30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Hydro Electric Power Plant
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
DISTRICT RURAL DEVELOPMENT AGENCY, KENDRAPARA Success Story Presented By:- PANCHAYAT SAMITI Mahakalapara Dist-Kendrapara.
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Budget allocation and release of funds to implementing agencies under ADIP Scheme S.NoFinancial Year Budget Estimate (Rs. In crores) Amount Released (Rs.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
WATER RESOURCES DEPARTMENT
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
1 1 Golden Quadrilateral Golden Quadrilateral Status August † Estimated Cost Completed / 4 laned Under Implementation Award during 2002.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
DAMODAR RIVER VALLEY AN INDIAN PARALLEL TO THE TENNESSEE RIVER VALLEY
City:- Corporation of City of Panaji
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
PPL1.6 Pumping Plant Project Overview
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
Presentation transcript:

30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94, 95 & 96 for Rs.95Cr. The Project will be completed by 6/2006 & IP of 4.14 Lakh Acres (Stab Lakh acres + New 1.39 Lakh acres) will be created. Funded by AIBP. Head works, 3 main canals & Structures completed. SOMASILA PROJECT (2 years period) NELLORE ANICUT SANGAM ANICUT PENNA RIVER BAY OF BENGAL SOMASILA- KANDALERU FLOOD FLOW CANAL KAVALI CANAL (PKG94) KANIGIRI RESERVOIR SOUTH FEEDER CANAL (PKG 95) SOMASILA RESERVOIR Capacity : 78 TMC FRL : 330’( M) Ayacut : 4.14L Acrs. North feeder canal (PKG 96) Discharge : 380 Cusecs Ayacut : 43,000 Ac. Length : 72.92Km KANDALERU RESERVOIR Discharge : 950 Cusecs Ayacut : 55,000 Ac. Length : Km Discharge : 353 Cuses Ayacut : 41,000 Ac. Length : 72.00Km AP – TN Boarder Poondi Reservoir Capacity : 68.05TMC Ayacut : 3Lakh Acres. FRL : + 279’ Cap.2.75 TMC

1 Project Profile: Across river Pennar at Somasila (V), Nellore (Dt.) 2 No. of EPC Packages : 3 No 4 Agreement value of 3 packages : Rs Crs. 5 Budget provision for : Rs Crs. 6 Expenditure of the project 2004 – 05 : Rs Crs – 06 : Rs Crs. Cum. Exp. : Rs Crs 7 Utilisation : TMC 8 Ayacut New Ayacut: 1,39,000 acres Stabilisation: 2,75,000 acres Total: 4,14,000 acres 9 Land Acquisition Required : acres Requisitioned : acres Acquired : acres 10 Forest land : acres for canals 11 Estimated Cost of LA : Rs Crs. SOMASILA PROJECT

12 Mob. Advance (Rs. in Crores) : Paid Recovered : : Total : Target date of completion : 7/2006

PKG No. Description Agt. Value & Date Agt. Period Name of the contractor 94 Providing cement concrete lining of Kavali canal between KM and KM Rs Cr. Dt: Months M/s SRK Bhailal Bhai, JV, Hyd 95 Providing cement concrete lining in bed and side slopes of somasila project in between KM to KM Rs Cr Dt: Months M/s MSK – SURYACON (JV), Nellore 96 Providing cement concrete lining of GK canal (NFC) between and KM Rs Cr Dt: Months M/s MSK – SURYACON (JV), Nellore SOMASILA PROJECT

Pkg.No. 94/Cat-II : Easening of slops 1:5:1 providing cement concrete lining with paver in bed and side slopes of Kavali canal of Somasila Project in between Km to Km including Investigation, Design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. S.r.K. Bhailal Bhai (JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 milestones) Target date of completion: 3/2007  Designs: HPs approved  Execution: work not in progress due to water released into the canal  Qty. of earth work done : 70,000 cum against 7,27,907cum  Machinery: Deployed 45 Nos. (Excavators-7, Tippers-19,paver-2,concrete mixers-4 Nos)  Expenditure: Rs Crs Rs Crs. Cum. Exp. Mob. Adv. only- Rs Crs.  Bottle Neck: Forest clearance.  Forest land: Required acres

Pkg.No. 95/Cat-II : Construction of distributary system of create irrigation potential of 912 Acres including investigation, design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. M.S.K. Surya Con(JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 months) Target date of completion: 3/2007  Investigation: Km length against Km  Design: 2.00 Km length against Km  Execution: 14 Kms length against Kms.  Qty. of earth work done : 3,37,000 cum against 10,23,380cum  Qty. of concrete work done: 3000 cum against 61,990 cum  No. of Machinery : 43 Nos. (Excavators-5, Tippers-4, pavers-4, concrete Mixers-6)  Expenditure: Rs Crs. (Inc. Mob. Adv.)  Land Acquisition: Required ac., Acquired ac.  Bottle neck: Forest clearance and land acquisition.  Forest Land: Required acres

Pkg.No. 96/Cat-II : Easening of slops 1:5:1 providing cement concrete lining with paver in bed and side slopes of G.K. Canal (NF.C) of Somasila Project in between Km and Km including Investigation, Design and estimation. SOMASILA PROJECT Name of the Contractor: M/s. M.K.S. Surya Const(JV) Agreement Amount : Rs Crs. Agreement Date: Period of completion: 24 Months(8 milestones) Target date of completion: 3/2007  Investigation: Completed.  Designs: In progress  Execution: 9.73 Km length against Kms.  Qty. of earth work done : 1,25,000 cum against 9,53,297 cum  Machinery : Deployed 5 Nos. (Excavator-1, Tippers-4)  Expenditure: Rs Crs. (Inc. Mob. Adv.)  Forest land: Required acres  Bottle Necks: Forest clearance