Bongao DPP Bongao, Tawi-tawi

Slides:



Advertisements
Similar presentations
THROUGH THE TIDES : A GET-AWAY THROUGH THE PERFECT GATEWAY THROUGH THE TIDES : A GET-AWAY THROUGH THE PERFECT GATEWAY.
Advertisements

| 1 Anshan 2015 – A world leading low carbon District Heating system
Mindanao Development Report
WARAYS & MUSLIMS By group 6D.
Finding Harm’s Way (Mapping Disaster Risk in the Philippines) Department of Environment and Natural Resources Manila Observatory 14 April 2005.
CONFLICT IN MINDANAO Root Causes and Status ABHOUD SYED M. LINGGA Institute of Bangsamoro Studies Asia DCHS Regional Workshop on “Towards Liberating Democracy:
Coping with Food Crisis and Climate Change: Grassroots Experiences and Best Practices Chito P. Medina Farmer-Scientist Partnership for Development (MASIPAG),
Electric Rates and Standby Charges Presented by: Cheryl Eakle – KPPC Jason Volz – Harshaw Trane August 13, 2014.
City of Fort Collins, CO RDSI Secure Microgrid Demonstration Project 2013 National Town Meeting on Demand Response and Smart Grid July 11, 2013 Washington,
Solar Energy : Here Comes the Sun!!! June 28, 2012.
The Need for an Energy Grid in the Maldives
Humanitarian Efforts to Lessen Poverty of Underprivileged Children in the Philippines The H.E.L.P. Foundation Providing Hope and Opportunity H.E.L.P. Foundation.
The urban revolution in the philippines Reported by: Brittany A. Gomboc III-6BEED.
HYDROPOWER GENERATION IN MEXICO Jose A. Raynal-Villasenor, Ph. D. Department of Civil and Environmental Engineering Universidad de las Americas, Puebla.
TIME OF USE RATES AT THE UNITED ILLUMINATING COMPANY Presented at: Connecticut’s Energy Future December 2, 2004 James D. Lundrigan Pricing Manager The.
WWF Philippines Projects in Mindanao Convergence Meeting of Environment Development Partners 17 June 2015 Davao City Mindanao Development Authority.
Enhancing LGU Capacity on DRRM and CCA
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
IBM eMentor Scholarship Program in Mindanao TERESITA MEDADO 07 September 2006 Strategic Partnerships for Effective ICT Use in Education.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
LESSONS LEARNED FROM PAST NOTABLE DISASTERS. THE PHILIPPINES
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
IMMIGRATION INTELLIGENCE RISK ASSESMENT of THE SULU SEA REGION JEROME T. GABIONZA Deputy Chief / Head Operations Intelligence Division Bureau of Immigration.
Office of Environment, Energy and Climate Change
Update on the New CNS/ATM Systems Development Project
“Transparency and good governance must be measured. By providing metrics and explaining the clear paths to achieve excellence in local governance, we.
Prospect and Perspective of the Seaweed Industry for Building Capacities of Local Communities to Cope with Globalization Seaweed Industry Association.
Community-based Renewable Energy towards Sustainable Grassroots Communities Engr. Nazario R. Cacayan Executive Director Yamog Renewable Energy Development.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Renewable Energy.
ACCOMPLISHMENT REPORT
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
© Energy Storage: Addressing Today’s Grid Challenges for Tomorrow’s Energy Demands Brad Roberts Power Quality Systems Director S&C Electric.
AGUS & PULANGI HYDROELECTRIC PLANT COMPLEXES Flash Point of Profitization of Human Rights.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Catanduanes, Philippines Lower Dugui Mini Hydro Power Plant.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
Mindanao and the Bangsamoro: Prospects for Peace.
OIL PALM OPPORTUNITIES IN ARMM
Technology Estimate Exercise Sagip Basilan. INFRASTRUCTURE SUBSYSTEM.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.
Davao City Chamber of Commerce and Industry, Inc. (DCCCII) Presentation for: Visit of MR. Derek Page Unit Chief, Trade and Promotion, British Embassy May.
Training Course on Basic Statistics for Research August 24-28, 2009 STATISTICAL RESEARCH AND TRAINING CENTER J and S Building, 104 Kalayaan Avenue, Diliman,
RUBY POSSIBLE AFFECTED AREAS. 8AM December 2, 2014 CRITICAL AREAS ALERT LEVEL PROVINCESPOTENTIAL IMPACTS ALERT LEVEL “C” RAIN > mm/hr Heavy to.
Nutriskwela Community Radio Network Program UPDATE
FINDING THE RIGHT FIX AND THE RIGHT MIX TO THE SOUTHERN PHILIPPINE PROBLEM, AFFECTING THE BANGSAMORO PEOPLE By: ATTY. JOSE I. LORENA August 25, 2009 UP,
SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.
Rebellion, political violence, and shadow crimes in the Bangsamoro: BCMS General Report PINGO Forum International Alert UK : Philippine Programmes.
World War II Leyte Gulf/Luzon October 44 – April 45.
Location Allowance Components Salary Administration- HDBP LifeBank Foundation, Inc August 6, 2013.
PHILIPPINE OBSTETRICAL AND GYNECOLOGICAL SOCIETY
(Source: NEDA PowerPoint presentation) Convergence areas and strategies of the Updated Philippine Development Plan
G O O D D A Y Climate Information in Sorsogon PAGASA-DOST
WBPDCL An overview.
University of Asia and the Pacific
PVM Electric Cooperatives
Understanding History
Autonomous Region in Muslim Mindanao (ARMM)
MAGNITUDEOFTHECOCONUTINDUSTRY Volume of Production for Coconut, by Region July-September: and October-December:
2016 LGU ROADSHOW.
SEYCHELLES Energy Overview Statistics Chaminuka Lodge Zambia
Proposed Services of the MSC (Interim and Spin-off) Name of Companies interested in the Service Number of Companies % of Sample 1.0 Project Development.
MAPPING GEOPHYSICAL HAZARDS AND RISKS IN THE PHILIPPINES
MAPPING CLIMATE/WEATHER RELATED HAZARDS AND RISKS IN THE PHILIPPINES
M7.6 EARTHQUAKE STRIKES 140 KM FROM SAMAR PROVINCE ON EAST COAST OF THE PHILIPPINES 34 KM DEEP 8:47 PM AUGUST 31, 2012 Walter Hays, Global Alliance.
ATM PAYROLL IMPLEMENTATION IN DepED. ATM PAYROLL IMPLEMENTATION IN DepED.
1,000 MWH Selected Installations Off-Grid | Remote Off-Grid | Remote
Mindanao’s State of Poverty & Human Security: A Situationer.
Anna Garcia Air Innovations Conference August 2004
Comparison: Ginna 480 MW Installed PV Power as of the end of 2005
Presentation transcript:

