BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).

Slides:



Advertisements
Similar presentations
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
Advertisements

Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
Status Update on Mechanical Prototype in Rome November 6,
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Spacecraft Stereo Imaging Systems Group S3. Variables Separation of the cameras Height of the cameras – relative to the bench Angle – The direction cameras.
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
1 Module and stave interconnect Rev. sept. 29/08.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
Area (geometry) the amount of space within a closed shape; the number of square units needed to cover a figure.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
LASER AND ADVANCES IN METROLOGY
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
1 Module and stave interconnect Rev. sept. 29/08.
1 Imaging Techniques for Flow and Motion Measurement Lecture 18 Lichuan Gui University of Mississippi 2011 Large-scale PIV and Stereo High-Speed Imaging.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS Pixel Detector Discussion of Tolerances November 12, 1998 Pixel Mechanics D. Bintinger, LBNL E. Anderssen, LBNL/CERN.
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Projective Praxial =Proximity+Axial In-plane bil bml bol Muon Chamber Alignment (Saclay) goal: absolute 30um on sagitta sofar: relative movements (better.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
The Mask-Sphere, M-S Is calibrated by setting it into the conical cup and recording the mask position with a fixed C- CCD. The M-S is rotated 4x by 90°
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
26/10/20051 BARREL ALIGNMENT: LIST OF PARAMETERS REQUIRED FOR THE POSITIONING AND THE CALIBRATION OF THE VARIOUS ELEMENTS Praxial system: - Platforms -
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
M. Bianco On behalf of the ATLAS Collaboration
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Chapter 10 Geometry Part 1. 1.Polygons on a Coordinate Grid 2.Nets of Polyhedrons 3.Surface Area of Polyhedrons 4.Surface Area Continued 5.Spring Break.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
# 23 SINGLE IMPLANT CASE Osteotomy Progression in Open Guide Sleeve
BM&N STS ladders assembly in VLHEP
Lab 2 Alignment.
ATLAS pixel module assembly flow
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Ladder Assembly All tools and jigs produced Glue dispensing works
Stave 4008 Z rubyballs coordinates
UNIT-I SLOTTING MACHINES
SVT Module design F.Bosi
nSW Alignment Installation
LumiCal mechanical design, integration with LDC and laser alignment
Overview of the Frascati Production Facilities
Overview Pin-hole model From 3D to 2D Camera projection
Simplified Procedure Draft
Presentation transcript:

BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database). Principle: Use a precisely adjusted template squares (precision < 10  m) to hold the platform at their nominal position during the glue curing w.r.t. the endplugs (2 points) and the outer tube surface or on the jig (BOS only) at the level of the first comb. Flat surface on endplugs Half sphere on end plugs 6 adjustable (on CMM) balls for the platform positioning Half sphere on the tube outer surface or on the jig (BOS) C. Guyot (Saclay) Dubna 06/2000

Praxial platform positioning tools: Top view Bottom view

Positioning in x of the template tools on the tube layer: Tube with calibrated length (+- 50  m) Ruler with straigthness < 100  m Platform screwed on the positioning square

The optical control tools Goal: Check the platform orientation (angles) during the tube layer assembly ( Reminder: The platforms are glued on the first layer) Register on a database the values of the angles measured after only one tube layer glued (i.e. right after the platform gluing) and the angles mesured at the end of the multilayer assembly. For the module 0 assembly, register the values after each tube layer assembly (Not possible on BIL due to the stiff back geometry). Principle: 4 tools (towers) carrying 2 cameras and 2 LEDs looking at each neighbour 2 leds CMOS image sensor lens f~ 80 mm (except for BIS transverse: 60 mm) Plateform angle ~ (X/Y(pixel) - X 0 /Y 0 ) * pixel_size / f Average led spot coordinate From the calibration on the granite table

Measured platform angles y 12 x 12 y 14 x 14 y 43 x 43 y 41 x 41 y 21 x 21 y 23 x 23 y 34 x 34 y 32 x 32 Tower 1 Tower 3 Tower 2 Tower 4 Z ch X ch Image sensor axis (pixel direction) Signal side HV side Rotation of platform 1 around X ch axis:  X = (X 14 -X 0 14 )/f Rotation of platform 1 around Y ch axis:  Y = - (Y 12 -Y 0 12 )/f = - (Y 14 -Y 0 14 )/f Rotation of platform 1 around Z ch axis:  Z = - (X 12 -X 0 12 )/f Rotation of platform 2 around X ch axis:  X = (X 23 -X 0 23 )/f Rotation of platform 2 around Y ch axis:  Y = (Y 21 -Y 0 21 )/f = (Y 23 -Y 0 23 )/f Rotation of platform 2 around Z ch axis:  Z = (X 21 -X 0 21 )/f Y ch

Control tool calibration Longitudinal lines : Distance adjusted to +- 2mm Precision wedges x z Calibrates rotations around z and y axis

Control tool calibration Transverse lines : Distance adjusted to +- 2mm Precision wedges z x Calibrates rotations around x axis only Square ( 90 degrees +- 1 mrad)

Saclay will supply each MDT lab (barrel) with a set of 4 template squares and a set of 4 control tools (with cables to the RASMUX). Each lab will have to provide: - A length calibrated tube - A straight ruler of length ~ chamber width - square width The absolute calibration of the control tools will have to done on a granite table prior to the module 0 assembly. This calibration requires a precision side on the granite table or (better) a precision wedge. If the assembly table on side does not allow such a calibration (no room or no precise side face), this calibration will be done at Saclay (hoping that the image sensor does not move during the transport).