NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task

Slides:



Advertisements
Similar presentations
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
Osaka, 25/07/04NuFACT’04 - Beta Beam R&DM. Benedikt 1 BETA-BEAM R&D in EUROPE Michael Benedikt AB Department, CERN on behalf of the Beta-Beam Study Group.
 RNB 6The beta-beam study group The Beta-beam Mats Lindroos on behalf of the The beta-beam study group.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
NuFact'06, Aug. 2006A. Fabich, CERNRadioactive Ion Beams, 1 Radioactive Ion Beams A. Fabich, CERN on behalf of the Beta-beam Study Group
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
TRACKING AND PARTICLE- MATTER INTERACTION STUDIES IN THE BETA-BEAM DECAY RING E.Wildner, A. Fabich (CERN) Common EURISOL DS - EURONS Town Meeting Helsinki,
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
J. Bouchez CEA/DAPNIA NuFact 03 June 5,2003 BETA BEAMS : design update and physics reach Physics motivation Recent progress on design Expected performances.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Status of the magnet studies in the ARCS (FLUKA)
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
J-PARC main ring lattice An overview
A.Lachaize CNRS/IN2P3 IPN Orsay
The beta-beam Mats Lindroos CERN GSI, 17 January 2005 Mats Lindroos.
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Alternative/complementary Possibilities
Options and Recommendations for TL and Dumps
b-beams: R&D Challenges in FP7
Status of the beta-beam study
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
Status of the beta-beam study
Superbeams with SPL at CERN
Beta beam R&D status Elena Wildner, CERN on behalf of
The EURISOL Beta-beam Steven Hancock
Progress towards Pulsed Multi-MW CERN Proton Drivers
CEPC Injector Damping Ring
Status of the BETA-BEAM Task within the EURISOL Design Study
Negative Momentum Compaction lattice options for PS2
Joint session – Beta-beams
Kicker and RF systems for Damping Rings
Negative Momentum Compaction lattice options for PS2
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task

NUFACT05 2 Outline Beta-beam –First study in 2002: ion choice, main parameters –Ion production –Asymmetric bunch merging for stacking in the decay ring –Decay ring optics design & injection The EURISOL DS Challenges for the Beta-beam R&D Conclusions

NUFACT05 3 Introduction to beta-beams Beta-beam proposal by Piero Zucchelli –A novel concept for a neutrino factory: the beta-beam, Phys. Let. B, 532 (2002) AIM: production of a pure beam of electron neutrinos (or antineutrinos) through the beta decay of radioactive ions circulating in a high- energy (  ~100) storage ring. First study in 2002 –Make maximum use of the existing infrastructure.

NUFACT05 4 Beta-beam Neutrino Source Decay Ring Ion production ISOL target & Ion source Proton Driver SPL Decay ring B  = 1500 Tm B = 5 T C = 7000 m L ss = 2500 m 6 He:  = Ne:  = 60 SPS Acceleration to medium energy RCS PS Acceleration to final energy PS & SPS Experiment Ion acceleration Linac Beam preparation Pulsed ECR Ion productionAccelerationNeutrino source

NUFACT05 5 Main parameters Factors influencing ion choice –Need to produce reasonable amounts of ions. –Noble gases preferred - simple diffusion out of target, gaseous at room temperature. –Not too short half-life to get reasonable intensities. –Not too long half-life as otherwise no decay at high energy. –Avoid potentially dangerous and long-lived decay products. Best compromise –Helium-6 to produce antineutrinos: –Neon-18 to produce neutrinos:

NUFACT05 6 FLUX The first study “Beta-beam” was aiming for: –A beta-beam facility that will run for a “normalized” year of 10 7 seconds –An annual rate of anti-neutrinos ( 6 He) and neutrinos ( 18 Ne) at  =100 with an Ion production in the target to the ECR source: 6 He= atoms per second 18 Ne= atoms per second The often quoted beta-beam facility flux for ten years running is: –anti-neutrinos: decays along one straight section –Neutrinos: decays along one straight section

NUFACT05 7 Ion production - ISOL method Isotope Separation OnLine method. Few GeV proton beam onto fixed target. 6 He via spallation n 18 Ne directly

NUFACT He production from 9 Be(n,  ) Converter technology preferred to direct irradiation (heat transfer and efficient cooling allows higher power compared to insulating BeO). 6 He production rate is ~2x10 13 ions/s (dc) for ~200 kW on target. Converter technology: (J. Nolen, NPA 701 (2002) 312c)

NUFACT Ne production Spallation of close-by target nuclides – 24 Mg 12 (p, p 3 n 4 ) 18 Ne 10. –Converter technology cannot be used; the beam hits directly the magnesium oxide target. –Production rate for 18 Ne is ~ 1x10 12 ions/s (dc) for ~200 kW on target. – 19 Ne can be produced with one order of magnitude higher intensity but the half-life is 17 seconds!

