CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

1 CE Project Engineering (Construction Engineering and Project Management) Dr. M.D. Haug, P.Eng. University of Saskatchewan 2006.
Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
PROPOSALS and PERSUASION A Guide for Creating Effective Proposals Based on Anderson, Paul V. Technical Writing: A Reader-Centered Approach, and Markel,
Chapter 3 Project Initiation
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Report Writing Three phases of report writing Exploratory phase (MAPS)
Collaborative Report Writing the Proposal. Definition Proposal: a document written to convince your audience to adopt an idea, a product, or a service.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
SOFTWARE DEVELOPMENT DOCUMENTATION. INTRODUCTION Documentation can be tied into the entire software development cycle. Unfortunately, documentation is.
Project Management Lecture 5+6 MS Saba Sahar.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
POSITIONVACANCIESREQUIREMENTS Project Engineer1 Must possess at least Degree in engineering or equivalent. Good interpersonal and communication skills,
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Directorate-General for Translation EUROPEAN COMMISSION Tendering for EU projects – Why and how? London, 25 September 2008 Klaus Ahrend Head of Unit S.2.
Business Communication: Process and Product, 6e Mary Ellen Guffey Copyright © 2008 Chapter 12 Informal Business Reports.
RESEARCH METHODS Lecture 44. REPORT WRITING Every report is custom-made, yet some conventions of format. Many companies and universities also have in-house,
Process Modeling CS 4320 Fall Process Difficulties SW not a production line Each project is different—even within the same company No universally.
EE x12 Technical Reports Writing Lecture 7
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
Project Report. Suggested TOC Executive Summary Project Background and Assumptions Vision and Mission Statements Objectives SWOT Analysis Recommended.
PITFALLS IN DEALING WITH TENDERS &CONTRACTS Shiv Kumar Director/IRICEN.
provide information Best Practice Template Experiences in Austria Wolfgang Bittermann Directorate Spatial Statistics Canberra 2 May.
Writing Effective Proposals Professional Communication for Engineers.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Proposal Write proposal must understand what your reader wants and use the proposal to propose an action to be performed by your company.
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
Forum on Risk Management and Internal Control in the EU PATRICE MARTEAU Secretary General October 25th, 2005.
LHC Quality Assurance Working Group - M. Mottier September 2000.
IFS310: Module 7 Business Requirements Statement Interpersonal Skills and Communications.
Communicating Marketing Research Findings Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
“Working With A Technical Editor” by Jean Hollis Weber Presented by: Paul Rattray July 2, 2007.
Technology Department WP2 Progress Report Th. Otto
TECHNICAL WRITING October 10 th, Letters of Application (Cover Letters) The letter of application is a cover letter you send to a prospective employer.
Communicating Marketing Research Findings
 Ensure the title is in line with the requirements of the proposed funding agency if they have any specification for the titled page (some do have.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Writing Research Proposals and Research Reports Meeting 8.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
Responding to Invitation to Tenders Michael Fowler Category Manager – Procurement Brian Davies Senior Procurement Officer.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
Role of The Software Development Plan (SDP)
Software Quality Control and Quality Assurance: Introduction
Report Writing Three phases of report writing Exploratory phase (MAPS)
Evaluation Grids Evaluation Grids.
Writing research/lab reports in engineering
Report Writing.
Low temperature chiller Market Survey
Chapter 13 Proposals, Business Plans, and Formal Business Reports
Head of Recognition and Approval
Industrial Purchasing System A method used by businesses to buy products and/or services. A purchasing system manages the entire acquisition process, from.
Summarizing Information at Work
The Intern
GPP Training Toolkit An Introduction European Commission
Welcome to Cyber Recruiter – Creating & Posting Requisitions
Summarizing Information at Work
Internal Audits Management Review Meetings
Software Reviews.
Radiopharmaceutical Production
TECHNICAL REPORTS WRITING
Presentation transcript:

CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE

BACKGROUND n Established in 1998 by the DL n WHY? uPlenty of professionally young engineers in the division that may need assistance in writing technical documents uST division is mainly French speaking but many CERN documents are nowadays written in English n To assure the quality of the ST- division technical documents

APPROVAL CIRCUIT n GROUP SECRETARY DIVISION SECRETARY READER WRITER SPL, LHC, translation etc.

GUIDELINES 1/2 n MARKET SURVEY u Clear scope of the supply in the technical description, not too much technical details but rather an overview of the supply u Qualification criteria states the conditions to be fulfilled by companies that will be eligible to receive the call for tender following the MS u Questionnaire verifies the requirements given in the qualification criteria

GUIDELINES 2/2 n CALL FOR TENDER u Introduction u Scope of the project u Technical Description u Limits of the supply u Rules and standards u Quality requirements u Procedures before awarding the contract u Execution the contract u Tests/Inspection u Schedule u Relevant annexes u Possible questionnaire

CONCLUSIONS n By the end of 1999, 157 documents had gone through the circuit (+ 40 translations) n Improved quality regarding structure and readability n By now the procedure is well known and operates faster than in the beginning n Need for ST guidelines n Can be recognized as an ST quality assurance procedure