Bongao DPP Bongao, Tawi-tawi Installed capacity – 2 x 544 perkins genset Back-up for pb108, (7.2MW) Peak demand - 2.6 MW (grid total)

Manuk Mangkaw DPP Tawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

Sacol DPP Sacol Island, Zamboanga City Installed capacity – 1 x 163 kw perkins Peak demand – 155kw 6 hours operation Plant turn over to NPC SPUG from city government of Zamboanga City

Sibutu Dpp Tawi-tawi Province Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

West Simunul DPP Tawi-tawi Province Installed capacity – 2 x 54 kw visa, 1 x 260 kw perkins Peak demand – 220 kw 6 hours operation

TANDUBANAK DPP Taunguh, Sibutu Island Unit no. 1, 1 x 280 kw Cummins Gensets Unit no. 2, 1 x 160 kw Cummins Gensets 6 hours operation, peak load 80 kw

Sitangkay DPP Tawi-tawi Province Installed capacity – 2 x 280 kw cummins Started commercial operation – August 22, 2009

Basilan DPP Isabela City, Basilan Province Installed capacity – 1 x 1224 kw CKD, 1 x 448 kw CKD Back up units for PB 119, 7.2 MW Rented units 2 x 1000kw, 1 x 600 kw caterpillar units are stationed here. Peak system demand – 6.200 MW

Siasi Dpp Siasi, Sulu Installed capacity – 2 x 500 kw MAN, 2 x 560kw perkins, 2 x 260 kw perkins Peak demand – 680 kw 20 hours operation

Luuk DPP Camp Andres, Luuk, Sulu Installed capacity – 1 x 175 kw cat, 1 x 54 kw visa Peak demand – 225 kw 6 hours operation

Manuk Mangkaw DPP East Simunul, Tawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

Jolo DPP Jolo, Sulu Installed capacity – 3 x 1.8 MW daihatsu Peak demand – 4.622 MW 24 hours operation Rented back up 1 x 1000kw, 1 x 1,500kw caterpillar

Mapun DPP Cagayan de Tawi-tawi Installed capacity – 2 x 260 kw perkins, 1 x 500 kw MAN Peak demand – 350 kw 10 hours operation

Sibutu DPP Sibutu island, Tawi-tawi Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

Balimbing DPP Panglima Sugala, Bato-bato, Tawi-tawi Installed capacity : 2 x 163 kw Perkins, 2 x 150 kw Cummins 8 hours operation, 5:00pm to 1:00am

Power Barge 108 Bongao, Tawi-tawi Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 2.600 kw 24 hours operation Backed up by land based plant

Power Barge 119 Isabela City, Basilan Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 6.200 MW 24 hours operation Backed up by land based plant and rented units

TANDUBAS DPP

SPUG MINDANAO Eastern Mindanao Area Total system capacity – 9. 690 KW

Palimbang DPP sultan kudarat Installed capacity – 1 x 54 kw visa Peak demand – 48 kw 6 hours operation

Dinagat DPP (new PH) San Jose, Dinagat Island Installed capacity – 5 x 275kw cumper, 2 x 260kw perkins, 1 x 364kw 1 x 163kw perkins Peak demand – 1.220kw 18 hours operation

Loreto DPP Dinagat Island Installed capacity – 2 x 220 kw ckd, 1 x 500 kw MAN Peak demand – 290 kw 8 hours operation

Talicud Dpp Davao del Norte Installed capacity – 2 x 163 kw perkins Peak demand – 160 kw 10 hours operation

Kalamansig DPP Sultan Kudarat Installed capacity – 5 x 260 kw perkins, 1 x 220 kw ckd, Peak demand – 1.800 kw 24 hours operation, backed up by PB 111

Abad Santos DPP Caburan, Davao del Sur Installed capacity – 1 x 163kw perkins, 1 x 260 kw perkins Peak demand – 210 kw 10 hours operation

Balut DPP Sarangani, Davao del Sur Installed capacity – 2 x 163 kw perkins Peak demand – 120 kw 8 hours operation

Hikdop DPP Hikdop, Surigao del Norte Installed capacity – 2 x 163 kw perkins Peak demand -95 kw 7 hours operation

Power Barge 111 Lebak, Sultan Kudarat Installed capacity – 4 x 560 kw perkins Peak demand – grid total 1.800 kw 24 hours operation Back up power of land based plant.

Ninoy Aquino DPP Sultan Kudarat Installed capacity – 2 x 163 kw perkins Peak demand – 230 kw 12 hours operation

Thank you PERFORMANCE GROUP courtesy of: OMAR C. ANTOCAN MARVIN L. MADJAD RALPH P. ANTONIO