interdisciplinary Energy Conference Overcoming Barriers to Smart Grid & New Energy Services Panel.
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
PJM©2009 PJM Confidential DOCs # RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation Transmission Operator’s Perspective.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
Moving Forward Overview of the 2003 Blackout. Overview Power system restored within 30 hours Conservation efforts avoided rolling blackouts once power.
Office of Market Oversight & Investigations Comments by the speaker do not necessarily reflect those of the Commission Data Collection And Access At FERC.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
FERC’s Division of Reliability Federal Energy Regulatory Commission – Open Meeting Washington, DC October 6, 2004 Joseph H. McClelland Director, Division.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
NERC Lessons Learned Summary
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Regional Transmission Organizations
Phil O’Donnell, Manager Operations and Planning Audits
ECEN 460 Power System Operation and Control
Workshop Session 1: Overview
Workshop Session 1: Overview
Phil O’Donnell, Manager Operations and Planning Audits
Presentation transcript:

Grid Reliability -- Needs of Nuclear Power Plants Joe McClelland, Director Division of Reliability Joint NRC/FERC Meeting April 24, 2006

Nuclear Power Plant Requirements To ensure safety, the nuclear plant operator must know the status of the offsite power supply. To ensure safety, the nuclear plant operator must know the status of the offsite power supply. Contingencies on the Bulk Power System can affect the reliability of the offsite power supply. Contingencies on the Bulk Power System can affect the reliability of the offsite power supply.

Nuclear Power Plant Requirements (Cont.) Transmission Operators and Reliability Coordinators know the status of facilities that can affect offsite power. Transmission Operators and Reliability Coordinators know the status of facilities that can affect offsite power. The Commission permits the communication of operational parameters needed to maintain safety (Discussed under Part II – Interpretive Order). The Commission permits the communication of operational parameters needed to maintain safety (Discussed under Part II – Interpretive Order).

Resulting Issues of Nuclear Power Plants Are transmission operators aware of the requirements of the nuclear plants? Are transmission operators aware of the requirements of the nuclear plants? Are the voltage requirements of the nuclear power plants compatible with the reliability standards? Are the voltage requirements of the nuclear power plants compatible with the reliability standards? Are special procedures and reliability standards necessary to meet the nuclear power plants’ safety requirements? Are special procedures and reliability standards necessary to meet the nuclear power plants’ safety requirements?

Resulting Issues of Nuclear Plants (Cont.) Due to their specifications concerning offsite power, nuclear power plants are susceptible to voltage variations and frequency swings. Due to their specifications concerning offsite power, nuclear power plants are susceptible to voltage variations and frequency swings. Due to their generation size, the loss of nuclear power plants is usually the largest single contingency faced by the transmission operator. Due to their generation size, the loss of nuclear power plants is usually the largest single contingency faced by the transmission operator.

ERO Proceeding Industry is developing a new standard on Nuclear Plant Off-site Power Coordination. Industry is developing a new standard on Nuclear Plant Off-site Power Coordination. The standard covers coordination between the nuclear plant and transmission system. The standard covers coordination between the nuclear plant and transmission system. NRC can work directly with industry to ensure standards meet their needs. NRC can work directly with industry to ensure standards meet their needs.

Reliability Standards - Nuclear Plant Needs A cooperative effort with the NRC and the Commission is important. A cooperative effort with the NRC and the Commission is important. The NRC can most effectively engage the ERO directly through the standards process. The NRC can most effectively engage the ERO directly through the standards process. Entities should be aware of, plan to, and operate to the needs of nuclear plants. Entities should be aware of, plan to, and operate to the needs of nuclear plants. This cannot be done alone; the NRC, FERC, ERO, and industry must work together. This cannot be done alone; the NRC, FERC, ERO, and industry must work together.