Presented by Chris Allen Unified Program Technology Services Manager October 12, 2010

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Mobile Surveyor A Windows PDA/Mobile based survey Software for easy, fast and error free data collection.
The Electronic Office Some supplementary information Corporate websites Office automation Company intranet.
1 Improving Customer Service Through Electronic Data Management & Paperless Data Delivery ~~~~~ The USEPA Region 2 Experience Linda M. Mauel Chief, Hazardous.
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
Health Insurance Oversight System (HIOS)
What’s new in RADIUS 4.0 and NJDEP Online Technology for submission.
Surfing the Data Standards: Colorado’s Path 2012 MIS Conference – San Diego Daniel Domagala, Colorado Department of Education David Butter, Deloitte Consulting.
What is it and what can it do for me?
BEDES & SEED Building Energy Data Exchange Specification & Standard Energy Efficiency Data Platform April 14, 2015 Robin Mitchell Lawrence Berkeley National.
Presented by the EPA AQS Team. Agenda Introductions Housekeeping/Overview of GoToWebinar Presentation Q& A session – use Question box to submit your questions.
XBRL in the UK Peter Calvert XBRL European Technical Meeting 5 October 2006.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Overview of Transaction Processing and Enterprise Resource Planning Systems Chapter 2.
Susan Palachek TCEQ Pollution Prevention & Education.
1 I n t e g r i t y - S e r v i c e - E x c e l l e n c e The Air Emissions Inventory (AEI) Project: An Update on a Universal Schema Darren Carpenter,
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Overview of Mini-Edit and other Tools Access DB Oracle DB You Need to Send Entries From Your Std To the Registry You Need to Get Back Updated Entries From.
“HVUT” Federal Heavy Vehicle Use Tax Update August 24, 2006.
Mobile UST Inspection System Demonstration. Devices Active Touchscreen and/or Pen Entry Light, Thin, Rugged Devices Windows 7 or 8 Internal Camera and.
Electronic Products Workshop – 2004 Division of Air Resource Management -DEP.
Systems Development Dr. Ashok Agarwal.
NEW JERSEY DISCHARGE DATA COLLECTION SYSTEM VERSION 2 LESSONS LEARNED JULY 21, 2009.
Electronic Reporting for Clean Air Act NSPS and NESHAP Regulations
Users' Meeting San Francisco, CA April 18 th, 2006 RCRAInfo Network Exchange.
Database Systems COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
Canada’s NDS Experience Office of Controlled Substances An Overview May 8, 2007.
Article: Source Code Review Systems Author: Jason Remillard Presenter: Joe Borosky Class: Principles and Applications of Software Design Date: 11/2/2005.
Training Workshop on the use of the CRF Reporter for European Community Experts Introduction Copenhagen – 12 September 2005 James Grabert Inventories sub-programme.
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 5/22/14.
Trade Software Developer Technical Seminar Document Imaging System March 7, 2012.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
California Integrated Waste Management Board 1 Waste Tire Manifest System.
State Records Office of Western Australia.NET Proof of Concept Project Slideshow: Prototype Online Disposal Authority/Recordkeeping Plan System Project.
SWIS Digital Inspections Project Update (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board August 31, 2009.
Discussion of the main data management or database building issues that may be involved in the early stages of designing a new multicentre, clinical trial.
Highlights for Regulator Users Chris Allen Unified Program Technology Services January 11, 2011.
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 9/14.
The Transportation Enterprise Data Warehouse Reporting Solutions Transportation Enterprise Data Services Office of Information Technology.
Justyna Grzywacz Chief Inspectorate of Environmental Protection 4th November,2011.
The Initiative For School Empowerment and Excellence (i.4.see) “Empowering teachers, administrators, policy makers, and parents to increase student achievement.”
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Enforcement: Viewing Company Information FMCSA Portal CSA Phase II Release 4.3, June 2013 v1.8.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Electronic Exchange of Drinking Water Lab Data Presented by: Mike Matsko NJDEP Exchange Network Users Meeting April 18, 2006.
RCRAInfo May 6, RCRAInfo: What is it? The national (mission critical) information system that supports the RCRA Subtitle C program. A national.
SWIS Digital Inspections Project Chris Allen, Information Management Branch California Integrated Waste Management Board August 22, 2008.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Spanish WFD article 13 reporting Group D meeting April 28th 2010 Brussels.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
1 Exchange Network – Why Should I participate??? Whad’ya Node? Exchange Network Node Mentoring Workshop Presented by Molly O’Neill New Orleans, Louisiana.
1 Electronic DMRs: Key to Burden Reduction and Improved NPDES Program Management David Hindin, Director, Enforcement Targeting and Data Division Office.
The Benefits of Mobile Electronic Inspection Tools 12/11/2015 Presented to:
AFS Overview, the Universal Interface, and AFS Modernization Plans Network Operations Board (NOB) Meeting October 25, 2006 David Hindin, Director Enforcement.
SWRCBSWRCBSWRCBSWRCB AB2886 Implementation San Jose Training San Jose Training July 30, 2001 Marilyn R. Arsenault ArsenaultLegg, Inc.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
ENGINEERING SERVICE CENTER EMSWeb FES-West 2009 ENVIRONMENTAL MANAGEMENT SYSTEM WEB SITE (EMSWeb) Eugene Wang NFESC -- Code 423 (805)
Leon Wirschem, REHS/HMS County of San Diego Department of Environmental Health Hazardous Materials Division
BP/ARCO GeoTracker User Experiences California CUPA Form February 2002.
NetDMR.
HCHB 2016.T2 Release August 23, 2016.
North Carolina’s Transition to CMDP
Electronic Products Workshop Division of Air Resource Management -DEP
Electronic Manifesting (e-Manifest)
Underground Injection Control
NetDMR.
10th Annual Air Quality Governance Lekgotla
Presentation transcript:

