4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman CERN Site Report HEPNT/HEPiX October 1999 SLAC Alan Silverman CERN/IT/DIS.

Slides:



Advertisements
Similar presentations
The RHIC-ATLAS Computing Facility at BNL HEPIX – Edinburgh May 24-28, 2004 Tony Chan RHIC Computing Facility Brookhaven National Laboratory.
Advertisements

HEPiX Meeting Wrap Up Fall 2000 JLab. Meeting Highlights Monitoring –Several projects underway –Collaboration of ideas occurred –Communication earlier.
LAL Site Report Michel Jouvin LAL / IN2P3
CASTOR Project Status CASTOR Project Status CERNIT-PDP/DM February 2000.
12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall SLAC.
K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Automating Linux Installations at CERN G. Cancio, L. Cons, P. Defert, M. Olive, I. Reguero, C. Rossi IT/PDP, CERN presented by G. Cancio.
Mass RHIC Computing Facility Razvan Popescu - Brookhaven National Laboratory.
HEPIX 3 November 2000 Current Mass Storage Status/Plans at CERN 1 HEPIX 3 November 2000 H.Renshall PDP/IT.
31/10/2000NT Domain - AD Migration - JLab 2000 NT DOMAIN - ACTIVE DIRECTORY MIGRATION Michel Jouvin LAL Orsay
10 Years of Scientific Linux HEPiX Spring 2014, LAPP, Annecy Alan Silverman (CERN, retired)
CERN - European Laboratory for Particle Physics HEP Computer Farms Frédéric Hemmer CERN Information Technology Division Physics Data processing Group.
Site report: CERN Helge Meinhard (at) cern ch HEPiX spring CASPUR.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
LAL Site Report Michel Jouvin LAL / IN2P3
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
Nov 1, 2000Site report DESY1 DESY Site Report Wolfgang Friebel DESY Nov 1, 2000 HEPiX Fall
Large Scale Parallel Print Service Ivan Deloose – David Foster – Ignacio Reguero CHEP 2000 – 8 February 2000 – Padova (I) Presented by Ivan Deloose -
W.A.Wojcik/CCIN2P3, May Running the multi-platform, multi-experiment cluster at CCIN2P3 Wojciech A. Wojcik IN2P3 Computing Center
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
CERN IT/IA/MI HEPiX RAL 99 14th April CERN Messaging Infrastructure Status and next steps Arnaud Taddei HEPiX RAL April 1999.
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
20-22 September 1999 HPSS User Forum, Santa Fe CERN IT/PDP 1 History  Test system HPSS 3.2 installation in Oct 1997 IBM AIX machines with IBM 3590 drives.
21 st October 2002BaBar Computing – Stephen J. Gowdy 1 Of 25 BaBar Computing Stephen J. Gowdy BaBar Computing Coordinator SLAC 21 st October 2002 Second.
6/26/01High Throughput Linux Clustering at Fermilab--S. Timm 1 High Throughput Linux Clustering at Fermilab Steven C. Timm--Fermilab.
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
F. Rademakers - CERN/EPLinux Certification - FOCUS Linux Certification Fons Rademakers.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
LAL Site Report Michel Jouvin LAL / IN2P3
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
HEPiX Meeting Summary Autumn 2000 Jefferson Laboratory, Newport News, Virginia, USA.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility (formerly CEBAF - The Continuous Electron Beam Accelerator Facility)
8 October 1999 BaBar Storage at CCIN2P3 p. 1 Rolf Rumler BaBar Storage at Lyon HEPIX and Mass Storage SLAC, California, U.S.A. 8 October 1999 Rolf Rumler,
Test Results of the EuroStore Mass Storage System Ingo Augustin CERNIT-PDP/DM Padova.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
IDE disk servers at CERN Helge Meinhard / CERN-IT CERN OpenLab workshop 17 March 2003.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
RAL Site report John Gordon ITD October 1999
Cluster Configuration Update Including LSF Status Thorsten Kleinwort for CERN IT/PDP-IS HEPiX I/2001 LAL Orsay Tuesday, December 08, 2015.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
14 th April 1999CERN Site Report, HEPiX RAL. A.Silverman CERN Site Report HEPiX April 1999 RAL Alan Silverman CERN/IT/DIS.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
Randy MelenApril 14, Stanford Linear Accelerator Center Site Report April 1999 Randy Melen SLAC Computing Services/Systems HPC Team Leader.
LAL Site Report Michel Jouvin LAL / IN2P3
RHIC/US ATLAS Tier 1 Computing Facility Site Report Christopher Hollowell Physics Department Brookhaven National Laboratory HEPiX Upton,
Lisa Giacchetti AFS: What is everyone doing? LISA GIACCHETTI Operating Systems Support.
CERN - European Organization for Nuclear Research Windows 2000 Update FOCUS June 13 th, 2002.
W.A.Wojcik/CCIN2P3, Nov 1, CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center URL:
CNAF Database Service Barbara Martelli CNAF-INFN Elisabetta Vilucchi CNAF-INFN Simone Dalla Fina INFN-Padua.
1/11/2000LAL Site Report - HEPix - JLab 2000 LAL Site Report HEPix – Jlab Nov Michel Jouvin
1 Update at RAL and in the Quattor community Ian Collier - RAL Tier1 HEPiX FAll 2010, Cornell.
CERN IT Department CH-1211 Genève 23 Switzerland t The Tape Service at CERN Vladimír Bahyl IT-FIO-TSI June 2009.
Oct. 6, 1999PHENIX Comp. Mtg.1 CC-J: Progress, Prospects and PBS Shin’ya Sawada (KEK) For CCJ-WG.
W.A.Wojcik/CCIN2P3, HEPiX at SLAC, Oct CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center URL:
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE7029 ATLAS CMS LHCb Totals
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Bernd Panzer-Steindel CERN/IT/ADC1 Medium Term Issues for the Data Challenges.
Large Scale Parallel Print Service
Overview – SOE PatchTT November 2015.
PC Farms & Central Data Recording
Transarc AFS Client for NT
Short to middle term GRID deployment plan for LHCb
HEPix - SLAC 99 Michel Jouvin
Presentation transcript:

