Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.

Slides:



Advertisements
Similar presentations
Maintenance Planning and Control : Modeling and Analysis
Advertisements

Factory Objectives Value of Asset Management Strategies.
5.2 Costs and Revenues IBBM.
AACEI Contingency Forum Contingency Management
World Zarathushti Chamber of Commerce BUSINESS PLAN ORIENTATION PROGRAM.
Introduction to Small Business
Scope Creep Who is the Ring leader of your Circus
Wrap Rate Technique Chapter Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual.
WHY USE A FLUID SEALING SPECIALIST? FOR SAFETY & RELIABILITY BECAUSE…….
Project Cost Management Estimation Budget Cost Control
Concepts in Enterprise Resource Planning Fourth Edition
Ambition in Action. Ambition in Action HEAD TEACHER DEVELOPMENT PROGRAM – FINANCAIL MANAGEMENT.
Understand economic conditions 1.  Measuring economic activities  Classifying economic conditions 2.
Productivity Prepared by Dr. Manal Moussa. Productivity Prepared by Dr. Manal Moussa.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
EM15 – Contractors COST MANAGEMENT
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Economics of Sustainability When money speaks, nobody cares for the grammar!
Project Planning and Capital Budgeting
Copyright © 2013 by The National Restaurant Association Educational Foundation. Published by Pearson. All rights reserved. HOSPITALITY HUMAN RESOURCES.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
The economy at Full Employment Lecture notes 4 Instructor: MELTEM INCE.
On Target Group Coaching
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
H&S Consultants Consulting Services and Project Management.
Essential Standard 1.00 Understand the role of business in the global economy. 1.
Inventory Planning and Management Chapter 5. Inventories include all tangible items held for sale or consumption in the normal course of business for.
Unit 3 Accounts & Finance Budgeting. Learning Objectives Understand the importance of budgeting for organisations Calculate and interpret variances Analyse.
CVE 4070 Construction Engineering Civil Engineering Jobs Prof. Ralph V. Locurcio, PE.
© SYBEX Inc All Rights Reserved. Session 6 Cost Planning: How Much Is This Going to Cost?
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
Value Added Documentation Mission Statement Provide an understanding in the development, implementation and reporting of Graybar’s value added program.
5.2 Costs and Revenues Chapter 31. Management Decisions and Cost Business decisions cannot be made without cost information. Why?  Profit or loss cannot.
Merger Integration, Process Improvement, Increased Collections And Cost Reduction within a Pharmaceutical Firm BackgroundBackground The client is a major.
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
IB Business and Management 3.4 Budgeting. Learning Outcomes To be able to explain the importance of budgeting for organisations Calculate and interpret.
Ch 91 IT-390Cost Analysis. 2 Project Estimating (Design) l A Project Estimate is one of a kind n Custom design, only one will be manufactured n Capital.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Concepts in Enterprise Resource Planning Fourth Edition
Fiscal Planning (Budgeting). Fiscal Planning Fiscal planning is not intuitive; it is a learned skill that improves with practice. Fiscal planning requires.
Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
Future Research Leaders Program Module 5 Financial, Resource and Risk Management.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
1 Budgeting Learning Objective: Understand the function of financial budgets. Awareness of the concept of a financial budget Pg
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
STRATEGY IMPLEMENTATION Chapter 7. FUNCTIONAL STRATEGIES These are made up of day to day decisions made at the operating level of the firm, often performed.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Is There a Proper Accounting for Indirect Costs?
Implement expense-control strategies
CMRP - Certified Maintenance & Reliability Professional
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Feasibility.
Introduction Project Management.
Small Sites Planning & Scheduling
Costs and Economics of Construction
Implement expense-control strategies
Chapter 3 Proposed Solutions
Principles of Accounting 2002e
Implement expense-control strategies
PowerPoint presentation
Introduction Project Management.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited

Total business impact The rational cost model Cost breakdown structure Cost Mapping Estimating for the future What I’ll Cover

Slide 3 Defining the Term What do we mean by “Turnaround Costs”? Only the direct cost of doing the Turnaround? The direct cost plus the penalty of lost production? Do we include incidental costs? How about this definition? “Every dollar we spend or lose in planning and executing the event compared with what we would have saved or kept if we had not performed the Turnaround”

Slide 4 Includes all cost generators -Preparation -Manpower -Material -Equipment -Services -Loss of Production -Downtime salaries -On costs -Disposal costs -Interaction costs -Emergent work -Overrun -Overspend -Throughput -Product Quality -Loss of Profit -Loss of Market share -Loss of customers -Loss of reputation -Legal action EVENT COSTS POTENTIAL COSTS PRODUCTION COSTS BUSINESS COSTS Event cost $3.44 ($2.6) Potential costs $0.75 Production Costs $0.37 Business Costs: $5.80 Total Business Impact $10.36 Actual Example: Figure in brackets represents what the company would have calculated as the “cost” of the Turnaround in the past, before they began to use this model. The Bottom Line – Total business impact +

