GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.

Slides:



Advertisements
Similar presentations
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
Advertisements

Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
Sector Planning & Policy Issues: The Energy Sector
Jong Inn Kim Principal Energy Specialist Energy, Transport, and Water Division, Asian Development Bank ROUNDTABLE APEC Energy Trade and Investment Cairns,
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Chris Greacen Li Garden Hotel, Hat Yai, Thailand 20 Nov, 2005 Solar, wind and micro-hydropower: options, costs, resource assessment Palang Thai.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
‘Regional Regulation between the SADC Countries’ Presentation to 18 th World Energy Congress Round Table 10 – B 23 October 2001 Xolani Mkhwanazi Chief.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Trans-Boundary Cooperation in the South Asia Power Sector: Opportunities and Challenges Mike Toman Manager, Environment and Energy Team Development Research.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Charting the Upsurge in Hydropower Development 2015
Australia’s energy markets: change and challenge JOHN TAMBLYN CHAIRMAN AUSTRALIAN ENERGY MARKET COMMISSION ASSOCIATION OF POWER EXCHANGES OCTOBER.
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Case Study: Jepirachi Wind Power Project Northeastern Atlantic Coast Colombia Charles Cormier, PCF Team Tel:
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Overview of Thailand’s power demand and supply With reference to proposed mainstream dams in the Lower Mekong Basin The Development Context Discussion.
Economic Impact of New Hampshire Participation in Regional Greenhouse Gas Initiative University of New Hampshire Whittemore School of Business & Economics.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
THE WORLD BANK East Asia and Pacific Region POWER TRADE IN GREATER MEKONG SUBREGION.
Overview of WECC and Regulatory Structure
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
Structuring Electricity Markets Lester B. Lave Electricity Industry Center Carnegie Mellon University January 10, 2008.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
© 2015 albert-learning.com International Finance.
Seminar on strategies, forecasts and scenarios of APEC economies energy system development (self-funded project proposal) Department of International Cooperation.
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
The Greater Mekong Subregion Development Potentials.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Thailand’s experiences in the power sector Chuenchom Sangarasri Greacen Chris Greacen, Ph.D. Palang Thai International Seminar on Dams and Sustainable.
The World Bank Beyond Infrastructure: Trade and Transport Facilitation in the Greater Mekong Sub-region REGIONAL AND TERRITORIAL DEVELOPMENT: THE WORLD.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
North American Free Trade Agreement. NAFTA stands for “North American Free Trade Agreement”. It is an agreement between the countries of North America:
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Chairman of the Board and CEO,
Renewable energy potential in Thailand
Damitha Kumarasinghe Director General
STATE ENERGY AND WATER REGULATORY COMMISSION
GMS Power Grid Who gains, who loses?
Generation Expansion Daniel Kirschen
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Energy Strategy Center of Scientific Research Institute of Energy
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Wholesale Electricity Costs
Presentation transcript:

GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort

Leaders from 6 countries met GMS Summit in Kunming, China 4-5 July 2005 MOU Implementation of GMS Power Trade Operation Agreement- Stage 1

What is ? Purpose “To set an implementation framework for bilateral power trade between countries with transmission links in accordance with the draft GMS Power Trade Operation Agreement – stage I” For Thailand, EGAT is the designated entity responsible for plan implementation MOU Implementation of GMS Power Trade Ageement – stage I

Asian Development Bank (ADB) Norconsult June 2002

Indicative Master Plan on Power Interconnection in the GMS Benefits : –Exchange energy e.g. during different peak periods –Reduce shared reserve margin –Maximize efficient utilization of resources in the GMS

Reality of GMS Power Grid: expensive, risky investment Costs excluded in analysis: –Control center –Water usage –Regulator & reliability coordination –Transitional costs Increased vulnerability: events in Laos/Cambodia determine reliability of Thai Grid US$billion Project cost Cost savings* % benefit of total cost 1.0 – 2.1% *Cost savings of extended power cooperation scenarios over base case Source: Comments on Indicative Master Plan on Power Interconnection in GMS Countries by Bretton W. Garrett, P.Eng., Ph.D.

