12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
Planning at CMM level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements Engineering.
EQUIPMENT VALIDATION.
1 sqa13b IEEE Standard for SQAP u IEEE Std –Standard for Software Quality Assurance Plans –12 pages u IEEE Guide for Software Quality Assurance.
How to Document A Business Management System
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Basic Principles of GMP
S/W Project Management
Introduction to Software Quality Assurance (SQA)
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
ITER In-Vessel Coils (IVC) Interim Design Review PDR Checklist Items C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3MAZCX.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 Configuration Management “The Cookbook Approach”
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
S Q A.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Version Advanced User Training. Instructions This training module contains additional key concepts that are an extension to the concepts in the.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
How the NCSX Project Does Business
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Fall 2010 Software Planning Guidelines.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
Accelerator Readiness Review October 31, 2006
Software Planning Guidelines
Module 8 Introduction to Validation
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
Engineering Processes
HART Technologies Process Overview
Ian Evans SSRL Safety Office
PSS verification and validation
DOE Review of the LCLS Project October 2006
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other

12/2/04Module 2D2 Purpose Provides overview indoctrination of several parts of the NCSX Engineering Web This module will focus on the last two parts of the NCSX Engineering Web Engineering Management & Systems Engineering Other Parts I–II and IV will provide overview indoctrination of the other parts of the NCSX Engineering Web Part I (Module 2A) – Work Planning & Project Control, Project Files, and Management Plans & Procedures Part II (Module 2B) – Specs, Design Criteria, & Statements of Work and Design Reviews, Analyses, and R&D Part III (Module 2C) – Design Data and Fabrication Assembly, and Installation & Test Plans Later modules to go into much further depth on how the NCSX Project will do business The NCSX Engineering Web is, to a major extent, the electronic NCSX filing system Exceptions are the models and drawings contained in the Pro/INTERALINK data base and the hard copy supplier and other PPPL documents stored in the PPPL Operations Center However – bulk of files stored electronically on this web

12/2/04Module 2D3 Engineering Management & Systems Engineering Engineering Mgmt & Systems Engineering Information Links Critical Issues Org Chart WBS Dictionary ECPs & ECNs Stellarator Info Electronic Signatures

12/2/04Module 2D4 Critical Issues As part of the WP process, risks are identified per ENG-032 processes when the WP is initiated Purpose of Critical Issues List is to identify near term risk items that have been identified and to track their status 3 Stages of Risk Mitigation 1 – risk identified but no mitigation plan formulated 2 – risk mitigation plan now formulated and being implemented 3 - risk retired

12/2/04Module 2D5 NCSX Organization Chart Overall Project and Engineering Organization Charts Color Coding Reflect Home Organization

12/2/04Module 2D6 WBS Dictionary Describes Scope of Project

12/2/04Module 2D7 ECPS and ECNs Links to Forms Link to Each ECP Details of Each ECP

12/2/04Module 2D8 Interface Control Scope Sheet are Interface Planning Documents ICDs Represent Formal Agreements Between WBS Managers on Interfaces

12/2/04Module 2D9 Electronic Signatures NCSX Utilizes Electronic Signatures for Majority of Project Documents/Drawings Requires Adobe Acrobat 5.0 or later Tabulation of Approved Electronic Signatures User can ensure that signature is valid

12/2/04Module 2D10 Other Information Links ES&H ACC Documents QA Conventions Stellarator Info Useful Links Training

12/2/04Module 2D11 ES&H NCSX ES&H Guidelines and Practices Goal Procedures and Best Practices Project Specific ES&H Documents Preliminary Hazards Analysis Environmental Assessement FONSI etc. Interesting Links Cryogenic Training Course

12/2/04Module 2D12 Activities Certification Committee (ACC) Documents ACC tasked with reviewing proposed new/modified facilities at PPPL This page captures pertinent information on ACC reviews of NCSX Charge Presentation material to ACC ACC Report Project Responses to ACC Report Tracking Log of ACC action items

12/2/04Module 2D13 Quality Assurance (QA) NCSX Project Specific QA Items Non-conformance Reports (info copies – originals in PPPL Ops Center) Audit Reports of NCSX Project Audit Reports Tracking Log of QA Audit Finding Action Items

12/2/04Module 2D14 NCSX Conventions Provides Conventions for the NCSX Project Coordinate System Defining Surfaces in Fourier Harmonics Defining Coil Geometry in Filament Formats Port Identification Scheme Naming Convention for Coil Filament Files Naming Conventions for Coils, Periods, etc.

12/2/04Module 2D15 Stellarator Information Useful Links to the World’s Other Stellarators

12/2/04Module 2D16 Useful Links Useful Sites on Fusion

12/2/04Module 2D17 Training Includes: Link to NCSX Training Plan Links to NCSX Task-Specific Manufacturing Training Matrices Links to NCSX Training Modules Link to PPPL Human Resources Department Training Page

12/2/04Module 2D18 Summary This introduction to the NCSX Engineering Web module has covered several parts of the NCSX Engineering Web Engineering Management & Systems Engineering Other Other introductory modules will cover the remaining parts of the NCSX Engineering Web Module 2A – Work Planning & Project Control, Project Files, and Management Plans & Procedures Module 2B - Specs, Design Criteria, Statements of Work and Module 2C - Design Data and Fabrication, Assembly, and Design Reviews, Analyses, and R&D Installation & Test Plans More detailed modules will focus in depth on key aspects of how the NCSX Project will do business