Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
Advertisements

The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
The Re-Start Meeting Warren County School Strategic Planning Process Action Team Leaders September 25, 2013.
ANNOUNCEMENTS Please any technical issues to CHANGE OF LOCATION: – Days 1 and 2 will now BOTH be held at the Washington DC.
Chapter 7 Schedule Control
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
OFFICE OF SCIENCE Kin Chao, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review Committee.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
1 MANAGEMENT CHECKUP May 17, 2012 Westminster Presbyterian Church Welcome!
First Executive Session Fermilab Director’s/DOE Fermi Site Office's Performance Management System Review of the NOvA Project June 19-20, 2007 Frank Gines.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Project Management Session 7
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
Two Questions Coaching Program [Your Name] [Your Address] [Date] [please name the file: your-name-2questions.pptx] —e.g. bill-marshall-2questions.pptx.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
Guide Workshop Tuesday, August 19, Agenda I.MSD Fall 14 Logistics Werth –45 minutes 1.Class Schedule high level 2.Grading Period Highlights 3.MSD.
Degree and Graduation Seminar Project Management Processes
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Strategic Problem Solving Committee Report Progress during the School Year SPECIAL EDUCATION.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Organizing Your Writing PART 3 – Body and Conclusion.
Changes in the Faculty Review Process for United Academics Faculty Presenter: Patricia Linton, College of Arts & Sciences.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
1 Working as a Team Donald Heer 10/14/09 Adapted from Terri Fiez, Director, School of EECS.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Chapter 4 Short Reports Copyright © 2012 Pearson Canada Inc., Toronto, Ontario.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
MicroBooNE Working Group Meeting March 08, :00– 2:00 PM Black Hole (WH2NW)
Making Health and Safety Meetings Work If you had to identify, in one word, the reason why the human race has not achieved, and never will achieve, its.
HRM 498 ASSIST Teaching Effectiverly/hrm498assist.com FOR MORE CLASSES VISIT
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Welcome to (MAP) 2014 winter meeting J.P.Delahaye MAP Collaboration (FNAL, May 31, 2014)1 SLAC: Dec 2-6,
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting July 10, 2008 Dean. Hoffer / Elaine McCluskey.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
OFFICE OF SCIENCE DOE/SC CD-2/3b Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory February 4,
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Comments on the February DOE Review
Director’s Progress Review Closeout Meeting
Designing Effective Accommodation Plans in Clinical Placement & Internship Settings
Donald Heer 10/06/10 Adapted from Terri Fiez, Director, School of EECS
CH5- SETTING GOALS AND OBJECTIVES, IDENTIFYING STRATEGIES AND TACTICS
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
PM 598 RANK Education Your Life / pm598rank.com
PM 598 RANK Education for Service-- pm598rank.com.
Foothill College Accreditation Self-Study Update
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
[Ballot code, contract number] [Project title]
Presentation transcript:

Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer

04-Aug-2010Director's Progress Review of the NOvA Project 2 Agenda for Executive Session Charge to Reviewers Review Focus Review Agenda Reporting Structure Reviewer Assignments Discussion

04-Aug-2010Director's Progress Review of the NOvA Project 3 Charge

04-Aug-2010Director's Progress Review of the NOvA Project 4 Charge (continued)

Questions to be addressed in each breakouts What work has been accomplished and was the work done per the project’s plan (cost and schedule baseline)? Is the plan for the remaining work reasonable and achievable? Is the organization in place to accomplish the remaining work per the plan? 04-Aug-2010Director's Progress Review of the NOvA Project 5

04-Aug-2010Director's Progress Review of the NOvA Project 6 Agenda

04-Aug-2010Director's Progress Review of the NOvA Project 7 Agenda (continued)

04-Aug-2010Director's Progress Review of the NOvA Project 8 Reviewer Assignments

04-Aug-2010Director's Progress Review of the NOvA Project 9 Reviewer Assignments (continued)

04-Aug-2010Director's Progress Review of the NOvA Project 10 Reviewer Assignments for Breakouts

04-Aug-2010Director's Progress Review of the NOvA Project 11 Reporting Structure Review findings, comments, and recommendations should be presented in writing at a closeout with the NOvA’s and Fermilab’s management. Section for each “Level 2” WBS plus Cost, Schedule, Management sections.

04-Aug-2010Director's Progress Review of the NOvA Project 12 Findings, Comments, and Recommendations Findings Comments Recommendations Findings are statements of fact that summarize noteworthy information presented during the review. Comments are judgment statements about the facts presented during the review. The reviewers' comments are based on their experiences and expertise. The comments are to be evaluated by the project team and actions taken as deemed appropriate. Recommendations are statements of actions that should be addressed by the project team. A response to the recommendation is expected and that the actions taken would be reported on during future reviews.

Examples of Findings, Comments, and Recommendations Finding –A plan for the MI upgrades was presented. The major elements of this plan consist of an upgrade of a MI quad power supply, which is nearly complete, and the addition of two more RF stations. The cavities to be installed currently exist as spares so there is no design and prototyping required. Comment –The project has decided to build the DCCT in-house. The committee supports this effort since the technology and design of this device is well developed and well known. Recommendation –Work with Fermilab management to acquire resources needed to complete the accelerator and beamline modifications. 04-Aug-2010Director's Progress Review of the NOvA Project 13

04-Aug-2010Director's Progress Review of the NOvA Project 14 Reviewer Write-ups Write-up template is posted on Director’s Review Webpage. 8_04/Closeout_Presentation_NOvA_Progress_ docx Write-ups are to be sent to Terry Erickson at prior to 10:30 AM on Thursday, August 5 for the Closeout Dry Run A final report will be issued within 1 weeks after the closeout.

04-Aug-2010Director's Progress Review of the NOvA Project 15 Discussion Questions and Answers