E-Science and Technology Infrastructure for Biodiversity and Ecosystem Research.

Slides:



Advertisements
Similar presentations
Professor Dave Delpy Chief Executive of Engineering and Physical Sciences Research Council Research Councils UK Impact Champion Competition vs. Collaboration:
Advertisements

BISE platform on Ecosystem assessments EIONET Biodiversity NRC – European CHM network November 2012, Copenhagen, EEA Valérie LAPORTE.
UPGRADE BS-SCENE Up-Grade Black Sea scientific network (INFRA) ENVIROGRIDS Building Capacity for a Black Sea Catchment Observation and Assessment (Environment)
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
Vision and Ambition for LifeWatch ICT Infrastructure Axel Poigné (Fraunhofer IAIS) Vera Hernández-Ernst (Fraunhofer IAIS) Alex Hardisty (Cardiff University)
Towards a LifeWatch network in Spain Madrid, 14 July 2009 e-science and technology infrastructure for biodiversity research Wouter Los Coodinator of LifeWatch.
Living With Environmental Change Mary Barkham LWEC Deputy Director Understanding Society Workshop 27January 2011.
Meeting of the Management of Statistical Information System (MSIS 2014) Innovation – Open Data Initiative of Government of India – Fostering Innovations,
The Resilient Coasts Initiative A Partnership Response.
Marine Biodiversity: A science Roadmap for Europe Yves-Marie PAULET IUEM LabexMER Marine Board delegate – French university network.
1 Building National Cyberinfrastructure Alan Blatecky Office of Cyberinfrastructure EPSCoR Meeting May 21,
Drivers for a PRAGMA Biodiversity Science Expedition Reed Beaman Florida Museum of Natural History University of Florida.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Near East Rural & Agricultural Knowledge and Information Network - NERAKIN Food and Agriculture Organization of the United Nations Near East and North.
LifeWatch developments and interaction with GBIF (nodes) Wouter Los.
The Preparatory Phase Proposal a first draft to be discussed.
ISBE An infrastructure for European (systems) biology Martijn J. Moné Seqahead meeting “ICT needs and challenges for Big Data in the Life Sciences” Pula,
FDES Meeting NYC 8-10 November 2010 The interface between core environmental statistics and other information systems: which interaction is important?
Confidencial © 2011 TECNALIA 1 TECNALIA. 2 Tecnalia R&I 1st. Research and Technology Organisation in Spain and 5th. in Europe.
IST SEWASIE SEWASIE 3rd Review March 14, 2005 SEWASIE Value Proposition and End User Demo Andreas Becks.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Hellenic Network for Biodiversity Research: HELBIONET HELBIONET – Questionnaire Training trip, Greece, April, February, 12-16, 2010 Proposal submitted.
Dimitris Koureas, PhD Natural History Museum London Linking layers of biodiversity data: Informatics challenges for the long tail research RDA - Long Tail.
Planning for Arctic GIS and Geographic Information Infrastructure Sponsored by the Arctic Research Support and Logistics Program 30 October 2003 Seattle,
Helix Nebula The Science Cloud CERN – 14 May 2014 Bob Jones (CERN) This document produced by Members of the Helix Nebula consortium is licensed under a.
EPOS a long term integration plan of research infrastructures for solid Earth Science in Europe Preparatory Phase Project
Design central EMODnet portal Objectives, Technical Proposal and Consultation Process.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