PPA and Regional dispatch Regional Institutions Performance Standards Regional Planning Transmission Tariffs Regional Power Trade Operating Agreement in the Greater Mekong Sub – Region: GMS RPTOA

Goals for Stage # 1  PTOA: Bilateral Power Transactions;  Tariffs for cross-border transmission facilities;  Regional and Operational transmission planning;  Putting in place regional institutions: Regional Regulatory Board, Planning Working Groups, Management Committee  Recommended: Agree and apply rules for Long-term PPA Arrangements for facilitating building of cross-border transmission facilities.

Stage 2-4  Stage 2: power trade among more than 2 countries  Stage 3: All GMS countries are connected by HV transmission links and independent power producers can sell electricity  Stage 4: Complete competitive power trade in Regional Power Pool

Analyses of Dr. Brettron Garrett Transmission expert from BC, Canada

1. “The most serious concern is the wisdom of committing to an expensive, long- term electricity trade arrangement without certainty of the economic benefits”

ADB’s assumptions on benefits of the GMS grid Peak sharing can reduce costs, need for reserve margin Lots of cheap hydropower will be built in Laos, Burma and Yunnan, and can displace electricity generation from gas and coal. Competition among different dam projects in the region will drive cost down so consumers will enjoy low, competitive price

Assumption 1. peak sharing Opportunity for peak reduction

Assumption 2 Hydropower is cheap Hydropower is plentiful Cheap power from dams will displace power generation from gas and coal plants

Assumption 3. GMS grid+competitive trade will drive the price down

Fact 1. peak sharing can reduce peak by only 2.5% Reduce Peak by only 2.5%

Fact 2.”Cheap hydropower” is only an assumption, not findings from studies

Stage 4 is difficult/impossible to reach and there is no set timeline for it to happen With no competition, there is opportunity for price gouging as seen in California Fact 3.No competition

Conclusion: Extremely risky investment Total investment 200,000 million baht (incld. Building dams) May result in benefits worth 90,000 million baht but highly uncertain What is certain is consumers in the GMS have to pay 48,000 billion Baht

2. Regulatory body Balance interests of investors against consumers RPTOA suggests against having a highly independent regulatory No public participation No consideration of other greener, cheaper alternatives

3. Extremely difficult and expensive to harmonize grid standards across the region Split-second decisions by operators in one country can affect the whole region The Canadian economy lost 16,000 million Baht in August 2003 when a negligent USA utility caused a massive blackout.

4. Vulnerability of power interconnection to political situation

Who gains, who loses? GMS consumers are sure to foot the bill of 48,000 million baht to build the grid Economic benefits are highly uncertain and unlikely High risks: technical, environmental & social, political Benefits from dam construction go to multinational corporations, investors, contractors

Who gains, who loses?

Win-win trade?

Without GMS Grid, Thailand’s energy security would be at risk? บันทึกความเข้าใจ แนวทางการดำเนินงานตามข้อตกลง ด้านการปฏิบัติการเพื่อการซื้อขายไฟฟ้า ระหว่างประเทศในกลุ่มอนุภูมิภาคลุ่ม แม่น้ำโขง ระยะที่ 1

ADB: Peak demand in 2020 Source: Norconsult, Indicative Master Plan on Power Interconnection in GMS Countries, June 2002

Energy security or business expansion ?

Thailand’s current demand forecast (Jan04) Annual increases (MW)

ที่มา : กรมพัฒนาพลังงานทดแทนและอนุรักษ์พลังงาน

Biogas from pig farms Reduces air and water pollution Produces fertilizer Produces electricity

Village-scale microhydro Mae Kam Pong village, Chiang Mai 40 kW Community cooperative Expected gross revenues: 30,000 baht/month

2000 MW = ? เขื่อนภูมิพล 780 MW เขื่อนปากมูล 136 MW แม่เมาะ 2400 MW จะนะ 700 MW