SCRF Monthly WebEx Meeting 2009-8-21 Agenda 1. Report from PMs (15 min.) 2. Report from GLs (10 min.) 1. Progress Reports and Discussions: TOPIX (each.

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
US Cavities Status and Plan Mark Champion 01 October 2009.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Gradient Yield Rongli Geng Jefferson Lab ILC AD&I at DESY, May 28-29, 2009.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
9-cell cavity coordination CM Ginsburg 8 Mar
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
Cavity Database Status J. Kerby with thanks to the Cavity Database Team MLSCRF Webex 9 Dec 2009.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
SCRF Monthly WebEx Meeting Agenda 1.Report from PMs 2.Report from Group Leaders 3.Topics 1.Cavity Gradient and Yield re-evaluation 2.Update of.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
9-cell cavity coordination CM Ginsburg 15 Mar
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Cavity Gradient R&D Status and Future Plans for TDP-2
Oct 22 Group Leaders Planning meeting
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Production Cavities in progress
BAW Prep S1 Global Status Pilot Plant Status
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Highlights from EU Global Design Effort
Retreatment of Superconducting Cavities for the European XFEL
Presentation transcript:

SCRF Monthly WebEx Meeting Agenda 1. Report from PMs (15 min.) 2. Report from GLs (10 min.) 1. Progress Reports and Discussions: TOPIX (each 15 min.) 1. S1-Global Preparation (N. Ohuchi et al.,) 2. ALCPG/ILC-GDE meeting Plan (H. Hayano and C. Adolphsen) 2.Further meeting Plan: (5 min.) 1. SCRF webex meeting to be held on Sept. 16, nominal time, 2. Meeting plan for Industrial R&D. SRF-09 and IPAC , A. Yamamoto1SCRF WebEx Meeting

Report from PMs Report to ILCSC on Cavity Gradient Yield (AY, comment by RG) – Status Report by Global Database team submitted Visiting ORNL/SNS, Superconducting Linac (AY, MR) – Discussions specially on ‘single tunnel and DRFS’, and ‘cryogenics hazard/safety’ Plan for Marc Ross to visit KEK on Aug. 26 – 28 (MR) – Discussions on Availability and AD&I focused with KEK members Plan for Industrial R&D meetings (AY) – Preparation meeting during SRF-2009, Berlin – Satellite meeting prior to IPAC-2010, Kyoto Proposal by AY, comment by MR Plan for ALCPG meeting (AY, HH, CA) – Objectives – Agenda , A. Yamamoto2SCRF WebEx Meeting

Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global Database Team (as part of SCRF Cavity, S0, Group): Rongli Geng (Cavity Group leader, JLab), Camille M. Ginsburg (Database Team leader, Fermilab) Sebastian Aderhold (DESY), Kirk Yamamoto (KEK), Zack Conway (Cornell) , A. Yamamoto 3SCRF WebEx Meeting

Fermilab Understanding the Definition of ‘Yield’ Original S0 concept assumed: –Surface can be reset according to the EP process, and –Multiple processes may be integrated for statistics. Several years of experience shows –Repeat processing may cause degradation Processing and Test recipe has been updated –Complete the process and test only with the first cycle no further processing if the results are acceptable Revision of the definition of ‘yield’ is required –Process (R&D) and Production definitions are different –A common means for collection and evaluation of the data is required New effort started by the Global Database Team –Try a new approach to be more appropriate Production yield with the first/second pass RF test , A. YamamotoSCRF WebEx Meeting4

Fermilab From AD&I Meeting at DESY: Creation of a Global Database for Better Understanding of the ‘Production Yield’ defined in TDP-2 Global Data Base Team formed, May 2009: –Camille Ginsburg (Fermilab) – Team Leader & Data Coordination –Zack Conway (Cornell University) –Sebastian Aderhold (DESY) –Yasuchika Yamamoto (KEK) –Rongli Geng (JLab) – GDE-SCRF Cavity TA Group Leader Activity Plan in 2009: –Mid-July: Initial report to FALC –End July: Determine whether DESY-DB is viable option (DONE  YES!) –Aug. 19: (ILCSC) Status to be reported –Sept Oct. 2, 2009: (ALCPG/GDE) Dataset web-based – to be Supported by FNAL-TD or DESY Explainable, and near-final plots, available, such as –Production ( and process) yield with Qualified vendors and/or All vendors, and time evolution –End Nov. 2009, with input from a broader group of colleagues, finalize: DB tool, web I/F, standard plots, w/ longer-term improvement plan , A. Yamamoto5SCRF WebEx Meeting

Fermilab , A. YamamotoSCRF WebEx Meeting6 First Effort: Check of DESY/JLab data in old yield plot The gradients for DESY data were off by +2MV/m Not 08/09: large component of 2007, and very small component of 2009 Not 1 st or 2 nd test: instead, last (DESY) or best (JLab) Included cavities fabricated by ACCEL, ZANON, AES, JLab-2, KEK-Ichiro This is not the ideal data selection from which to infer a production yield Revised version (corrected only for mistakes) - same data shown 11 / 39 1 st test 13 / 39 2 nd test 7 / 39 3 rd test 3 / 39 4 th test 3 / 39 5 th test 1 / 39 8 th test Old version, shown at PAC, 2009