Presented by Chris Allen Unified Program Technology Services Manager October 12, 2010

 CERS 1.0 introduced Oct.2009 to meet initial AB 2286 electronic reporting requirements  Various CERS upgrades (1.x) occurring ~monthly during 2010 (see CERS Version History)CERS Version History  Many significant database and process changes to CERS needed to fully meet all electronic reporting mandates  Design work is underway  Portions of CERS 2.0 will start to be released during the 2 nd half of 2011

 A partial list… ◦ Not all Unified Program elements included (AST, Haz waste generators, etc.) ◦ Segregation of CUPA/PA workflows/approvals ◦ Difficult to determine differences between submittals ◦ No inspections/enforcement screens ◦ More linear user interface for business submittals ◦ Allow businesses to pre-validate their submittals ◦ Lots of reports…  And most importantly… ◦ Electronic data exchange

 Many complex needs—not all could be implemented in the first version  CERS 1.x based upon design/assumptions of its UNIDOCS precursor ◦ More regional orientation ◦ Mostly focused on Biz Plan and Inventory elements ◦ No hard mandates for business or regulator users

 Electronic data exchange requires full review of data dictionaries, processes, etc. ◦ Data Dictionary not designed for XML data transfer ◦ Not all processes defined (e.g., ownership changes)  Data entry via web forms can be controlled by human-driven validation/intervention…  BUT electronic data exchange is a Machine- to-Machine process with no human intervention. ◦ Ambiguity must be minimized, or manual intervention required and cost/benefit is lost.

 Unified Program Technology Services staff and contractors beginning design work ◦ Review/design of new underlying database ◦ Documentation and revision of business processes ◦ New user interface models for businesses ◦ Development of data exchange schemas  First deliverables expected Q2 of 2011  Electronic data exchange services available ~late 2011 Dates provisional on no new state budget/contracting issues

 A business’ submittal can contain some or all program elements.  Review/approval of program elements will be performed by the appropriate UPA for the businesses jurisdiction.  Different submittal/review schedules permitted and trackable by program element.  UPAs can prioritize submittal review by determining what and how many program elements a submittal includes.

 Both business and regulator users will be able to quickly determine the differences between submittals (both visually and statistically).  UPAs will be able to quickly determine pro forma submittals and instead focus on those with substantive changes/new program elements.  Differences will be stored for rapid future retrieval and for reporting.

 Separate business/regulator user interfaces will support better submittal approaches for business users: ◦ A linear approach for new/complete submittals. ◦ A focused approach for submittal updates for one or more specific programs (e.g., new UST). ◦ Better Help support for business users.  Regulator user interface can be more focused and task-based.

 A new “business” entity will support processes and associated with businesses with more than one facility.  A “business” is a collection of one or more users that can manage a collection of one or more facilities.  Unified Program would authorize users for large multi-jurisdictional businesses.  Processes still needed for “businesses” that evolve into multi-jurisdictional over time.

 Current UPDS functionality for hazardous waste generator inspections will be expanded to serve all program elements.  CERS 2 will support both the current inspection summary schema, as well as a new schema for inspections with violation details.

 More detailed validation of program element submittals will be added (e.g., blank fields, missing uploaded documents, etc.).  Web form business users will need to pass an automated “audit” prior to a submitting data (similar to tax preparation software).  Same business rules will be applied to electronic data exchange submittals (but no human intervention!)

 Addition of many reports not currently available because of anticipated database redesign.  Management reports for regulators to determine status of business reporting: ◦ Who has submitted ◦ Who has previously submitted and now overdue ◦ etc.  Separate read-only reports portal for local/state regulators, US EPA, other authorized users to view/extract CERS data.

 This is the hard part—issues and business process issues likely to arise in coming months.  Automated XML data exchange is MUCH different than “flat file” CSV/TSV/Excel uploads: ◦ Data structured in a more complex format ◦ Schema changes more flexible/less drastic coding ◦ Partial submittals allowable  If any flat file uploads supported, they will not be in real time or allow partial submittals.

 Better Document Management  More field level/specific help  Archiving of all system generated s  User-configured alerts/ticklers

 Some UP data dictionary changes will be required.  Standardization of business processes may be required across UPAs (e.g., handling new owners for an existing facility).  More coordination may be required between CUPAs and PAs than in the past.

 Participate and/or review notes of CERS Regulator User Group meetings  Provide feedback as issue/discussion papers are circulated  Patience…

 Visit the CERS Help Site ◦  Contacts ◦ Chris ◦ Dan