NUFACT05 10 Producing 18Ne and 6He at 100 MeV Work within EURISOL task 2 to investigate production rate with “medical cyclotron” –Louvain-La-Neuve, M. Loislet

NUFACT GHz « ECR Duoplasmatron » for gaseous RIB Very high density magnetized plasma n e ~ cm – 3.0 T pulsed coils or SC coils GHz / KW 10 –200 µs / = 6-3 mm optical axial coupling optical radial (or axial) coupling (if gas only)  1-3 mm 100 KV extraction UHF window or « glass » chamber (?) Target Rapid pulsed valve ? 20 – 100 µs 20 – 200 mA per bunch with high efficiency Small plasma chamber  ~ 20 mm / L ~ 5 cm Arbitrary distance if gas P.Sortais et al.

NUFACT05 12 From dc to very short bunches 1 s 2  s t B 1 s t B PS SPS 2  s t B 1 s PS t 8 bunches, 50 ns total length PS: 1 s flat bottom with 16 injections. Acceleration in ~1 s to ~86.7 Tm.. Target: dc production during 1 s. 60 GHz ECR: accumulation for 1/16 s ejection of fully stripped ~50  s pulse. 16 batches during 1 s. RCS: further bunching to ~100 ns Acceleration to ~ 8 Tm. 16 repetitions during 1 s. SPS: injection of 8 bunches from PS. Acceleration to decay ring energy and ejection. 1 s7 s Post accelerator linac: acceleration to ~100 MeV/u. 16 repetitions during 1 s. t

NUFACT05 13 Decay ring design aspects The ions have to be concentrated in a few very short bunches –Suppression of atmospheric background via time structure. There is an essential need for stacking in the decay ring –Not enough flux from source and injector chain. –Lifetime is an order of magnitude larger than injector cycling (120 s compared with 8 s SPS cycle). –Need to stack for at least 10 to 15 injector cycles. Cooling is not an option for the stacking process –Electron cooling is excluded because of the high electron beam energy and, in any case, the cooling time is far too long. –Stochastic cooling is excluded by the high bunch intensities. Stacking without cooling “conflicts” with Liouville

CEA DSM Dapnia SACM A. Chancé, J. Payet14 Ring optics Arc optics Beam envelopes In the straight sections, we use FODO cells. The apertures are ±2 cm in the both plans The arc is a 2  insertion composed of regular cells and an insertion for the injection. There are 489 m of 6 T bends with a 5 cm half-aperture. At the injection point, dispersion is as high as possible (8.25 m) while the horizontal beta function is as low as possible (21.2 m). The injection septum is 18 m long with a 1 T field.

CEA DSM Dapnia SACM A. Chancé, J. Payet15 Injection Horizontal envelopes at injection Deviated beam Injected beam after one turn envelopes (cm) Septum blade s (m) Injection is located in a dispersive area The stored beam is pushed near the septum blade with 4 “kickers”. At each injection, a part of the beam is lost in the septum Fresh beam is injected off momentum on its chromatic orbit. “Kickers” are switched off before injected beam comes back During the first turn, the injected beam stays on its chromatic orbit and passes near the septum blade Injection energy depends on the distance between the deviated stored beam and the fresh beam axis Optical functions in the injection section

CEA DSM Dapnia SACM A. Chancé, J. Payet16 Parameters of the magnetic elements in the ring max QP in the injection section L (m)K (m-2)B (T) IQP43-0,017-0,80 QP family in the arc FODO cells L (m)K (m-2)B (T) QP13-0,018-0,84 QP230,0271,26 QP family in the straight sections L (m)K (m-2)B (T) DQP11-0,011-0,53 DQP210,0120,54 Bends and septa in the ring Length (m)radius (m)field (T) B14,891565,98 inj sept ext sept Injection kickers Length (m) Deviation (mrad) BL (T.m) IKI120,5630,524 IKI21-0,16-0,149 The half-aperture chosen for the magnetic elements is 5 cm The field calculations are for Helium (except for extraction septum)

NUFACT05 17 Asymmetric bunch pair merging Moves a fresh dense bunch into the core of the much larger stack and pushes less dense phase space areas to larger amplitudes until these are cut by the momentum collimation system. Central density is increased with minimal emittance dilution. Requirements: –Dual harmonic rf system. The decay ring will be equipped with 40 and 80 MHz systems (to give required bunch length of ~10 ns for physics). –Incoming bunch needs to be positioned in adjacent rf “bucket” to the stack (i.e., ~10 ns separation!).

