LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/2015 30/01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.

Slides:



Advertisements
Similar presentations
Technical Investigation Department. METHOD FOR 3-D MODELLING OF A MIXED FLOW PUMP USING PHOENICS D Radosavljevic.
Advertisements

Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Hydraulics.
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
Study of Liquid Breakup Process in Solid Rocket Motors Author: Michael Stefik & Bryan Sinkovec, Co-Author: Yi Hsin Yen, Faculty Advisor: Professor Ryoichi.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
HVAC523 Circulator Pumps.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Temperature Control Loop
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
T.Schneider/LHCb Muon EDR
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Cooling Systems Adopted For the Use in the Particle Detectors 1 V. Vacek AGENDA: What we can offer for the the AFP R&D Project: Two cooling systems (Aircooler.
To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Pump design Raimonds Nikoluskins CERN – LIEBE project coordination meeting.
Experimental and numerical studies on the bonfire test of high- pressure hydrogen storage vessels Prof. Jinyang Zheng Institute of Process Equipment, Zhejiang.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS.
WP4: Instrumentation Tânia Melo Mendonça. 2 ISOLDE target unit Present target unit base at ISOLDE with 7 inlets (including ion source gas leak, heating.
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning Fabrizio Rossi.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TS-CV-Detector Cooling 25/11/2004M. Battistin - JCOV 25 November JCOV 25 November 2004 Results for the plastic-fluorocarbon compatibility tests Status.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Date of download: 6/29/2016 Copyright © ASME. All rights reserved. From: Printing Three-Dimensional Electrical Traces in Additive Manufactured Parts for.
SPS High Energy LSS5 Thermal contact & cooling aspects
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
Update on the PSB Cooling and Ventilation Systems
BCP Analysis Update Thomas Jones 22/7/16.
CMS GEM services: Cooling
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Sub-system integration for the VBOX
Performance of an Automated Water Based Cooling System for CBM MuCh
Summary of activities of the pellet target development
Target and Horn status report
Simulating convective impingement heating in HASPIF
Cryogenic behavior of the magnet
Presentation transcript:

LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3 contributors

Outline Design: Modifications since the Design Study report Remaining open points Prototyping: LBE shower tests – results HEX test – plan Other prototype to be planned Open points/conclusion 2LIEBE project meeting 30/01/2015

Design… … modifications since the Design Study report and open points 3LIEBE project meeting 30/01/2015

4 Proposed design – at the review LIEBE project meeting 30/01/2015

5 Proposed design – modifications (1) HEX LIEBE project meeting Weight too high: an important part comes from the LBE in the diff chamber and in the HEX. 30/01/2015

6 Proposed design – modifications (2) HEX – detailed design – design validated by numerical analysis LIEBE project meeting Part built by additive manufacturing! Velocity streamlines fro LBE and 600 ˚C CFX analysis Temperatures repartitions foo LBE and 600 ˚C – CFX analysis No double confinement anymore! 30/01/2015

7 Proposed design – updates (3) HEX – part already ordered for test – should be received next week Part tested at 16 bars by the company X-ray analysis provided as well Chemical treatment for finer roughness inside the channel LIEBE project meeting 30/01/2015

8 Proposed design – updates (4) Coupling of the pump part and the main loop part – system proposed 1. positioning of the trolley regarding to the front end, 2. coupling of the trolley thanks to pre-guiding and guiding system, 3. translation of the engine/magnets part thanks to an actuator and sliding guide. LIEBE project meeting /01/2015

9 Proposed design – updates (5) Coupling of the pump part and the main loop part – system proposed 1. positioning of the trolley regarding to the front end, 2. coupling of the trolley thanks to pre-guiding and guiding system, 3. translation of the engine/magnets part thanks to an actuator and sliding guide. LIEBE project meeting /01/2015

10 Proposed design – open points Open points on the design: Monitoring elements to be implemented, filling procedure, emptying procedure, coupling to the Front end LIEBE project meeting Simulations remaining: Shock waves coupled with flow (?), Casserole integrity, And validation of proposed design with prototype! 30/01/2015