A Guideline suggested by R. Geng Global Data Collection - 1 Proposition 1: all cavities fabricated and processed according to the following rough steps –Fine grain sheet material –Deep drawing & EBW –Initial field flatness tuning –Bulk EP for heavy removal –H 2 removal with vacuum furnace –Final tuning field flatness (and frequency) –Final EP for light removal –Post-EP cleaning –Clean room assembly –Low temperature bake-out –2K RF test , A. Yamamoto SCRF WebEx Meeting 7

A Guideline suggested by R. Geng Global Data Collection -2 Proposition 2: accept understood variations, and combine samples to maximize statistics, for example: –Fine grain niobium irrespective of vendor –EBW irrespective of prep design welding parameter –Cavities with or without helium tank –With or without pre-EP treatment (BCP, CBP…) –EP irrespective of parameters & protocols Horizontal or (future) vertical EP H 2 SO 4 /HF/H 2 O ratio, pre-mixing or on-site mixing Cell temp. control or return acid temp. control With or without acid circulation after voltage shut off Post-EP cleaning: Ethanol rinse or Ultrasonic cleaning or H 2 O 2 rinsing –H2 out-gassing irrespective of temp. & time –HPR irrespective of nozzle style, HPR time –Clean Room assembly irrespective of practice variability Additional note: The variations of BCP/EP, fine-grain/large-grain are not considered as acceptable variation in this statistical evaluation , A. Yamamoto SCRF WebEx Meeting 8

Fermilab , A. YamamotoSCRF WebEx Meeting9 Example New Yield Plot from the 1 st Successful Vertital RF Test Vertical axis: fraction of cavities satisfying criteria where: –Denominator (logical and of the following): Fabricated by ACCEL or ZANON Delivered to labs within last 2-3 years Electro-polished at DESY and JLab Fine-grain material –Numerator (logical and of the following): Denominator Accepted by the lab after incoming inspection 1 st successful vertical RF test, –excluding any test with system failure, has max gradient > (horizontal axis bin) MV/m; –ignore Q-disease and field emission (to be implemented in future) Horizontal axis: max gradient MV/m Exclude cavities which are work-in-progress, i.e., before rejection or 1 st successful RF test Note: These are results from the vertical CW test at DESY and JLab

Fermilab Comparison of ‘Gradient Yield’ using old (left two bars) and new (right two bars) , A. YamamotoSCRF WebEx Meeting10

Fermilab Summary and Subjects to be Further Investigated The global database team has been formed to –Understand the cavity gradient status in a common-way, world wide The effort has started with –Checking of the ‘old’ yield plot presented in PAC, Vancouver –Revision of the yield plot with some correction: The yield at 35 MV/m in a vertical test remains 50+/-13% for JLab results, and is corrected to 28+/-9% for DESY results –Agreement to use the DESY Database system for superconducting cavities A new ‘production yield’ is being defined with the 1 st pass (and 2 nd pass) –Introduced and under evaluation. The yield at 35 MV/m in a vertical test with the yield 43+/-19% for JLab results, and with the yield 13+/-9% for DESY results Further analysis and evaluation will be carried out for: –2 nd pass production yield –Q 0 value, and field-emission onset in the overall performance evaluation Further report and discussion in the next ILC-GDE in Albuquerque Prospects for further improvement in TDP-2 and updates to the baseline field gradient will be included in AD& I effort , A. YamamotoSCRF WebEx Meeting11

Fermilab End Backup , A. YamamotoSCRF WebEx Meeting12

Fermilab , A. YamamotoSCRF WebEx Meeting13 Details of DESY/JLab data in (old and revised) plots DESY Last test results (not first or almost first) as of March 2009 Production 4: –EP (without helium tank) [10 cavities] Z88, Z93, Z97, Z100, Z101, Z104, Z106, Z107, Z108, Z109 –EP (with helium tank) [0 cavities] Production 6: –EP (without helium tank) [5 cavities] AC115, AC117, Z130, Z131, Z137 –EP (with helium tank) [10 cavities] AC122, AC124, AC125, AC126, AC127, AC149, AC150, Z132, Z139, Z143 JLAB Best test results (not 1 st or almost 1 st test) 14 cavities EP’d and tested at JLab –Accel/RI: A6, A7, A8, TB9ACC011, TB9ACC012, TB9ACC013, TB9ACC014, TB9ACC015 Including cavities, fabricated by AES, and with inhouse effort at KEK (Ichiro) and Jlab (Jlab-2): currently not treated as qualified venders for 9-cell cavities, or end-group not completed –AES: AES001, AES002, AES003, AES004 –KEK: Ichiro-5, JLab: JLab-2

