NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO 2017-18 For The Quarter Ending March, 2013 PLANNING POWER.

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

FUTURE NTDC PROJECTS UPTO
Monthly Progress Report on NTDC Development Projects for May, 2013
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
NTDC Projects for which Financing is Required
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Brief on HVDC 2015 Brief on HVDC 2015
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
FUTURE NTDC PROJECTS UPTO
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
Quarterly Report on NTDC Development Projects
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
A mountain stream is dammed in a high place, to create an artificial lake or reservoir. Farther down the mountain, the power station is equipped with.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
ELG4125 Transmission and Distribution Systems
APPLIED ELECTRICITY SS3
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Discussion on Draft Restoration (Black Start)procedures.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Block Diagram of a Typical Electric Supply System
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
BANGALORE TRANSMISSION PLANNING
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
Grid maintenance expenses Commerce Commission Workshop 2 March 2010.
Circuit element Average Power ReactancePhase of currentVoltage amplitude Resistor R Current is in phase with the voltage Capacitor C Current leads voltage.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
Sub Station.
Presented by : Er.Suneel Grover
“Electricity Supply Reliability Project - Additional Financing”
Presented by : Er.Suneel Grover
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Presented by : Er.Suneel Grover
the high-voltage network of CERN ToMORROW
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
Yangon Region Rural electrification plan
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
Solving Equations 3x+7 –7 13 –7 =.
NOTICE The authors who don’t receive oral notifications before March 20th are required to present the paper using poster. The size of display board is.
Electricity Transmission Network Improvement Project Grant for preparation
Presentation transcript:

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER April, 2013

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP 1

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 2 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=99PKR Financing Expected Completion (MRs)(MUS$) 1- *Replacement of depleted material at existing grid stations of NTDC system Replacement of obsolete/depleted equipment at 24 No. 500 & 220 kV grid stations ADB Tranche- III **Extension/Augmentation of 500/220kV Rewat substation Extension of 1x250 MVA 220/132 kV T/F Proposed in ADB Tranche- III Augmentation of 2x160 MVA 220/132kV T/Fs to 2x250MVA T/Fs kV Mirpur Khas 220kV sub station with 2x160 MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV In/Out of 220kV Hala Road- T.M.Khan Road S/C T/L at Mirpur Khas (70km) *PC-I submitted to BOD NTDC on for approval **PC-I submitted to BOD NTDC on for approval

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 3 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=99PKR Financing Expected Completion (MRs)(MUS$) 4- 2 nd Source of supply to 220 kV Hala Road Grid Station 220 kV D/C T/L from T.M Khan Road to Hala Road (10 km) 3003 Proposed in ADB Tranche- IV kV Gharo 220 kV sub station with 2x250 MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Jhimpir to Gharo (70km) kV Jhimpir 220kV substation with 2x250 MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Jhimpir to T.M Khan Road (60 km) 7- Replacement of old lines for 220 kV Burhan 220 kV D/C T/L from Tarbela to Burhan on Rail conductor (35 km) Proposed in ADB Tranche- IV

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 4 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=99PKR Financing Expected Completion (MRs)(MUS$) 8- Reconductoring of 220kV Tarbela-ISPR Transmission Line Reconductoring of 220 kV Tarbela- ISPR D/C T/L on Rail conductor (62.5 km) Proposed in ADB Tranche- IV nd Source of supply to 220 kV GIS Islamabad University. In/out of 220 kV Manshera-ISPR S/C at Islamabad University (40 km) Proposed in ADB Tranche- IV kV Chakwal 220kV sub station with 2x160MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV In/out of 220 kV Mangla-Rewat S/C at Chakwal (60 km) kV Mastung 220kV sub station with 2x250MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Mastung to Sibbi (120 km)

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 5 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=99PKR Financing Expected Completion (MRs)(MUS$) kV Chakdara 220kV sub station with 2x250MVA 220/132 kV T/Fs and allied equipment Proposed in ADB Tranche- IV In/Out of 220kV Shahi Bagh- Mardan S/C at Chakdara (85km) Total

6 NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 7 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=99PKR Expected Completion (MRs)(MUS$) kV Faisalabad West 2x750 3x250 Phase -I 500kV D/C T/L for In/Out of 500 kV M.Garh – Gatti S/C at 500 kV Faisalabad West (2km) kV D/C T/L from 500 kV Faisalabad West to 220 kV T.T.Singh (45km) Phase- II 500kV D/C T/L for In/Out of 500 kV Multan-Gatti S/C at 500 kV Faisalabad West (30 km) 220kV D/C T/L from 500 kV Faisalabad West to 220 kV Lalian New (80km) NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 8 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=99PKR Expected Completion (MRs)(MUS$) kV GIS Shadman 2x kV D/C cable from Shadman to Bund Road (30km) kV M-3 Industrial Estate Faisalabad 2x kV M3 Industrial Estate– Faisalabad New (70 km) In/Out of 220 kV Faisalabad West- Lalian at 220 kV M3 Industrial (30 km) NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 9 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=99PKR Expected Completion (MRs)(MUS$) kV Islamabad West 2x750 In/Out of 500 kV Tarbela – Rewat S/C at Islamabad West (40+40km) In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad West (50+50 km) 2x250 In/Out of 220 kV Burhan–ISPR S/C at Islamabad West (15km) In/Out of 220 kV Mansehra/Islamabad University– ISPR D/C at Islamabad West (5+5km) NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 10 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=99PKR Expected Commissioning (MRs)(MUS$) kV Jamrud2x kV D/C T/L from Peshawar to Jamrud (10 km) kV Peshawar New 2x750 In/out of 500kV Tarbela – Peshawar at Peshawar New (2+2km) In/Out of 220kV Peshawar- Shahibagh S/C at Peshawar New (5km) kV Kohat2x kV D/C T/L from Kohat to Peshawar New (50 km) kV D/C T/L from Kohat to Bannu (150 km) Total NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Report Prepared by:DesignationContact No. Maqsood Ahmad Qureshi Additional Manager Projects Planning Fahmeeda ShafiDy. Manager Projects Planning