Prototyping… … LBE shower test - results 11LIEBE project meeting 30/01/2015

12 Prototypes – LBE shower test (1) LIEBE project meeting What is the proper spacing with LBE? Grid samples Volume of LBE per shower known (between the upper and middle valve) 4 grids to be tested (different spacing from 1 mm up to 0.4 mm), holes diameter of 0.1 mm. 5 showers per grids (repeatability) Camera to take picture (3 per second) Vacuum pump Camera Courtesy D. Grenier & T.M. Mendonca, CERN 30/01/2015

13 Prototypes – LBE shower test (2) LIEBE project meeting Observations: Shower feasibility proven: smallest spacing between holes of 0,5 mm for 0,1 mm holes Oxidation prevent a proper operation of the grid (analysis of the grid foreseen) Size of droplets vary between the start and the end of the shower Shower at start.Shower at the end. After the serie of shower Clogging visible 30/01/2015

14 Prototypes – LBE shower test (3) LIEBE project meeting Hoeve et al. (2010) and C.Clasen et al (2008) gobbling Classification of droplet formation regimes Jetting Gobbling RegimeVelocityCalculated droplet diameter Average droplet diameter - test Gobbling0 to 0,62 m/s~ 1,2 mm~ 1 mm Jetting> 0,62 m/s~ 0,4 mm Impact on the dimension of the droplets created Good agreement between theory and experimental data (considering the measurements and post processing errors). To obtain smaller droplets, the outlet velocity should be > 0,62 m/s (jetting regime). 30/01/2015

Prototyping… … HEX test - plan 15LIEBE project meeting 30/01/2015

16 Prototypes – HEX (1) HEX – test proposal – from Sevan Kelpentidjian Ecal mobil unit will be borrowed from CV department LIEBE project meeting HEX bloc with diffusion chamber, heating elements, feedthrough for thermocouples and openings. Heaters Opening for filling Opening for vacuum pump Thermocouples On the ECAL unit: -Pump up to 7,2 m 3 /h and 4 bars -HEX up to 7 kW -Control of inlet and outlet temperature -Demineralized water ISOLDE cooling circuit: -0,8 m 3 /h -10 bars 30/01/2015

17 Prototypes – HEX (2) Planned tests: Test of the HEX bloc at 16 bar with CERN Test of circulation of water inside the HEX channels, without LBE Test with LBE at various T and under vacuum Expected results: Control of inlet and outlet water temperature to estimate the power extracted Verification of mechanical integrity of the HEX bloc LIEBE project meeting Since there is no circulation of LBE, the velocity of water must be lower than for the LIEBE target to be in the same cooling condition for the water. Might be difficult to assess with precision the power extracted! 30/01/2015

Prototyping… … other prototypes to be planned 18LIEBE project meeting 30/01/2015

19 Prototypes – tests to be planned before the full loop test Prototyping of coupling procedure for the main loop target and the pump/engine one – CERN Prototyping for the coupling of the target with the front end (including the coupling of the monitoring elements and water for the HEX) – CERN Prototyping to assess the behavior of the pipes if the LBE freeze inside (open point from the panel review) - ? Testing of the pump (care to be put on cavitation issue) – IPUL Testing of the robot compatibility in all situation (even in case of break up of the main loop) – CERN Testing of the leak tightness system – CERN Testing of the stability of LBE flow in Y-divider - ? LIEBE project meeting 30/01/2015

Open points - conclusion 20LIEBE project meeting 30/01/2015

Open points - conclusion Design still requires some finalization, Many prototypes to do, 17 recommendations have been given by the panel review: to be discussed today, Other points? 21LIEBE project meeting 30/01/2015

Thank you for your attention! 22LIEBE project meeting 30/01/2015

Back up slides… 23LIEBE project meeting 30/01/2015

6/25/2014 Project Review Meeting24