The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,

Slides:



Advertisements
Similar presentations
(GET FAMILIAR WITH EQUIPMENT)
Advertisements

Construction Surveys
Session 2 LAND SURVEYING EQUIPMENTS Course: S0663 – Land Surveying Year: 2007.
Distance Measuring.
Lecture 15 – Geodetic Datums 23 February 2010 GISC3325.
The Comparison of API T3 and Leica AT401 in the Test and Survey CAI.Guozhu MAN. Kaidi Institute of Modern Physcis,CAS The 13 th international Workshops.
CS 128/ES Lecture 10a1 Surveying. CS 128/ES Lecture 10a2 Data for a GIS Raster data - characteristics? - sources? Vector data - characteristics?
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
GEODETIC CONTROL SURVEYS
Des Éléments Importants des Systèmes de Référence et de la Géodésie au CERN Mark Jones EN\MEF-SU.
TERRESTRIAL SURVEYING
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Chapter #1: Basics of Surveying
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
ANGLE AND DIRECTION MEASUREMENT
Measuring Distance ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
Tevatron Alignment ( ) 1 WBS Tevatron Alignment Ray Stefanski January 21, 2004 Run IIA Alignment.
B ASIC S URVEYING K NOWLEDGE FOR H IGH D EFINITION S CANNING Steven Rames, PE/LS September 12, 2013.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
GEODETIC INFRASTRUCTURE Walter Volkmann Manager of Technical Operations L. D. Bradley Land Surveyors Gainesville, Florida.
Triangulation and Trilateration
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Modern Navigation Thomas Herring MW 10:30-12:00 Room
Applied Geodesy Group Survey and Alignment of the ILC An approach to cost calculation and network simulations VLCW06 Vancouver, British Columbia, July.
SU 4100 GEODETIC POSITIONING Instructor: Indra Wijayratne.
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
LASER AND ADVANCES IN METROLOGY
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
TECHNIQUES IN BASIC SURVEYING
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
 PREPARED BY: 1.Sindha.Rinku.R 2.Trivedi.Hasti 3.Kamdar.Karan  GUIDANCE BY : ASHISH RATHOD (ASST.PROF.) Modern tools of Surveying & Mapping.
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Geography 70  Basic Geodesy  Map Projections  Coordinate Systems  Scale Locating Positions on the Earth.
Principles of the Global Positioning System Lecture 02 Prof. Thomas Herring Room A;
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
DUSEL BL WG 10 Nov 2008 Virgil Bocean 1 NuMI Geodesy and Alignment Lessons Learned Virgil Bocean DUSEL BL WG 10 Nov 2008.
Lecture 15 – Geodetic Datums 5 March 2009 GISC3325.
Geodetic Control and Datums Where is it? How Accurately can we map it?
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Application and Research on the 3-D adjustment of control network in particle accelerator Luo Tao
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
Chapter 1: Precision Survey Properties and Techniques
Workshop on Tau-Charm at High Luminosity
FCC Underground Network Simulations
The Storage Ring Control Network of NSLS-II
SPEAR Summer/Fall Downtime Alignment Schedule
Leveling.
Leveling.
Surveying With Construction Applications, 7th Edition
Leveling.
Leveling.
Revise No. 1.
Leveling.
Surveying With Construction Applications, 7th Edition
Presentation transcript:

The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that, it was necessary to create a network of survey control points and measure the positions of all components of the Tevatron. A 3D Cartesian system, with a precision of < 2.5-mm (one sigma) across the ring, was specified. With measured positions of all components in this system, a precise definition of the machine is possible. This effort is known as TeVnet. The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that, it was necessary to create a network of survey control points and measure the positions of all components of the Tevatron. A 3D Cartesian system, with a precision of < 2.5-mm (one sigma) across the ring, was specified. With measured positions of all components in this system, a precise definition of the machine is possible. This effort is known as TeVnet. The Approach: Using techniques similar to those used in the alignment of the Main Injector, establish a network of survey points in the tunnel and on the surface, prepare a pre-analysis of survey observations to achieve the objectives, perform the necessary measurements during the Fall shutdown, and perform a least-squares adjustment of the data. Equipment/Task List Two LaserTrackers Seven GPS receivers Gyro-azimuth theodolite Geodimeter Autolock robotic total station Digital levels Mekometer laser EDM Nadir telescopes Create observation points in vent shafts Install 12 observing towers Install a network of 35 DRM Tie in principal monuments of Main Injector, P-bar, and NuMI Tie network to NGS-HARN Perform network adjustment Determine magnet positions Glossary: DRM – Deep Rod Monument – lengths of aluminum rod, driven into the ground to refusal, approx meters NGS-HARN – National Geodetic Survey; HARN – High Accuracy Reference Network, in global coordinate reference frame LaserTracker – an instrument using a laser interferometer, together with horizontal and vertical angle encoders GPS – Global Positioning System, used in differential mode Murphy Line – a system of brass plugs in the tunnel, established in the early 1980s, which represent a set of tangent offset lines wrt. the quad in each cell of the Main Ring. The relationship between any two Murphy lines was only loosely known prior to the TeVnet survey. Sight-riser – A vertical penetration from the surface to the tunnel thereby allowing the transfer of control to the tunnel. Network elements: 482 LaserTracker stations LaserTracker observations LaserTracker chords 612 GPS baselines 141 Mekometer distances 24 Gyro azimuths 82 Autolock angles 14 vertical drops 893 Tunnel elev. differences 86 Surface elev. difference 1824 network control points 7 months of planning ~200 field crew man-weeks 6 loaner personnel 3 contract personnel 14 staff-months of analysis TeVnet Surveying the Big Machine Fermilab Alignment & Metrology Group

The Gazebo – the central monument for the original construction of the Main Ring These figures represent the error ellipses (two-sigma semi-major axis) under stepwise refinement. Figure 1 depicts error ellipses equivalent to the best survey possible (using the most modern equipment available today) of the Murphy Line. Figure 2 shows the same data set as Figure 1, but constrained by 14 sight-risers of the surface network shown on the poster to the left. Figure 3 adds the LaserTracker dataset to that of Figure 2. DRM schematic, drive rod with 60-pound rotary hammer; finished monument Gyro at work Observing tower over vent shaft Typical distance precision (2- sigma) for various distances