NUFACT05 18 Simulation (in the SPS)

NUFACT05 19 Test experiment in CERN PS Ingredients –h=8 and h=16 systems of PS. –Phase and voltage variations. time energy S. Hancock, M. Benedikt and J-L.Vallet, A proof of principle of asymmetric bunch pair merging, AB-Note MD

NUFACT05 20 Beta-beam R&D The EURISOL Project –Design of an ISOL type (nuclear physics) facility. –Performance three orders of magnitude above existing facilities. –A first feasibility / conceptual design study was done within FP5. –Strong synergies with the low-energy part of the beta-beam: Ion production (proton driver, high power targets). Beam preparation (cleaning, ionization, bunching). First stage acceleration (post accelerator ~100 MeV/u). Radiation protection and safety issues. Subtasks within beta-beam task –ST 1: Design of the low-energy ring(s). –ST 2: Ion acceleration in PS/SPS and required upgrades of the existing machines including new designs to eventually replace PS/SPS. –ST 3: Design of the high-energy decay ring. –Around 38 (13 from EU) man-years for beta-beam R&D over next 4 years (only within beta-beam task, not including linked tasks).

NUFACT05 21 EURISOL

NUFACT05 22 Design study objectives Establish the limits of the first study based on existing CERN accelerators (PS and SPS) Freeze target values for annual rate at the EURISOL beta-beam facility –Close cooperation with nowg Freeze a baseline for the EURISOL beta- beam facility Produce a Conceptual Design Report (CDR) for the EURISOL beta-beam facility Produce a first cost estimate for the facility

NUFACT05 23 Challenges for the study Production Charge state distribution after ECR source The self-imposed requirement to re-use a maximum of existing infrastructure –Cycling time, aperture limitations etc. The small duty factor The activation from decay losses The high intensity ion bunches in the accelerator chain and decay ring

NUFACT05 24 Duty factor A small duty factor does not only require short bunches in the decay ring but also in the accelerator chain –Space charge limitations

NUFACT05 25 Decay losses Losses during acceleration –Full FLUKA simulations in progress for all stages (M. Magistris and M. Silari, Parameters of radiological interest for a beta-beam decay ring, TIS RP-TN). Preliminary results: –Manageable in low-energy part. –PS heavily activated (1 s flat bottom). Collimation? New machine? –SPS ok. –Decay ring losses: Tritium and sodium production in rock is well below national limits. Reasonable requirements for tunnel wall thickness to enable decommissioning of the tunnel and fixation of tritium and sodium. Heat load should be ok for superconductor. FLUKA simulated losses in surrounding rock (no public health implications)

CEA DSM Dapnia SACM A. Chancé, J. Payet26 Decay products extraction Two free straight sections after the first arc dipole enable the extraction of decay products coming from long straight sections. The decay product envelopes are plotted for disintegrations at the begin, the middle and the end of the straight section. Fluorine extraction needs an additional septum. The permanent septum for Fluorine extraction is 22.5 m long and its field is 0.6 T. Lithium extraction can be made without a septum. Lithium extraction Fluorine extraction

CEA DSM Dapnia SACM A. Chancé, J. Payet27 Decay products deposit in the arc Lithium deposit (W/m) Deviation of one decay product by one bend as a function of its length The dispersion after a L long bend with a radius equal to ρ is : By this way, we can evaluate the maximum length of a bend before the decay products are lost there. If we choose a 5 cm half aperture, half of the beam is lost for a 7 m long bend. With a 5 m long bend, there is very low deposits in the magnetic elements. Only the Lithium deposit is problematic because the Neon intensity is far below the Helium one.

NUFACT05 28 Production Target design and gas transport forms part of EURISOL DS target task –Alternative direct production at low energy with “medical cyclotron” at 100 MeV studied at LNL The production target values are challenging but not unrealistic

NUFACT05 29 EC: A monochromatic neutrino beam

NUFACT Dy Partly stripped ions: The loss due to stripping smaller than 5% per minute in the decay ring Possible to produce Dy atoms/second (1+) with 50 microAmps proton beam with existing technology (TRIUMF) An annual rate of decays along one straight section seems as a realistic target value for a design study Beyond EURISOL DS: Who will do the design? Is 150 Dy the best isotope?

NUFACT05 31 Conclusions Beta-Beam Task well integrated in the EURISOL DS EURISOL study will result in a first conceptual design report for a beta-beam facility at CERN. –We need a “STUDY 1” for the beta-beam to be considered a credible alternative to super beams and neutrino factories The annual rate of version 1 for the Beta-beam baseline does not match the earlier quoted target values –We have a lot of work ahead of us, see talk in nowg –We need a “green-field” study to establish true physics potential of the beta-beam concept (and cost). Recent new ideas promise a fascinating continuation into further developments beyond the ongoing EURISOL DS –Low energy beta-beam, EC beta-beam, High gamma beta-beam, etc.