Fermilab , A. YamamotoSCRF WebEx Meeting14 Detailed data description for first production plots For Plot 1 (see Appendix) : first cavity test, qualified vendor [40 cavities] –JLab, Cornell [9 cavities]: A5, ACCEL6, ACCEL7, A8, A9, TB9ACC011, TB9ACC012, TB9ACC013, TB9ACC015 [had accidentally omitted TB9ACC014] –DESY [31 cavities]: AC112, AC113, AC114, AC115, AC116, AC117, AC118, AC119, AC121, AC122, AC123, AC124, AC125, AC126, AC127, AC128, AC129, Z130, Z131, Z132, Z133, Z135, Z137, Z138, Z139, Z140, Z141, Z143, AC147, AC149, AC150 For Plot 1-b: first cavity test, qualified vendor, fine-grain, EP’d with standard techniques [22 cavities] –JLab [7 cavities]: ACCEL6, ACCEL7, TB9ACC011, TB9ACC012, TB9ACC013, TB9ACC014, TB9ACC015 –DESY [15 cavities]: AC115, AC122, AC124, AC125, AC126, AC127, Z130, Z131, Z132, Z137, Z139, Z141, Z143, AC149, AC150 Vast majority are first tests, except underlined are second tests, underlined+italicized are third tests

Fermilab , A. YamamotoSCRF WebEx Meeting15 Error Evaluation Implemented Binomial distribution –Probability of success and failure add up to 1 –Success and failure probabilities are assumed unknown Error on the yields was calculated like this: – c>> efficiency is number of successes divided by number of tries – eff = x suc / x try –c>> error on the number of successes – sig = sqrt (x try * (x suc / x try ) * ((x try - x suc ) / x try )) –c>> error on the efficiency – err = eff * (sig / x suc )

A New Guideline suggested by R. Geng First-Pass Data What it is? –First RF test result following all steps applied –Should be the final power rise data What it is not? –May not necessarily be the first RF test of the cavity Example: some cavities were tested before low temperature bake- out for FE screening purpose –Should not include data of cavities with known material flaw equipment malfunctioning human error, etc , A. Yamamoto SCRF WebEx Meeting 16

Second-Pass Data What it is –Cavities failed to meet ILC gradient and Q spec –Re-treated and re-tested for a second time; re- treatment can be: Re-HPR (for FE reduction) Re-EP (for FE reduction or defect removal) Post-purification (for defect stabilization) ? Repair (local grinding, local re-melting…) followed by re- process and re-test (for defect removal) What it is not –Cavities already passing ILC spec –Re-test without physical changes on RF surface (e.g. T-mapping test) , A. Yamamoto SCRF WebEx Meeting 17

Two-Pass Yield AD&I Mtg , A. Yamamoto SCRF WebEx Meeting 18 An example based on real data from JLab First-pass result decides path forward: Move on for S1 if spec met Re-process (Re-HPR; Re-EP; Local repair) if spec not met

Beyond Two Pass… Some cavities may be re-processed and re- tested more than two passes anyway for various reasons We may still want to monitor these data for purpose of learning. Cavity exchange effort falls into this category –For cross checking facilities –For cross checking processing variability –For cross-calibrating measurement error bars , A. Yamamoto SCRF WebEx Meeting 19

, A. Yamamoto SCRF WebEx Meeting 20

Plan for ML-SCRF: ALCPG/ILC-GDE Sept. 29 – Oct. 3, Albuquerque Conveners: H. Hayano and C. Adolphsen, (N. Soy Subjects: –Technical Summary from SRF-09 –Cavity Gradient Yield Redefinition of the ‘Yield’ and standard processing and cycle Further R&D subject for the gradient improvement Plan/process for re-baseline of ‘Gradient/Yield’ (# cavities, time-line) –Cavity Integration and Plug-compatibility Focusing on the input-coupler interface to cryomodule –Quadrupole magnet design and R&D Focusing on conductively cooled magnet design –S1-Global Preparation Cavity delivery and assembly into Cryomodule Cryogenics and RF test plan –HLRF design w/ single tunnel (hopefully joint discussion with AD& I, CFS): Clustered or Distributed RF/Klystron System Common discussion with CFS and Safety, in AD&I study –Cryogenics/High-pres-gas safety w/ single tunnel (hopefully with AD&I, CFS): Hazard analysis and the safety plan –SCRF Industrialization R&D Preparation for the R&D facilities Specific R&D themes –Joint discussion with cost-management group, , A. Yamamoto SCRF WebEx Meeting 21

Further Plan Next SCRF WebEx Meeting –Sept. 16, (Wed), at nominal time (13:00 GMT) SCRF Industrial R&D meetings –An informal meeting during SRF 2009, Berlin Hopefully at some lunch time, either on Thursday, Friday, –A satellite meeting prior to IPAC-2010, Kyoto A full day meeting on Sunday, May 23, –Advices will be welcome Who may be invited, in addition to –6 companies visited by ILC-PM delegation, and –SCRF laboratories, Appropriate size (< ~ 50 participants) may be important, , A. Yamamoto SCRF WebEx Meeting 22