Interruption Update Liz Spierling Commercial Manager.

Slides:



Advertisements
Similar presentations
PROPOSED BUSINESS CORRIDOR ZONING DISTRICT Town of Middleton 2015.
Advertisements

Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
f has a saddle point at (1,1) 2.f has a local minimum at.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
Confidential DN Interruption Tenders 2008 Interruption Seminar Ofgem 19 th August 2008 Version 1.0 Final.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
Company name Company Presentation to …….. Date. 2 Company Background Information Company name; Founded Location Web page Owner and contact details Contact.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
DN Interruption Reform Gas Customer Forum Mark Freeman 10 March 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Time Zones The Earth’s Rotations How long does it take for the Earth to rotate once on it’s axis? Daylight on one side; nighttime on the other.
DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements Steve Edwards & Simon Trivella – 19 th August.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Mapping Skills Notes Unit 1. Compass Rose Symbol that shows the cardinal directions and orientation of a map.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
DN Interruption Reform (UNC Mod 90) Liz Spierling Commercial Manager, Transportation.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
Author/s Names Organization Details Contact / Numbers Presentation Title Planning Africa Conference July, 2016 | Sandton Convention Centre.
Branding: The Next Marketing Strategy
Why Should You Get Your Air Conditioning System Serviced Before Summer?
Benefits of Registering Your Trademark
Map Components & Types of Maps
Unlocking a low carbon gas future
Mapping Skills Notes Unit 1.
Transparency Project GRI NW Region
Winter Gardening Tips
Don't Forget to Tune up Your Furnace for Winter
Want to buy or sell a commercial business in Canberra?
GRI NW TRANSPARENCY PROJECT
Title Orientation Author Date Legend Scale
D I s , a ·.... l8l8.
Time Interval(Δt) Time (t) is a concept that describes when an event occurs. Initial time (ti) is when the event began. Final time (tf) is when the event.
2008 DN Interruption Tender
Unique Sites End to End Process Walkthrough
Simon Trivella – 26th April 2010 Gas Customer Forum, ENA
Zoning and Build Out Projections
Firm Frequency Response
DN Interruption Reform Transmission Workstream
I ll I
Time Interval(Δt) Time (t) is a concept that describes when an event occurs. Initial time (ti) is when the event began. Final time (tf) is when the event.
Changes to Reserve Level Declaration Guidelines
WWU Interruption Update
Publication of Zonal Flex Data
Questions for Consultation
' 1 A ./.\.l+./.\.l
SGN 2010 Annual Tender Interruption Requirements
EURELECTRIC transparency requirements
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Tony Pearson, Network Planning Manager
Provision of Interruption Information by DNOs to Transco NTS
Modification 501 slides for Workgroup
MP0131: Meter Error Notifications
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
DN Interruption Reform
Information Provision for Transitional Exit Capacity
Transmission Workstream DN Interruption Update - Introduction
Simon Trivella – 27th March 2009 Gas Customer Forum, Elexon
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream, 1 Mar 07
- '1:- bs? a ' I.
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Interruption Update Liz Spierling Commercial Manager

Interruption Requirements The following slides depict indicative interruption requirements for the 3 WWU LDZs Further detail of the postcodes within each zone will be published on our website The final numbers will be available ahead of the publication of the Interruption Requirements for the 2008 tender process.

Wales North and South LDZ Zones

Wales North Zone WWU Location IDWWU Location DescriptionWales North - IP Postcode Boundaries (outcodes) CH5, CH6, CH7, CH8 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 20 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 130,000 KWh

Wales North Zone WWU Location IDWWU Location DescriptionWales North Postcode Boundaries (outcodes) LL11, LL12, LL13, LL14, LL16, LL17, LL18, LL32, LL53, LL55, LL57, LL65, LL77, SY16, SY21, SY23 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 5 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 2,080,000 KWh

Wales South Zone WWU Location IDWWU Location DescriptionDyffryn Clydach Postcode Boundaries (outcodes) SA1, SA10, SA11, SA12, SA13 1**, SA14, SA15, SA2, SA31, SA4, SA48, SA5, SA6, SA61, SA62, SA7 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 15 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 6,200,000 KWh

Wales South Zone WWU Location IDWWU Location DescriptionDowlais Postcode Boundaries (outcodes) CF31, CF32, CF33, CF34, CF35, CF40, CF44, CF47, CF48, CF72, CF81, NP23, SA13 2** Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 15 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 6,430,000 KWh

Wales South Zone WWU Location IDWWU Location DescriptionNantgarw Postcode Boundaries (outcodes) CF10, CF11, CF14, CF15, CF23, CF24, CF3, CF37, CF38, CF5, CF62, CF63, CF64, CF83 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 15 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 7,060,000 KWh

Wales South Zone WWU Location IDWWU Location DescriptionGilwern Postcode Boundaries (outcodes) LD3, NP10, NP11, NP12, NP13, NP15, NP16, NP18, NP19, NP20, NP22, NP25, NP26, NP4, NP44, NP7, NP9 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 60 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 14,920,000 KWh

South West LDZ Zones

South West Zone WWU Location IDWWU Location DescriptionNorthern Postcode Boundaries (outcodes) BA1, BA2, BS1, BS10, BS11, BS12, BS16, BS18, BS2, BS20, BS22, BS23, BS24, BS25, BS27, BS32, BS34, BS35, BS37, BS40, BS5, BS7, BS8, GL1, GL10, GL11, GL12, GL13, GL14, GL15, GL16, GL2, GL20, GL3, GL4, GL5, GL51, GL52, GL53, GL54, GL56, GL7, HR9, OX18, SN1, SN2, SN3, SN5, SN6, SN8, TA5, WR10, WR11, WR12 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 10 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 11,870,000 KWh

South West Zone WWU Location IDWWU Location DescriptionCentral Postcode Boundaries (outcodes) BA10, BA12, BA13, BA14, BA16, BA20, BA21, BA3, BA4, BA5, BA7, BS14, BS3, BS30, BS31, BS4, SN10, SN12, SN13, SN14, SN15, TA1, TA2, TA20, TA23, TA24, TA3, TA6, TA7 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 15 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 8,100,000 KWh

South West Zone WWU Location IDWWU Location DescriptionAylesbeare Postcode Boundaries (outcodes) EX1 3**, EX13, EX14, EX15, EX16, EX2 7**, EX20, EX24, EX31, EX32, EX33, EX36, EX38, EX4 8**, EX5, EX8 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 10 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 1,800,000 KWh

South West Zone WWU Location IDWWU Location DescriptionSouthern Postcode Boundaries (outcodes) EX1 2**, EX2 5**, EX2 8**, EX4 4**, EX4 5**, PL1, PL11, PL14, PL15, PL17, PL2, PL21, PL24, PL25, PL26, PL31, PL4, PL5, PL6, PL7, PL8, TQ1, TQ11, TQ12, TQ2, TQ4, TQ5, TQ6, TQ9, TR1, TR12, TR15, TR8 Contract start date Contract end date Minimum number of interruptible days 5 Maximum number of interruptible days 15 Aggregate Interruptible Capacity Quantity required (SOQ) for 2011/12 9,010,000 KWh

Wales South Actual Interruption – Days

Wales North Actual Interruption – Days

South West Actual Interruption – Days

For further Interruption Reform Information Contact