MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

MKDV switch faults November V. Mertens L. Ducimetière with H. Bartosik, G. Bellotto, C. Boucly, P. Burkel, E. Carlier, D. Comte, S. Huon,
Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
PXI-Kicker Generator Control Jan Schipper TE-ABT-EC.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
Electrical & Control Power Supplies Trevor Hartnett.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Kicker generator and controls installation in ECA5? Etienne CARLIER
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
The Survey of the Power Supply Reliability at SSRF
Outcome of BI.DIS Fast Interlocks Peer Review
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
MKI Performance During 2016 and Plans for EYETS
Present Status and Future Plans for the MKE Kicker Magnets
M.J. Barnes : Canadian Involvement with LHC
Friday 15th June 01:11 Injection.
TE-ABT PLC and SCADA usage
the CERN Electrical network protection system
LHC Risk Review: Kicker Magnet Reliability
TCM PS – SPS Thyratron Power Trigger Consolidation
trigger and other general LBDS electronics
FCC-hh injection group 7
Initial Experience with the Machine Protection System for LHC
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
MKI Operational Experience and Future Plans
Tuesday 22 November 2011.
Interlocking strategy
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens & R. Rosol

One MKI System: 4 PFN’s & 4 Magnets LMC: August 9, 2011M.J. Barnes2 DS Tank MS Tank TDR RG220U cables to magnet RCPS Controls PFN (~5m) Inside a PFN: 2-way electrical delay 9µsUA23 / UA87 1 of 4 Magnets at Point 2 Kicker in vacuum tank

Schematic of an MKI System M.J. Barnes3 Protons Injection from SPS Thyratron can be triggered After resonant charging During resonant charging LMC: August 9, 2011

MKI2 MS3 Erratic on 16:30hrs  At 16:30:43hrs, on 28/7/2011, an erratic turn-on of MKI2 MS3 (Melton) at full PFN voltage;  Interlocks detected an MS erratic and correctly triggered MS’s and DS’s of system (within 2µs), emptying PFN via both ends. Hence all 4 kicker magnets pulsed for up to 4.5µs, emptying PFNs of energy.  Circulating beam was not in IP2 and therefore not disturbed.  Batch was extracted from SPS but saw no kick at MKI2 and went straight into the TDI. Note: this MS, Melton, was put in place during the last TS (July 2011) and has since made 5 erratics (only last 2 effected beam). 4.5µs 2µs MS3 erratic MS3 erratic, after resonant charging Charging current & PFN voltageCurrent in kicker magnet M.J. Barnes4LMC: August 9, 2011

MKI2 MS3 Erratic on 18:03hrs  At 18:03:09hrs, on 28/7/2011, an erratic turn-on of MKI2 MS3 (Melton) occurred during resonant charging – sending current to 1 of the 4 kickers (Note: it is unusual to have an erratic at such low voltage);  Interlocks did NOT detect erratic of MS3 (at 33kV): hence no immediate action was taken to turn-on other thyratrons. Therefore the full 9µs of PFN pulse length sent, via MS3, to kicker C.  Other 3 PFNs correctly discharged via the DS after 4ms (no further kicker magnet current);  The erratic occurred ~500µs into the charging process, and the extraction from the SPS was inhibited;  Circulating beam was swept over the aperture and protection elements (~17% of normal kick) for ~9µs. Erratic (untriggered) turn- on of MKI2 MS3 PFNs 1 & 2 at normal voltage (~50kV) PFNs 4 at low voltage (~33kV) because of MS3 erratic ~9µs circulating beam not dumped J. Wenninger M.J. Barnes5LMC: August 9, 2011

MKI Erratic Summary MS Melton (MKI2) erratics (total: ~12):  April 2010: SoftStart - 1.7kV above nominal  August 2010: SoftStart - 3? (1 1.7kV+ above nominal Normal Op – 3? (1 recorded) 2/9/2010: Melton replaced by Moulin  July 2011: Melton installed during TS of July 2011 (replacing Moulin) SoftStart – 3 ~40kV; 2kV above nominal) Normal Op – 2 (1 recorded) Melton replaced by Moulin on 29/7/2011 Other MKI2 Switch erratics since April 2010 (total: 6):  MS1 Millbrook: SoftStart - 3  MS3 Moulin: SoftStart – 2 & Normal Op – 1 (4/7/2011). Replaced by Melton during July 2011 TS. Moulin reinstalled 29/7/2011.  DS3 Doncaster: SoftStart – 1 MKI8 Switch erratics since April 2010 (total: 2):  MS2 Manchester: SoftStart – 1  DS2 Dagenham: SoftStart – 1 M.J. Barnes6LMC: August 9, 2011

MKI Summary of Investigations & Actions  After replacing MS Melton, and following two MS3 erratics and a further intervention (30/7/2011), the erratics have stopped (since 10 days) and the immediate danger of more erratics seems to be gone.  MS Melton brought back to lab. Current regulator on bias-board found to be damaged – supplying current corresponding to maximum of thyratron specification: this could increase rate of erratics.  Remote trending of current presently being implemented to allow possibility of remote diagnosis of this current regulator fault.  Long-term: fibre optic read-back to monitor thyratron G1 and bias-board.  Thyratron in MS Melton may be damaged – to be returned to E2V for diagnosis.  Spare MS from MKI8 now in lab for re-conditioning; can be used at Pt 2 or Pt 8.  Occasional missing G1 triggers to MS3 (5% to 10% missing) & MS4 thyratrons. This accounts for jitter noted (IQC) on MS3 & MS4.  Missing G1 accelerates wear of thyratron, hence may have contributed to quantity of erratics.  New trigger cards designed and built but not yet installed in MKI – but further investigations of cause are also required.  Long-term: detection of missing outputs of G1 power trigger unit.  Tests in UA23 have demonstrated that:  Erratic occurring after resonant charging is correctly detected;  Erratic occurring at 500µs into resonant charging was not detected.  Non-detection of MS erratics (thus no retriggering of other thyratrons) – High Priority  Inhibit/masking due to one or more modules or a noise-filter, in the erratic detection chain, may be responsible. Awaiting access, in the shadow of another intervention, to investigate further.  Low voltage fast interlock inhibition mechanism will be removed (implemented for the SoftStart) during next short TS.  May require further investigations ….. Bias-board M.J. Barnes7LMC: August 9, 2011 Thyratron