30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94, 95 & 96 for Rs.95Cr. The Project will be completed by 6/2006 & IP of 4.14 Lakh Acres (Stab Lakh acres + New 1.39 Lakh acres) will be created. Funded by AIBP. Head works, 3 main canals & Structures completed. SOMASILA PROJECT (2 years period) NELLORE ANICUT SANGAM ANICUT PENNA RIVER BAY OF BENGAL SOMASILA- KANDALERU FLOOD FLOW CANAL KAVALI CANAL (PKG94) KANIGIRI RESERVOIR SOUTH FEEDER CANAL (PKG 95) SOMASILA RESERVOIR Capacity : 78 TMC FRL : 330’( M) Ayacut : 4.14L Acrs. North feeder canal (PKG 96) Discharge : 380 Cusecs Ayacut : 43,000 Ac. Length : 72.92Km KANDALERU RESERVOIR Discharge : 950 Cusecs Ayacut : 55,000 Ac. Length : Km Discharge : 353 Cuses Ayacut : 41,000 Ac. Length : 72.00Km AP – TN Boarder Poondi Reservoir Capacity : 68.05TMC Ayacut : 3Lakh Acres. FRL : + 279’ Cap.2.75 TMC
1 Project Profile: Across river Pennar at Somasila (V), Nellore (Dt.) 2 No. of EPC Packages : 3 No 4 Agreement value of 3 packages : Rs Crs. 5 Budget provision for : Rs Crs. 6 Expenditure of the project 2004 – 05 : Rs Crs – 06 : Rs Crs. Cum. Exp. : Rs Crs 7 Utilisation : TMC 8 Ayacut New Ayacut: 1,39,000 acres Stabilisation: 2,75,000 acres Total: 4,14,000 acres 9 Land Acquisition Required : acres Requisitioned : acres Acquired : acres 10 Forest land : acres for canals 11 Estimated Cost of LA : Rs Crs. SOMASILA PROJECT
12 Mob. Advance (Rs. in Crores) : Paid Recovered : : Total : Target date of completion : 7/2006
PKG No. Description Agt. Value & Date Agt. Period Name of the contractor 94 Providing cement concrete lining of Kavali canal between KM and KM Rs Cr. Dt: Months M/s SRK Bhailal Bhai, JV, Hyd 95 Providing cement concrete lining in bed and side slopes of somasila project in between KM to KM Rs Cr Dt: Months M/s MSK – SURYACON (JV), Nellore 96 Providing cement concrete lining of GK canal (NFC) between and KM Rs Cr Dt: Months M/s MSK – SURYACON (JV), Nellore SOMASILA PROJECT
Pkg.No. 94/Cat-II : Easening of slops 1:5:1 providing cement concrete lining with paver in bed and side slopes of Kavali canal of Somasila Project in between Km to Km including Investigation, Design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. S.r.K. Bhailal Bhai (JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 milestones) Target date of completion: 3/2007 Designs: HPs approved Execution: work not in progress due to water released into the canal Qty. of earth work done : 70,000 cum against 7,27,907cum Machinery: Deployed 45 Nos. (Excavators-7, Tippers-19,paver-2,concrete mixers-4 Nos) Expenditure: Rs Crs Rs Crs. Cum. Exp. Mob. Adv. only- Rs Crs. Bottle Neck: Forest clearance. Forest land: Required acres
Pkg.No. 95/Cat-II : Construction of distributary system of create irrigation potential of 912 Acres including investigation, design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. M.S.K. Surya Con(JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 months) Target date of completion: 3/2007 Investigation: Km length against Km Design: 2.00 Km length against Km Execution: 14 Kms length against Kms. Qty. of earth work done : 3,37,000 cum against 10,23,380cum Qty. of concrete work done: 3000 cum against 61,990 cum No. of Machinery : 43 Nos. (Excavators-5, Tippers-4, pavers-4, concrete Mixers-6) Expenditure: Rs Crs. (Inc. Mob. Adv.) Land Acquisition: Required ac., Acquired ac. Bottle neck: Forest clearance and land acquisition. Forest Land: Required acres
Pkg.No. 96/Cat-II : Easening of slops 1:5:1 providing cement concrete lining with paver in bed and side slopes of G.K. Canal (NF.C) of Somasila Project in between Km and Km including Investigation, Design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. M.K.S. Surya Const(JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 milestones) Target date of completion: 3/2007 Investigation: Completed. Designs: In progress Execution: 9.73 Km length against Kms. Qty. of earth work done : 1,25,000 cum against 9,53,297 cum Machinery : Deployed 5 Nos. (Excavator-1, Tippers-4) Expenditure: Rs Crs. (Inc. Mob. Adv.) Forest land: Required acres Bottle Necks: Forest clearance