Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Housing Service Review Service Report 24 November 2014.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ACCU Report from GS User Commission G. Passaleva June 15, 2011 ACCU.
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
The Next Generation of a Gamma Irradiation Facility GIF++
CMS Centre Project - Green Light Meeting
I. Bergevoet - Training preparation
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Background B513 built in early 1970’s for mainframe era.
South Carolina Perspective on Part 61 Proposed Revisions
Special LS1 day on 12 June 2012, EDMS:
East Hall under construction
UNION GROVE ELEMENTARY REFERENDUM
Westminster House, The Wells Road Centre, Nottingham
EAST PENNSBORO AREA SCHOOL DISTRICT
East Hall under construction
Presentation transcript:

Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling

Present Status 2

Status of the budget Request Propose to merge the two Class C laboratories by extending building 115 and to bring the laboratory up to standards JUSTIFICATION Elimination of the risk associated with the transport of radioactive sources across the Route Einstein from building 170 (ISOLDE experimental hall) to building 275 Reduction of the number of Class C type laboratories on the CERN site. This will enable better control of open source handling and minimize the operational costs for such laboratories. Confinement of all open source handling at ISOLDE within an adequately controlled perimeter. Upgrading of the present Class C laboratory in building 115 Moving the Class C laboratory from building 275 into the ISOLDE Facility perimeter will increase the available office space at CERN: the up-stair rooms in building 275 can be used again as offices - without being in conflict with radiation protection requirements. For the modification and extension of building 115 to Class C specifications 400kCHF for 2013 In agreement with the Civil Engineering group at CERN, the work can start in January 2013 and be completed by the end of SUBMITTED to Sigor Lettow September the 5th 3

4

5 1.Building 507 is in very bad stage. Profit for the shutdown to demolish and build a new one User Facilities Ceiling Cracks on the external wall Broken external panels

6 Replace the existing building 507 by a new building / modular cabins: Ground floor (only accessible from within the surveyed area): - Labs and workshop First floor (accessible from outside the surveyed area): - Data Acquisition rooms - Meeting room/Visitors Center - (Kitchen?) Design study: Eliseo Perez-Duenas GS/SE

7 Cost studies new B 507(508) Use of modular cabins instead of a full concrete building Phase 1: estimate 160kSFr - dismounting the present building 30kSFr - construction permit - adapting the concrete foundation 130kSFr Phase 2: estimate 520kSFr - (non-standard) modular cabins, interconnected and on 2 floors - total surface 435 m2 - not taken in account electrical installations, CV, Labo’s, etc. - Present Cooling and Ventilation was done by CERN in We assume a cost similar to the one of Bat 115 of 70kSFr x 3 (bigger) = 210 SFr One way to optimize the cost of CV is making a “confort” system for the full building (assumed by CERN) and dedicated CV for laser rooms pay by Experiments & ISOLDE Collaboration. Advantages: - lower costs - fast construction ESTIMATED IN AROUND 4 months - flexible work floor

8 Replace building 507 Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

9 2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area): Replace building 507

10 Planned – Building distribution Controlled access Free access Controlled area

11 1.Have a building in working conditions! 2.Due to regulations of RP, physicists cannot sit in the hall when HIE-ISOLDE LINAC is running. This prompts the need of a new distribution of top floor of Bat. 507, to accommodate DAQ rooms. 1.It has to be done during shut down, LS1, as the bottom floor allocates the laser for Atomic and Nuclear Physics Studies. 2.Open the ISOLDE Facility to visitors and General public which will not be allowed in the hall after LS1 due to safety regulations. Why do we need to demolish and replace building 507? All necessary studies has been done The project is ready for submission and approval Identify a possible company, the one finishing HIE-ISOLDE Possible requirement of paying for extra CV for lasers room

JUN 2013NOV 2013 JUN 2014 Timeline 12 Physics with lasers Demolishing existing building New Floor + Barracks Electricity Coling & ventilation Central CV ± 3 degrees Special one for lasers in laser rooms

Present Status Both Department PH (Philippe Bloch) and BE ( Paul Collier) agree and support the need to demolish and re-built building 507 Luigi Scibile, Group Leader of GS-SE with the mandate “The Group is responsible to provide, to maintain in working conditions including their eventual operation and to renovate the civil engineering structures and infrastructures” 29 October 2012 (L. Scibile) We have included the refurbishment of the 507 (future 508) in the list of potential consolidation works for Probable decision at the end of November 13