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman CERN Site Report HEPNT/HEPiX October 1999 SLAC Alan Silverman CERN/IT/DIS

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Central service : major overhaul of all servers, O/S upgrades, Y2K fixes, disc+memory upgrades MSmail migration completed 4 months ahead of target Still recommend Netscape but every new version has its share of new bugs New Listbox service, still based on Majordomo, major cleanup, many huge lists Spam mail an ongoing problem; averages 10K mails rejected daily with peaks 3-4 times higher

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman LDAP New LDAP server from the Sun/Netscape alliance was chosen. New schema being implemented (much richer) Meeting with IN2P3 and LAL at Lyon last week A successful US trip - could be useful for other sites mailwww.cern.ch/documents/officials/ustrip99.html –in particular a clear status on the Sun/Netscape alliance (which is really working in practice) –interesting presentations by Mirapoint

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman AFS AFS transferred to PDP Group Buying more Intel PCs as servers and looking at using Linux as O/S, at least for scratch space Plans for moving to Transarc Linux on PCs and AFS 3.5 everywhere –all new Linux clients use Transarc’s AFS 3.5 –first file servers moving to 3.5 –clients and database servers will stay 3.4 till at least end-year –a few problems seen with 3.5 but not serious

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Linux Current CD distribution based on Redhat 5.1; pressure for Redhat 6 (kernel 2.2 features wanted) Physics usage rising rapidly - more physics groups “retreating” from NT Linux project getting underway: start from scratch - if Linux is the only UNIX being developed, would we need tools like SUE for example? Kickstart server in production use, >160 clients (mainly Comp Centre and LHCB exp.)

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman UNIX Year 2000 web pages (versions, patches, etc) //nicewww.cern.ch/~favrot/year_2000.htm Prelim plans to freeze all non-Linux UNIXs met considerable resistance; freeze = ?? Discussions continue but only PCs (and some SUNs) are being bought by physicists Installed StarOffice on Linux and Solaris; Redhat 6+AFS problem; how compatable with Msoffice? Support issues?

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Windows Plans New NICE team manager (F.Hemmer) Agreed to skip Windows 98, update Windows 95 instead and complete the NT4 offering under NICE Windows 2000 as a NICE client soon (1-2 months?) after release; pilot working now Windows 2000 architecture group started

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Printing Central printer servers, with fail-over Based on lpr protocol, both UNIX and Windows 1200 queues, 14K jobs per day, 7GB per day User-friendly interfaces (Print Wizard on NICE, Xprint on UNIX, web-based Java interface also) Almost all Springer queues now switched Tools being put (back) in the public domain

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman PC Supply Managed to keep the same base configuration for 9 months and with lowering prices - is this a record Now in market survey for new supplier, will soon issue a call for tender Supplier relationship more important than price of any given configuration

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Outsourcing Desktop Contract started January 1st, based on service levels Still a lot of learning to do on all sides but mostly on the CERN side! Experiments have agreed to merge in over 2 years Contract seems to be working but no performance figures to prove it yet

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Problem Report Mgmt System Chose Remedy, the market leader (or at least one of) Implementation is non-trivial and we are late, no performance figures yet With its licences, fully-configured servers with lots of disc space and consultants to help, Remedy is not a cheap solution Plans to help experiments delayed

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Networking Central Data Recording using Gigabit networking for all exps, >40MB/sec PDP/CORE servers moved to Fast Ethernet (1000 nodes) or Gigabit Ethernet (50 nodes) First deployment of 100BaseT on desktops

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Batch Systems PCs, PCs, PCs. We expect +100 in the coming 4-6 weeks alone First interactive Linux cluster coming online; will move to Redhat 6.0 and AFS 3.5 very soon Starting a new monitoring project in order to be able to manage 100s (1000s?) of PCs Tests of IDE discs for servers; may be too early for next purchases but interesting

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Central Data Recording CDR again very successful this year; major experiment was again NA TB of raw data with an average of 20 MB/s (45 MB/s peak), 2400 Redwood STK tapes. Large Online/Oflline LINUX PC farm (70 PCs) Plus CDR for 20 test beams (ATLAS, CMS, ALICE, L3C) mainly using HPSS, 3 OBJECTIVITY setups, several TB of data Next are NA45 (30-40 MB/s), NA49 (16 MB/s) and preparations for COMPASS (35 MB/s)

4-8 th October 1999CERN Site Report, HEPiX SLAC. A.Silverman Tapes Fourth STK silo, now 32 drives including 4 for HPSS Redwood servers now based on Linux except for the HPSS servers CASTOR - attend Tony Cass’s progress report later in the week