WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Slides:



Advertisements
Similar presentations
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Advertisements

Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
Ensure Vendor/Engineer of Choice Product Quality
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
New York State Department of Transportation
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Purchasing Overview. Fundamentals of Purchasing Procedures.
From Research Prototype to Production
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
UDOT I-15 The Point Design-Build Project
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Americas Interchange Proposal Evaluation Board of Directors Presentation February 26, 2010.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
US Army Corps of Engineers BUILDING STRONG ® Keys to a Successful AE Contract David Yankey, PE Chief, Army and Air Force Section Engineering Management.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Best Practices for Design Build Procurement
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
IQE.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Light Rail Transit Project
Construction Oversight
A New Quality Program for the Water Industry
Federal Acquisition Service
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Green Line Extension Project
Project Development Quality Program QA/QC – What does ODOT need?
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
OCPS CCNA SELECTION COMMITTEE TRAINING
Presentation transcript:

WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT

Agenda Why Design Build? Preliminary Engineering Project Goals Selecting a Design Build team Design Build Partnerships Design Build: Design and Construction Contact Administration Project Closeout WSDOT Design Build projects Questions

Why Design Build for WSDOT? Speed of delivery Resources Early price certainty Innovative delivery

Preliminary Engineering Design/Contract Development Preliminary/Conceptual Design –15% level of design –Cost estimates Right of Way Utilities Deviations Risk Agency/Stakeholder/Open Houses –Aesthetics and Noise walls

Project Goals (example)  Congestion Relief - Open the new northbound auxiliary lane to traffic as soon as possible and no later than December 31,  Excellent Quality - Meet or exceed technical quality requirements for design and construction through implementation of a clear and thorough Quality Management Plan.  Permit Compliance - Meet or exceed environmental requirements with no permit violations by adopting WSDOT’s permitting and environmental compliance standards.  Smooth Start-up - Maximize project development effectiveness through implementation of a well-planned start-up that ensures efficient delivery of the Project and begins construction as soon as possible.  Technical Approach - Utilize technical innovations that provide added value to the project.

Selecting a Design Build Team Request for Qualifications (RFQ) Selection process based on goals Shortlist 3 to 5 teams Reference Checks Philosophy in Scoring Evaluation Manual Debrief with firms

Selecting a Design Build Team Request for Proposal (RFP) Meetings with proposers Q and A’s ATC’s Confidentiality Addendums Quiet period Technical score and price

Calculating Best Value Proposal price - Technical score Lowest score is best value Team Price Technical Credits Score A $185,740, ,660,000 = 175,080,751 B $202,874, ,820,000 = 191,054,000 C $157,800, ,630,000 = 148,170,001 D $155,500, ,500,000 = 149,000,001

Design Build Partnership Keys to Success Co-location Formal and informal partnering Discipline task forces Shifting focus of the organization –Learning curve for everyone WSDOT has oversight

The Design Of Design Build Design Builder moves project from 15% conceptual plans to 100% RFC plans. Design Builder submits plan sets to WSDOT for review and comment (preliminary and final) – not approval Construction starts before design is complete, but not without RFC plans. Post design services – Process to get AS-built plans (RFI,FDC, NDC)

WSDOT - Roles and Responsibilities Design WSDOT owns Basic Configuration elements WSDOT provides oversight: Most review happens in Task Force meetings through “over the shoulder” reviews Ensure design meets the Contract Requirements / Mandatory Standards established Manage review comments and resolution; beware of preferences Do not direct work Management – tracking (doc. control) WSDOT provides design quality audits –DQMP WSDOT approves the design at the end of the project

The Construction of Design Build Quality Management Plan (QMP) Design Builder responsible for Quality Control (QC) and Quality Assurance (QA) –Quality Assurance must be independent from Quality Control –Quality Manager must report to non-production management WSDOT responsible for Quality Verification (QV) –Lab certification and tester qualifications –Testing asphalt –Fabrication inspection Environmental –WSDOT responsible for permitting –Design Builder responsible for compliance The Design Builder responsible for solutions to problems

Contract Administration Roles and Responsibilities Document control Materials/Record of Material Payment Change orders RFI/FDC/NDC (post design services) As-Builts Final Records

Project Closeout - Design Design Document Control Develop closeout plan at beginning of project Define requirements – Design deliverables For WSDOT: DDP/PF Importance of early engagement

WSDOT Design Build Projects 29 Design-build project to date starting in RACTS/default.htmwww.wsdot.wa.gov/biz/contaa/DESIGNBUILDCONT RACTS/default.htm

Questions? Phil Fordyce, P.E. (425)