Legal issues of distributed research infrastructures RAMIRI2 Prague 2013.
A Decade of Working Together on Conservation & Sustainable Use of Canada’s Natural Assets CBS endorsed by FPT Ministers in April 1996 Federal, provincial,
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS A Edwards – ADC, Seattle, 2006 Slide 1 European Community RTD Framework Programmes ADC.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
LifeWatch E-Science and Observatory Infrastructure for Biodiversity & Ecosystem Science Olaf Bánki.
EPOS - Rome meeting, September 1 EC + ESFRI Recommendations Elisabeth Kohler CNRS-INSU.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
The AIACC Project Assessments of Impacts and Adaptations to Climate Change Neil Leary, AIACC Science Director AIACC Regional Workshop for Latin America.
Implementing a National Data Infrastructure: Opportunities for the BIO Community Peter McCartney Program Director Division of Biological Infrastructure.
EPOS IP Roadmap Massimo Cocco & PDB. EPOS IP project Timeline Implementation Validation Pre-operation.
Secretariat of the Pacific Regional Environment Programme Report from the Pacific region Presentation on regional context and SPREP activities-Dominique.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
The Global Scene Wouter Los University of Amsterdam The Netherlands.
Cultural Heritage in Tomorrow ’s Knowledge Society Cultural Heritage in Tomorrow ’s Knowledge Society Claude Poliart Project Officer Cultural Heritage.
EGI-Engage is co-funded by the Horizon 2020 Framework Programme of the European Union under grant number EGI vision for the EOSC Tiziana.
FROM PRINCIPLE TO PRACTICE: Implementing the Principles for Digital Development Perspectives and Recommendations from the Practitioner Community.
An Open Data Platform in the framework of the EGI-LifeWatch Competence Centre Fernando Aguilar Jesús Marco
12 th Meeting of the GBIF Participant Nodes Committee 6-7 October 2013, Berlin, Germany Data mobilization and use for international policy Olaf Bánki Senior.
State of the Global Change Grand Challenge Report to the Portfolio Committee on Science and Technology 15 September 2010.
Lesley Arnold Director Geospatial Frameworks Research Fellow Curtin University Spatial Infrastructures Consultant to the World Bank Mainstreaming Spatial.
Norman Morrison Senior Research Fellow, The University of Manchester Biodiversity Virtual e-Laboratory An e-Infrastructure and e-Science environment supporting.
12 th Meeting of the GBIF Participant Nodes Committee 6-7 October 2013, Berlin, Germany Towards a generic work programme for a Node Olaf Bánki Senior Programme.
Daniel Deybe – Ewald Pertlik DG RTD – I-1 Brussels – Jan 20, 2005
INTRODUCTION TO GENERATING SERVICES
Greater Peterborough Region DNA Cluster
INTAROS – Integrated Arctic Observation System
RDA WG on-farm data sharing IGAD / Barcelona
LifeWatch, costing and funding
Organising data to represent biodiversity
Euromarine – The Voice of Europe’s Marine Science Research Community
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
Citizen Science’s contribution to GEO BON
Caribbean Marine Atlas Phase 2 - CMA2
LifeWatch Cloud Computing Workshop
EMBRC - European Marine Biological Resource Center K. Deneudt, I. Nardello Pilot Blue Cloud Workshop March 28th, 2017 Brussels.
Brian Matthews STFC EOSCpilot Brian Matthews STFC
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
The approved ESPON 2013 Programme
Presentation transcript:

e-Science and Technology Infrastructure for Biodiversity and Ecosystem Research

Biodiversity Species (organisms and their populations) >10 7 species; species with 10 2 to individuals Genes and DNA 10 6 to 10 9 nucleotides in a DNA molecule Ecosystems habitats with 10 4 to 10 6 species, and manyfold interactions

X 1000 Estimated number of species ? Mostly insects

The big questions in biodiversity research Scale Ecosystems Species DNA, proteins and genes Time and evolution

? What are the impacts of changes in climate, pollution and land/sea-use on biodiversity How do changes affect the provision of ecosystem services Can we adapt to environmental change Where are the thresholds in ecosystem structures and functions How to manage multi-functional land/sea-scapes Which actions to ensure long-term sustainability

The biodiversity system is complex and cannot be described by the simple sum of its components and relations Experimentation on a few parameters is not enough: Limitations to scaling up results for understanding system properties LifeWatch adds a new technology to support the generation and analysis of large-scale data-sets on the biodiversity system. Find patterns and learn processes.

This defines an infrastructure with distributed observatories/sensors, interoperable databases, computational capability, and computational capacity. A single portal for researchers, policy makers, industries and public at large Find data and model to analyse statistical relationships Accelerate data capture with new technologies Structure the scientific community with new opportunities for large-scale projects

LifeWatch: an Analytical Platform supports research on biodiversity and ecosystem functioning from the gene up to the landscape level drives frontier science through fast and new technologies combines science and policy perspectives

Year 2013 Increasing worries about the effects of climate change on the invasion of pest insects. A researcher has an innovative plan to model the possible effects on food crops. This requires data sets from all over Eurasia and lots of computational capacity. Year 2014 Our researcher builds a LifeWatch virtual work space and attracts dozens of collaborators inventing additional functions. Data providers also jump in. Year 2015 Donors are starting a campaign for a funding programme. The researcher receives an important prize.

Genes Species Ecosystems Observatories Interoperability Analysis & modelling datafunctions Crucial resources

Architecture Resources E-Infrastructure Composition Users Collaboration Common Exploratory Environment Collaborative Virtual Organisations Data measurements, observations & sensors other infrastructures Statistical software Distributed computing power Analysis and processing Integration of resources Documented, shared workflows Grid computation Semantic metadata framework and workflow development

E-Infrastructure Composition Users Resources The LifeWatch research infrastructure

LifeWatch and GBIF: serving each other Resources E-Infrastructure Composition Users GBIF GBIF provides access to data (web services) LifeWatch supports its users to share their data through GBIF

Data access & interoperability Analytical tools Models Applications Data / resource providers LifeWatch Highway for analyses and use GBIF Data sharing on species, specimens and observations

Some examples of data, modelling and analysis capabilities Thematic Services Phylogenomics & Biogeography Taxonomy & Systematics Species Richness & Ecosystem Services Biodiversity Valuation Species Distribution Dynamics Genes-Species-Specimens (multi-scale linkages) Citizen Science & Observations Base Services General Services Geospatial Services Computational Resources Portal Server(s) Services and Tools Catalogue Provenance/citation repository Annotations repository Semantic Mediation Framework Operations Services Virtual Collaborative Environments Workflow management

Benefits and user groups Basic research Molecular biology Population biology Systematics Ecosystem research Systems biology Computation Economy Basic research Molecular biology Population biology Systematics Ecosystem research Systems biology Computation Economy Applied sciences Nature conservation & management Agriculture Fisheries Epidemiology Pharmacy Biotechnology Applied sciences Nature conservation & management Agriculture Fisheries Epidemiology Pharmacy Biotechnology Other communities EEA, Ministries and national agencies Engineering comp. Oil & mining industry Insurance Military Information Tech Other communities EEA, Ministries and national agencies Engineering comp. Oil & mining industry Insurance Military Information Tech

LifeWatch as a distributed research infrastructure Distributed entities “owned” by LifeWatch Distributed independent entities, but crucial for LifeWatch operations

Data networks LifeWatch Applications Analysis/ Modelling Data integration Data management Data generation (digitizing; sampling; sensoring Collection and observation networks Collection and observation networks LTER network and marine stations

Some partners in the ‘infrastructure grid’

initial decision final decision logistics construction The assumed Life Watch life cycle Earlier projectsConceptionPreparationsConstruction Operation & Evolution Political commitment Construction ‘blue print’ Critical !

Preparatory Phase Construction Phase Activities Time Preferred phase transition

Coord. Management Coord. Management Publicity & PR Publicity & PR Strategy Legal organisation Legal organisation Financial plan Financial plan Construction policy Construction policy Service plan Service plan Risk & Quality Control Preparatory project The Life Watch Preparatory Phase A Policy & Science Board oversees the project Countries Networks of Excellence

Countries Data networks User sectors Partnership in the preparatory project Scientific networks Executive participants Industry International infrastructures Contracted participants Other partners Status as per November countries: letter of support for the preparations Up to now, 11 countries selected LifeWatch for their national Road Map 7 of these will start consultations and negotiations Also interest from other continents

GovernanceProject Submission of ERIC Statutes Stakeholders Board meets Go/no-go for the Construction Master Plan in the public Critical mass to start early Constructions Early start of start-up organisation for the Construction Phase EC approves the Statutes End of the Preparatory Project Signatory event with Ministers 1st meeting Governing Board New LifeWatch organisation in place Additional countries join the LifeWatch ERIC 1st Operational services Target time line

Thank you