Slide 5 Shutdowns are task driven events and each task incurs a cost: TASK Loss of production Emergent work Generates - Preventive - Corrective - Process driven - Inspection - Improvement 3 Types of cost -Indirect -Direct -Contingency Incurs You do not control cost because cost is an output What you need to control is the input - people’s spending behaviour How costs are generated Elements Manpower Materials Equipment Services Facilities Utilities

Slide 6 The limits of control Requests for planned work are generated by others Requests for emergent work is generated by the situation Once the workscope is agreed, material costs are fixed The Turnaround manager controls only labor costs These can represent as little as 30% of the total cost

Slide 7  Costs accrued for the Whole event Planning phase. Relatively small team and low expenditure Build up of pre- shutdown work and remainder of planning Execution phase Plant shut down, scheduled work and start up Termination phase - bringing plant back up to full production 10% 8% 80% 2% Volume – where you spend the money

Slide 8 Don’t confuse volume with value Highest value derived from lowest revenue spend Highest value First 1% - (Strategy) Determines planning Next 9% - (Planning) Determines Execution Next 8% - (Pre-shut) Influences Execution Lowest value Execution %Value Value – the leverage you get from the money you spend

Slide 9 Generate a single event cost code for the Turnaround Don’t book Turnaround costs to any other cost code Don’t book non Turnaround costs to the event cost code Book all Turnaround costs to the event cost code Employ a cost breakdown structure to differentiate costs Employ cost mapping detail the differentiated costs Use a qualified cost coordinator to operate the cost model Build the cost model in your finance system (SAP etc.) Basic Rules – If you honestly want to know the real cost of a Turnaround

The rational cost model Stage 1 - Differentiate Costs This takes discipline and determination Worklist Closure Event Start Date End Date Planned Work Late Work Emergent Work - Measure performance against this figure - I nvestigate and eliminated them - Extra & Additional work (+ late work) Event Initiated Control estimate - Agreed workscope for the event Late work Costs - Measures control of work (+ defects) Contingency Cost - Analyse to improve prediction

Slide 11 Turnaround Costs Compression Unit Processing Unit Fractionation Scheduled Work Emergent Work Late Work Capital Project Modification Project Preparation Emergent Work General Contingency Fund Stage 2 - Create a cost breakdown (Example)

Slide 12 Turnaround Costs Compression Unit Processing Unit Fractionation Scheduled Work Emergent Work Late Work Capital Project Modification Project Preparation Emergent Work General Contingency Fund Stage 3 - General Cost Mapping Cost Mapping  Costs are allocated to individual jobs  For each job, cost are further broken down into:  Manpower (hours, %overtime)  Equipment (purchase, hire costs & servicing  Materials (proprietary items, raw materials & consumables  Services (scaffold, insulation, cleaning etc.)  Costs not usually broken down per job  Utilities (electricity, gas, water)  Facilities (stores, cabins, canteens, washrooms etc)  Temporary Infrastructure (cables, plumbing, barriers, signs etc)

Slide 13 Turnaround Costs Compression Unit Processing Unit Fractionation Scheduled Work Emergent Work Late Work Capital Project Modification Project Preparation Emergent Work General Contingency Fund Stage 4 - Detailed Cost Mapping Cost Mapping  Costs are allocated to individual jobs  For each job, cost are further broken down into:  Manpower (hours, %overtime)  Equipment (purchase, hire costs & servicing  Materials (proprietary items, raw materials & consumables  Services (scaffold, insulation, cleaning etc.)  Costs not usually broken down per job  Utilities (electricity, gas, water)  Facilities (stores, cabins, canteens, washrooms etc)  Temporary Infrastructure (cables, plumbing, barriers, signs etc) Rolled up into preparation and execution costs for client, contractor and sub-contractor resources Management Engineering Supervision Inspection Technicians (tradesmen) Semi skilled Unskilled Mechanical Electrical Instrument Fabrication Civil

Slide 14 Fragment of a Cost Estimate/ Report - Detailed Materials Client –Area 1 Proprietary Fabrications Consumables Common stock Raw materials Gaskets Capital Equipment Client –Area 1 Cranes Lifting Weld sets Generators Transport Compressors Tenders Safety Services Client –Area 1 NDT Scaffolding Water wash Cleaning Painting Insulation Hi-torque Manpower Client –Area 1 Engineering Inspection Electrical Instrument Fabrication Supervision Mechanical Civil Riggers Unskilled Management

Slide 15 Execution Cost Estimate/ Report (roll-up) l Client Area 1 Client Area 2Contractor 1 Contractor 2 Planned Actual Manpower Materials Equipment Services Contingency 8% Contractor 3 Totals Fixed Price Contractor 4 Fixed Price Grand Total Planned Actual Variance + /

Slide 16 Estimating for the future Detailed comparison highlights critical cost issues Main Contractor Sub-Contractor Client Resource Spares/ Materials Workshops Hire charges Safety costs Miscellaneous

Use money as the ultimate control mechanism o Calculate the total business impact o Use a rational cost model o Don’t confuse volume with value o Control people’s spending behavior o Map out your costs in great detail Key Points to Take Home

Slide 18 Thank you – any questions

Produced by: Tom Lenahan Tom Lenahan Limited